Exercise 45

Overhead at Two Activity Levels and Four-Variance Versus Two-Variance Analysis Greenhat Company applies factory overhead based on machine hours. The company had the following budget for its operation in 2009, which was at 80 percent level of theoretical capacity:

Standard machine hours (MH)

20,000

Variable factory overhead

$72,000

Total factory overhead rate per MH

$12.60

Greenhat budgeted its operation for 2010 at 90 percent of theoretical capacity. The standard calls for 2 machine hours per unit manufactured. During 2010 Greenhat used 23,000 machine-hours to manufacture 11,300 units. The company incurred $12,000 more factory overhead cost than the flexible-budget amount for the units manufactured, of which $5,000 was due to fixed factory overhead.

Required

1. What is the budgeted fixed factory overhead at an 80 percent level of operation? At a 100 percent level of operation?


2. What was the standard variable factory overhead rate and the standard fixed factory overhead rate in 2010? (Assume no change in the variable overhead rate.)


3. What is the total factory overhead flexible-budget amount for 2010? (Assume no cost change from 2009.)


4. Compute the following four overhead variances for the Greenhat Company:

a. Variable overhead spending variance.

b. Variable overhead efficiency variance.

c. Fixed overhead spending variance.

d. Production-volume variance.


5. Compute the following two overhead variances for the Greenhat Company:

a. Total flexible-budget variance.

b. Production-volume variance.

Step-by-step solution
Verified
like image
like image

Step 1 of 16

Variance vs Budgets:

In costing, variance is a difference occurred between planned, standard or budgeted cost and the actual cost incurred. These variances can be for both cost and revenue. These variances can be favourable or unfavourable.


Step 2 of 16


Step 3 of 16


Step 4 of 16


Step 5 of 16


Step 6 of 16


Step 7 of 16


Step 8 of 16


Step 9 of 16


Step 10 of 16


Step 11 of 16


Step 12 of 16


Step 13 of 16


Step 14 of 16


Step 15 of 16


Step 16 of 16