Deck 3: Managing the Information Systems Project

Full screen (f)
exit full mode
Question
Task identification structure refers to the process of dividing a project into manageable tasks and logically ordering them to ensure a smooth evolution between tasks.
Use Space or
up arrow
down arrow
to flip the card.
Question
A systems development project may be undertaken to take advantage of business opportunities or to solve business problems.
Question
Project planning is the first phase of the project management process in which activities are performed to assess the size,scope,and complexity of the project and to establish procedures to support later project activities.
Question
A resource analysis plan determines if the proposed information system makes sense for the organization from an economic and operational standpoint.
Question
The focus of developing a communications plan activity is to collect and organize the tools that will be used while managing the project.
Question
The project workbook serves as a repository for all project correspondence,inputs,outputs,deliverables,procedures,and standards established by the project team.
Question
A deliverable is an end product in a phase of the SDLC.
Question
Project initiation is the second phase of the project management process,which focuses on defining clear,discrete activities and the work needed to complete each activity within a single project.
Question
Establishing a relationship with the customer is a project initiation activity.
Question
The project manager is responsible for initiating,planning,executing,and closing down the project.
Question
When a project manager works closely with customers to assure project deliverables meet expectations,he/she is performing a customer relations activity.
Question
Project planning involves defining clear,discrete activities and the work needed to complete each activity within a single project.
Question
Gantt charts typically show how tasks must be ordered and when an activity should begin and end.
Question
The focus of project management is to assure that systems development projects meet customer expectations and are delivered within budget and time constraints.
Question
A logic model is a graphical representation of a project that shows each task as a horizontal bar whose length is proportional to its time for completion.
Question
Task sequence depends on which tasks produce deliverables needed in other tasks,when critical resources are available,the constraints placed on the project by the client,and the process outlined in the SDLC.
Question
In order to determine the resources required for project completion,an organization should analyze the project's scope and determine the project's probability of successful completion.
Question
Establishing the project initiation plan involves organizing an initial core of project team members to assist in accomplishing the project initiation activities.
Question
The most instrumental person to the successful completion of a project is the database analyst.
Question
When a project manager is getting projects completed through the effective utilization of resources,he/she is performing a risk and change management activity.
Question
During project execution,plans created in prior phases are put into action.
Question
The status report project team communication method is used to inform project team members.
Question
A project can terminate naturally or unnaturally.
Question
Projects are deemed a success or failure at project closedown.
Question
Creating a work breakdown structure requires that you decompose phases into activities and activities into specific tasks.
Question
When executing the Baseline Project Plan,the project manager will initiate the execution of project activities,acquire and assign resources,orient and train new team members,keep the project on schedule,and assure the quality of project deliverables.
Question
The hallway discussion project team communication method has a medium to high formality rating.
Question
Team members are assessed as part of the conducting postproject reviews activity.
Question
Within the context of the SDLC,project closedown occurs when the design phase is completed.
Question
A Project Scope Statement is developed during the project execution phase.
Question
Gantt charts typically do not show how tasks must be ordered.
Question
When compared to network diagrams,Gantt charts are more useful for depicting the activities associated with large projects.
Question
During the development of a preliminary schedule activity,you specify how various deliverables are produced and tested by you and your project team.
Question
Project time estimates for task completion and overall system quality are significantly influenced by the assignment of people to tasks.
Question
The focus of closing the customer contract activity is to ensure that all contractual terms of the project have been met.
Question
A slipped completion date for an activity may initiate a change to the Baseline Project Plan.
Question
The Project Scope Statement provides a detailed estimate of the project's tasks and resource requirements.
Question
Having a known method or technique is characteristic of a task.
Question
A network diagram depicts project tasks and their interrelationships.
Question
The meeting minutes project team communication method has a low formality rating.
Question
A major disadvantage of the network diagram is its inability to represent completion times and show interrelationships between activities.
Question
A controlled process of initiating,planning,executing,and closing down a project best defines:

A)systems development
B)project management
C)project development
D)systems management
Question
Influencing the activities of others toward the attainment of a common goal through the use of intelligence,personality,and abilities refers to which of the following project manager activities?

A)conflict management
B)management
C)leadership
D)team management
Question
Which of the following are primary reasons for undertaking systems development projects?

A)to take advantage of business opportunities
B)to solve business problems
C)to use state-of-the-art technology
D)both A and B
Question
Arguably,the most instrumental person to the successful completion of any project is the:

A)project manager
B)chief information officer
C)department manager
D)staff consultant
Question
A work method is any person,group of people,piece of equipment,or material used in accomplishing an activity.
Question
If an activity's optimistic time is 4 days,its realistic time is 10 days,and its pessimistic time is 25 days,then its estimated time would be 11.5 days.
Question
Identifying,assessing,and managing the risks and day-to-day changes that occur during a project best defines which of the following project manager activities:

A)conflict management
B)risk and change management
C)team management
D)problem solving
Question
If an activity's optimistic time is 4 weeks,its realistic time is 6 weeks,and its pessimistic time is 8 weeks,then its estimated time would be 6 weeks.
Question
An individual with a diverse set of skills - management,leadership,technical,conflict management,and customer relationship - who is responsible for initiating,planning,executing,and closing down a project best defines:

A)systems analyst
B)consultant
C)project scheduler
D)project manager
Question
A planned undertaking of related activities to reach an objective that has a beginning and an end best defines:

A)task development
B)activity plan
C)project
D)task schedule
Question
The ability to easily make changes to a project is a very powerful feature of most project management environments.
Question
Managing conflict within a project team to assure that conflict is not too high or too low best defines which of the following project manager activities:

A)conflict management
B)leadership
C)team management
D)problem solving
Question
If an activity's optimistic time is 3 months,its realistic time is 5 months,and its pessimistic time is 10 months,then its estimated time would be 5.5 months.
Question
The phase of the project management process in which activities are performed to assess the size,scope,and complexity of the project and to establish procedures to support later project activities best defines:

A)project initiation
B)scope development
C)project planning
D)project assessment
Question
Microsoft Outlook is an example of project management software.
Question
An activity on the critical path will have a slack time of 1.
Question
Critical path scheduling is a scheduling technique in which order and duration of a sequence of task activities directly affect the completion date of a project.
Question
Gantt charts visually show the time overlap of tasks whereas a network diagram does not show time overlap but does show which tasks could be done in parallel.
Question
Which of the following are project management phases?

A)closing down the project
B)planning the project
C)executing the project
D)all of the above
Question
A graphical representation of a project that shows each task as a horizontal bar whose length is proportional to its time for completion defines:

A)network diagram
B)data diagram
C)project chart
D)Gantt chart
Question
Which of the following project management activities is associated with project initiation?

A)establishing a relationship with the customer
B)describing project scope,alternatives,and feasibility
C)estimating resources and creating a detailed resource plan
D)identifying and assessing risks
Question
Which of the following is not a guideline for defining a task?

A)A task should have well accepted predecessor and successor steps.
B)A task should have a single and identifiable deliverable.
C)A task should have a known method or technique.
D)A task should always be completed by one person.
Question
Which of the following is not a project planning activity?

A)setting a Baseline Project Plan
B)identifying and assessing risk
C)determining project standards and procedures
D)establishing management procedures
Question
Changes to the Baseline Project Plan might be motivated by:

A)a slipped completion date of an activity
B)a bungled activity that must be redone
C)the identification of a new activity that becomes evident later in the project
D)all of the above
Question
Which of the following states correctly the formality and use of a project workbook?

A)In terms of formality,the project workbook would be rated low to medium.In terms of use,the project workbook would be used to inform and serve as a permanent record.
B)In terms of formality,the project workbook would be rated high.In terms of use,the project workbook would be used to resolve issues.
C)In terms of formality,the project workbook would be rated high.In terms of use,the project workbook would be used to inform and serve as a permanent record.
D)In terms of formality,the project workbook would be rated low.In terms of use,the project workbook would be used to resolve issues.
Question
An on-line or hard copy repository for all project correspondence,inputs,outputs,deliverables,procedures,and standards that is used for performing project audits,orientation of new team members,communication with management and customers,identifying future projects,and performing postproject reviews is called:

A)a project workbook
B)a schedule book
C)a project planner
D)project management software
Question
Risks can arise from:

A)the use of new technology
B)resistance to change
C)availability of critical resources
D)all of the above
Question
During which of the following activities do you use the information regarding tasks and resource availability to assign time estimates to each activity in the work breakdown structure?

A)dividing the project into manageable tasks
B)develop a preliminary schedule
C)describing project scope,alternatives,and feasibility
D)developing a Statement of Work
Question
The process of dividing the project into manageable tasks and logically ordering them to ensure a smooth evolution between tasks defines:

A)task division
B)work breakdown structure
C)work structuring
D)project division
Question
Indicating when and how written and oral reports will be provided by the team,how team members will coordinate work,what messages will be sent to announce the project to interested parties,and what kinds of information will be shared with vendors and external contractors involved with the project describes:

A)determining project standards and procedures
B)developing a Statement of Work
C)developing a communication plan
D)setting a Baseline Project Plan
Question
The third phase of the project management process in which the plans created in the prior phases are put into action is:

A)project planning
B)project execution
C)project initiation
D)project closedown
Question
Which of the following occurs during project execution?

A)monitoring project progress against the baseline plan
B)conducting post-project reviews
C)establishing the project initiation plan
D)establishing the project workbook
Question
A diagram that depicts project activities and their interrelationships is called a:

A)network diagram
B)data diagram
C)data flow diagram
D)Gantt chart
Question
Developing an understanding of the content and complexity of the project is the purpose of:

A)describing the project scope,alternatives,and feasibility
B)determining project standards and procedures
C)developing a Statement Of Work
D)setting a Baseline Project Plan
Question
Skills that include defining and sequencing activities,communicating expectations,assigning resources to activities,and monitoring outcomes best represent:

A)technical problem solving
B)management
C)leadership
D)team management
Question
Which of the following is a true statement regarding project time estimates?

A)Project time estimates for task completion and overall system quality are significantly influenced by the assignment of people to tasks.
B)Resource estimates should not be revised based upon the skills of the actual person assigned to a particular activity.
C)Staff learning can be enhanced by assigning individuals to tasks that are "over their heads."
D)Project time estimates are always on target.
Question
Skills that include interpreting system requests and specifications,site preparation and user training,and contact point for customers best represent:

A)customer relations
B)conflict management
C)leadership
D)team management
Question
Defining the necessary activities required to organize the initiation team while they are working to define the scope of the project is the focus of which of the following activities?

A)establishing the project initiation team
B)establishing management procedures
C)establishing the project initiation plan
D)establishing the project management environment and project workbook
Question
The responsibility for keeping all team members informed of the project status best describes the:

A)monitoring project progress against the Baseline Project Plan activity
B)communicating the project status activity
C)executing the baseline project plan activity
D)project update activity
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/167
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 3: Managing the Information Systems Project
1
Task identification structure refers to the process of dividing a project into manageable tasks and logically ordering them to ensure a smooth evolution between tasks.
False
2
A systems development project may be undertaken to take advantage of business opportunities or to solve business problems.
True
3
Project planning is the first phase of the project management process in which activities are performed to assess the size,scope,and complexity of the project and to establish procedures to support later project activities.
False
4
A resource analysis plan determines if the proposed information system makes sense for the organization from an economic and operational standpoint.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
5
The focus of developing a communications plan activity is to collect and organize the tools that will be used while managing the project.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
6
The project workbook serves as a repository for all project correspondence,inputs,outputs,deliverables,procedures,and standards established by the project team.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
7
A deliverable is an end product in a phase of the SDLC.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
8
Project initiation is the second phase of the project management process,which focuses on defining clear,discrete activities and the work needed to complete each activity within a single project.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
9
Establishing a relationship with the customer is a project initiation activity.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
10
The project manager is responsible for initiating,planning,executing,and closing down the project.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
11
When a project manager works closely with customers to assure project deliverables meet expectations,he/she is performing a customer relations activity.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
12
Project planning involves defining clear,discrete activities and the work needed to complete each activity within a single project.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
13
Gantt charts typically show how tasks must be ordered and when an activity should begin and end.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
14
The focus of project management is to assure that systems development projects meet customer expectations and are delivered within budget and time constraints.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
15
A logic model is a graphical representation of a project that shows each task as a horizontal bar whose length is proportional to its time for completion.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
16
Task sequence depends on which tasks produce deliverables needed in other tasks,when critical resources are available,the constraints placed on the project by the client,and the process outlined in the SDLC.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
17
In order to determine the resources required for project completion,an organization should analyze the project's scope and determine the project's probability of successful completion.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
18
Establishing the project initiation plan involves organizing an initial core of project team members to assist in accomplishing the project initiation activities.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
19
The most instrumental person to the successful completion of a project is the database analyst.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
20
When a project manager is getting projects completed through the effective utilization of resources,he/she is performing a risk and change management activity.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
21
During project execution,plans created in prior phases are put into action.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
22
The status report project team communication method is used to inform project team members.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
23
A project can terminate naturally or unnaturally.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
24
Projects are deemed a success or failure at project closedown.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
25
Creating a work breakdown structure requires that you decompose phases into activities and activities into specific tasks.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
26
When executing the Baseline Project Plan,the project manager will initiate the execution of project activities,acquire and assign resources,orient and train new team members,keep the project on schedule,and assure the quality of project deliverables.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
27
The hallway discussion project team communication method has a medium to high formality rating.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
28
Team members are assessed as part of the conducting postproject reviews activity.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
29
Within the context of the SDLC,project closedown occurs when the design phase is completed.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
30
A Project Scope Statement is developed during the project execution phase.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
31
Gantt charts typically do not show how tasks must be ordered.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
32
When compared to network diagrams,Gantt charts are more useful for depicting the activities associated with large projects.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
33
During the development of a preliminary schedule activity,you specify how various deliverables are produced and tested by you and your project team.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
34
Project time estimates for task completion and overall system quality are significantly influenced by the assignment of people to tasks.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
35
The focus of closing the customer contract activity is to ensure that all contractual terms of the project have been met.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
36
A slipped completion date for an activity may initiate a change to the Baseline Project Plan.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
37
The Project Scope Statement provides a detailed estimate of the project's tasks and resource requirements.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
38
Having a known method or technique is characteristic of a task.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
39
A network diagram depicts project tasks and their interrelationships.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
40
The meeting minutes project team communication method has a low formality rating.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
41
A major disadvantage of the network diagram is its inability to represent completion times and show interrelationships between activities.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
42
A controlled process of initiating,planning,executing,and closing down a project best defines:

A)systems development
B)project management
C)project development
D)systems management
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
43
Influencing the activities of others toward the attainment of a common goal through the use of intelligence,personality,and abilities refers to which of the following project manager activities?

A)conflict management
B)management
C)leadership
D)team management
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
44
Which of the following are primary reasons for undertaking systems development projects?

A)to take advantage of business opportunities
B)to solve business problems
C)to use state-of-the-art technology
D)both A and B
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
45
Arguably,the most instrumental person to the successful completion of any project is the:

A)project manager
B)chief information officer
C)department manager
D)staff consultant
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
46
A work method is any person,group of people,piece of equipment,or material used in accomplishing an activity.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
47
If an activity's optimistic time is 4 days,its realistic time is 10 days,and its pessimistic time is 25 days,then its estimated time would be 11.5 days.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
48
Identifying,assessing,and managing the risks and day-to-day changes that occur during a project best defines which of the following project manager activities:

A)conflict management
B)risk and change management
C)team management
D)problem solving
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
49
If an activity's optimistic time is 4 weeks,its realistic time is 6 weeks,and its pessimistic time is 8 weeks,then its estimated time would be 6 weeks.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
50
An individual with a diverse set of skills - management,leadership,technical,conflict management,and customer relationship - who is responsible for initiating,planning,executing,and closing down a project best defines:

A)systems analyst
B)consultant
C)project scheduler
D)project manager
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
51
A planned undertaking of related activities to reach an objective that has a beginning and an end best defines:

A)task development
B)activity plan
C)project
D)task schedule
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
52
The ability to easily make changes to a project is a very powerful feature of most project management environments.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
53
Managing conflict within a project team to assure that conflict is not too high or too low best defines which of the following project manager activities:

A)conflict management
B)leadership
C)team management
D)problem solving
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
54
If an activity's optimistic time is 3 months,its realistic time is 5 months,and its pessimistic time is 10 months,then its estimated time would be 5.5 months.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
55
The phase of the project management process in which activities are performed to assess the size,scope,and complexity of the project and to establish procedures to support later project activities best defines:

A)project initiation
B)scope development
C)project planning
D)project assessment
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
56
Microsoft Outlook is an example of project management software.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
57
An activity on the critical path will have a slack time of 1.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
58
Critical path scheduling is a scheduling technique in which order and duration of a sequence of task activities directly affect the completion date of a project.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
59
Gantt charts visually show the time overlap of tasks whereas a network diagram does not show time overlap but does show which tasks could be done in parallel.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
60
Which of the following are project management phases?

A)closing down the project
B)planning the project
C)executing the project
D)all of the above
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
61
A graphical representation of a project that shows each task as a horizontal bar whose length is proportional to its time for completion defines:

A)network diagram
B)data diagram
C)project chart
D)Gantt chart
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
62
Which of the following project management activities is associated with project initiation?

A)establishing a relationship with the customer
B)describing project scope,alternatives,and feasibility
C)estimating resources and creating a detailed resource plan
D)identifying and assessing risks
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
63
Which of the following is not a guideline for defining a task?

A)A task should have well accepted predecessor and successor steps.
B)A task should have a single and identifiable deliverable.
C)A task should have a known method or technique.
D)A task should always be completed by one person.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
64
Which of the following is not a project planning activity?

A)setting a Baseline Project Plan
B)identifying and assessing risk
C)determining project standards and procedures
D)establishing management procedures
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
65
Changes to the Baseline Project Plan might be motivated by:

A)a slipped completion date of an activity
B)a bungled activity that must be redone
C)the identification of a new activity that becomes evident later in the project
D)all of the above
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
66
Which of the following states correctly the formality and use of a project workbook?

A)In terms of formality,the project workbook would be rated low to medium.In terms of use,the project workbook would be used to inform and serve as a permanent record.
B)In terms of formality,the project workbook would be rated high.In terms of use,the project workbook would be used to resolve issues.
C)In terms of formality,the project workbook would be rated high.In terms of use,the project workbook would be used to inform and serve as a permanent record.
D)In terms of formality,the project workbook would be rated low.In terms of use,the project workbook would be used to resolve issues.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
67
An on-line or hard copy repository for all project correspondence,inputs,outputs,deliverables,procedures,and standards that is used for performing project audits,orientation of new team members,communication with management and customers,identifying future projects,and performing postproject reviews is called:

A)a project workbook
B)a schedule book
C)a project planner
D)project management software
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
68
Risks can arise from:

A)the use of new technology
B)resistance to change
C)availability of critical resources
D)all of the above
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
69
During which of the following activities do you use the information regarding tasks and resource availability to assign time estimates to each activity in the work breakdown structure?

A)dividing the project into manageable tasks
B)develop a preliminary schedule
C)describing project scope,alternatives,and feasibility
D)developing a Statement of Work
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
70
The process of dividing the project into manageable tasks and logically ordering them to ensure a smooth evolution between tasks defines:

A)task division
B)work breakdown structure
C)work structuring
D)project division
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
71
Indicating when and how written and oral reports will be provided by the team,how team members will coordinate work,what messages will be sent to announce the project to interested parties,and what kinds of information will be shared with vendors and external contractors involved with the project describes:

A)determining project standards and procedures
B)developing a Statement of Work
C)developing a communication plan
D)setting a Baseline Project Plan
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
72
The third phase of the project management process in which the plans created in the prior phases are put into action is:

A)project planning
B)project execution
C)project initiation
D)project closedown
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
73
Which of the following occurs during project execution?

A)monitoring project progress against the baseline plan
B)conducting post-project reviews
C)establishing the project initiation plan
D)establishing the project workbook
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
74
A diagram that depicts project activities and their interrelationships is called a:

A)network diagram
B)data diagram
C)data flow diagram
D)Gantt chart
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
75
Developing an understanding of the content and complexity of the project is the purpose of:

A)describing the project scope,alternatives,and feasibility
B)determining project standards and procedures
C)developing a Statement Of Work
D)setting a Baseline Project Plan
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
76
Skills that include defining and sequencing activities,communicating expectations,assigning resources to activities,and monitoring outcomes best represent:

A)technical problem solving
B)management
C)leadership
D)team management
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
77
Which of the following is a true statement regarding project time estimates?

A)Project time estimates for task completion and overall system quality are significantly influenced by the assignment of people to tasks.
B)Resource estimates should not be revised based upon the skills of the actual person assigned to a particular activity.
C)Staff learning can be enhanced by assigning individuals to tasks that are "over their heads."
D)Project time estimates are always on target.
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
78
Skills that include interpreting system requests and specifications,site preparation and user training,and contact point for customers best represent:

A)customer relations
B)conflict management
C)leadership
D)team management
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
79
Defining the necessary activities required to organize the initiation team while they are working to define the scope of the project is the focus of which of the following activities?

A)establishing the project initiation team
B)establishing management procedures
C)establishing the project initiation plan
D)establishing the project management environment and project workbook
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
80
The responsibility for keeping all team members informed of the project status best describes the:

A)monitoring project progress against the Baseline Project Plan activity
B)communicating the project status activity
C)executing the baseline project plan activity
D)project update activity
Unlock Deck
Unlock for access to all 167 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 167 flashcards in this deck.