The return on investment (ROI) method of cost-benefit analysis measures the effectiveness of management in generating profits with its available assets.
Use Space or
up arrow
down arrow
to flip the card.
Question
Open-source applications are basically the same as a proprietary application except for licensing, payment, and support.
Question
The application portfolio in an organization is a set of recommended applications resulting from the planning and justification process in application development.
Question
Adding functions after a project has been initiated is called scope creep.
Question
Software rental is a method of delivering software in which a vendor hosts the applications and customers use them over a network, typically the Internet.
Question
The buy option is particularly attractive if the software vendor allows the company to modify the package to meet its needs.
Question
The IS operational plan is a set of projects that will be executed by the IS department and by functional area managers.
Question
Technical feasibility determines if the project is an acceptable financial risk and if the organization can afford the expense and time needed to complete the project.
Question
Insourcing application development is usually less time consuming and less expensive than buying or leasing.
Question
The SDLC is relatively inflexible.
Question
The SDLC encourages changes to user requirements once they have been established.
Question
IT architecture focuses only on the technical aspects of information resources.
Question
Systems analysis describes how a system will solve the business problem, and systems design describes what the system must do to accomplish the task.
Question
Maintenance ends when the new system is implemented and has run long enough for a systems audit.
Question
Systems maintenance includes debugging and updating a system.
Question
The earlier in the development process that errors are detected, the less expensive they are to correct.
Question
The IT infrastructure delineates the way an organization's information resources should be used to accomplish its mission.
Question
In a direct conversion, the new system is turned on, and the old system is turned off at a later time.
Question
Costs are harder to quantify than benefits.
Question
Pilot conversion is the process in which the new system is introduced in one part of the organization.
Question
A key principle of the scrum approach for agile development is that users cannot change their minds during a project.
Question
With agile development, a company develops only what it needs right now to be successful.
Question
Evaluating the benefits of IT projects is more complex than evaluating their costs for all of the following reasons except:

A) Benefits are harder than costs to quantify.
B) Benefits tend to be more tangible than costs.
C) IT can be used for several different purposes.
D) The probability of obtaining a return from an IT investment is based on the probability of implementation success.
E) The proposed system may be "cutting edge."
Question
Object-oriented development focuses on properties and operations.
Question
Which of the following systems acquisition methods saves the company's time, enables the company to select software that has been used for similar problems in other organizations, and allows the company to try out the software?

A) Systems development life cycle
B) Prototyping
C) End-user development
D) Buy option
E) Object-oriented development
Question
The information systems planning process proceeds in which order?

A) Organization mission - organization strategic plan - IS strategic plan - new IT architecture
B) Organization mission - IS strategic plan - organization strategic plan - IS operational plan
C) Organization strategic plan - organization mission - IS strategic plan - new IT architecture
D) IT architecture - IS strategic plan - organization strategic plan - organization mission
E) IS development projects - IS operational plan - new IT architecture - organization mission
Question
Which of the following systems acquisition methods can result in a company's acquiring software that is controlled by another company, may be difficult to enhance or modify, and may not support the desired business processes?

A) Systems development life cycle
B) Prototyping
C) End-user development
D) Buy option
E) Component-based development
Question
Refer IT's About Business 13.4 - Atlassian Helps Manage Large Software Projects: Making too much information about the projects available to the software developers will confuse them and slow down the development time.
Question
Which of the following is not a part of the typical IS operational plan?

A) The mission of the IS function
B) The organizational mission
C) The IT architecture
D) The application portfolio
E) The IS function's estimate of its goals
Question
Which of the following is not an advantage of the buy option for acquiring IS applications?

A) Few types of off-the-shelf software are available, thus limiting confusion.
B) The software can be tried out.
C) The buy option saves time.
D) The company will know what it is getting.
E) All of the above
Question
Prototyping allows the users to clarify their information requirements as they use the prototype.
Question
A company's IT application portfolio is

A) A list of existing application the company owns.
B) A list of applications that need to be updated.
C) A list of applications that need to be removed.
D) A list of applications that need to be replaced.
E) A list of application to be added or modified.
Question
Which of the following statements about determining the costs and benefits of IT investments is false?

A) Some costs are fixed.
B) Costs do not end when the system is installed.
C) Many IT projects end up being over budget.
D) Benefits are hard to quantify because implementing new technology could be used for multiple purposes.
E) Benefits are hard to quantify because they are tangible.
Question
Joint application design is used to collect user requirements.
Question
_____ is a method of delivering software in which a vendor hosts the applications and customers access these applications over the Internet.

A) Software-as-a-Service
B) Prototyping
C) Leasing the application
D) Service-oriented architecture
E) The buy option
Question
Which of the following systems acquisition methods is time consuming, costly, and may produce excessive documentation?

A) Systems development life cycle
B) Prototyping
C) End-user development
D) External acquisition
E) Object-oriented development
Question
A company's IT architecture includes all of the following except:

A) Hardware and software
B) Networks
C) Database management systems
D) The members of the IT staff
E) How IT decisions will be made
Question
Which of the following systems acquisition methods requires staff to systematically go through every step in the development process and has a lower probability of missing important user requirements?

A) Systems development life cycle
B) Prototyping
C) End-user development
D) External acquisition
E) Object-oriented development
Question
Which of the following are disadvantages of the buy option for acquiring IS applications?

A) The software may not exactly meet the company's needs.
B) The software may be impossible to modify.
C) The company will not have control over software improvements.
D) The software may not integrate with existing systems.
E) All of the above
Question
Which of the following statements is false?

A) Companies that use Software-as-a-Service are running applications on the vendor's hardware.
B) Application service providers are similar to Software-as-a-Service providers.
C) Companies that purchase open-source software cannot modify it.
D) Outsourcing refers to acquiring IT applications from outside contractors.
E) Insourcing refers to building IT applications in-house.
Question
A firm implements a new information system in one of its plants, assesses the new system's performance, and then implements the new system in its other plants. This is an example of __________ conversion.

A) Phased
B) Direct
C) Parallel
D) Pilot
E) Timely
Question
When users ask for added functionality during a systems development project, this is called:

A) User-defined software.
B) Scope creep.
C) Bloatware.
D) An out-of-control project.
E) A runaway project.
Question
Which of the following systems acquisition methods helps clarify user requirements, promotes genuine user participation, and may produce part of the final system?

A) Systems development life cycle
B) Prototyping
C) End-user development
D) External acquisition
E) Component-based development
Question
When systems are created rapidly, without a formal development methodology:

A) End users can take over the work of MIS analysts.
B) The organization quickly outgrows the new system.
C) Hardware, software, and quality standards are less important.
D) Testing and documentation may be inadequate.
E) The organization saves money.
Question
The _____ that changes are made in the systems development life cycle, the _____ expensive these changes become.

A) Sooner, less
B) Later, less
C) More frequently, more
D) More extensively, more
E) Sooner, more
Question
A firm shuts down its old COBOL legacy system and immediately starts up its new PeopleSoft ERP system. This process is called __________ conversion.

A) Phased
B) Direct
C) Parallel
D) Pilot
E) Timely
Question
Which of the following systems acquisition methods may encourage inadequate problem analysis, is not practical with large numbers of users, and may result in a company's purchasing a lower-quality system?

A) Systems development life cycle
B) Prototyping
C) End-user development
D) External acquisition
E) Component-based development
Question
The deliverable of the systems design stage is:

A) User requirements.
B) Technical system specifications.
C) The prototype.
D) The source code.
E) A working application.
Question
_____ feasibility determines if the project is an acceptable financial risk and if the organization can afford the expense and time needed to complete the project.

A) Technical
B) Economic
C) Organizational
D) Behavioral
E) Time
Question
Which of the following is not a part of systems analysis?

A) Defining the business problem
B) Identifying the causes of, and solutions to, the business problem
C) Identifying the information requirements that the solution must satisfy
D) Identifying the technical specifications of the solution
E) Gathering information about the existing system
Question
_____ feasibility addresses the human issues of an information systems project.

A) Technical
B) Economic
C) Organizational
D) Behavioral
E) Time
Question
In the traditional systems development life cycle, users:

A) Are important and ongoing members of the development team throughout the life of the project.
B) Are important only in the testing phases of the project.
C) Have no input.
D) Are important only in the maintenance phase of the project.
E) Provide information requirements.
Question
________ conversion is the riskiest type of conversion process.

A) Parallel
B) Direct
C) Pilot
D) Phased
E) They all have equal risk.
Question
Place the stages of the systems development life cycle in order:

A) Investigation - analysis - design - programming/testing - implementation - operation/maintenance
B) Investigation - design - analysis - programming/testing - implementation - operation/maintenance
C) Analysis - design - investigation - operation/maintenance - programming/testing - implementation
D) Investigation - analysis - design - programming/testing - operation/maintenance - implementation
E) Investigation - implementation - analysis - programming/testing - design - operation/maintenance
Question
As an MIS analyst, you have decided to use a prototyping methodology for a small, Web-based design project. What is the order of steps that you will follow in the project?

A) Develop the prototype; use the prototype; revise and enhance the prototype.
B) Identify user requirements; develop the prototype; use the prototype; revise and enhance the prototype.
C) Develop the prototype; identify user requirements; use the prototype; revise and enhance the prototype.
D) Identify user requirements; develop solutions; select the best prototype; implement the prototype.
E) Identify user requirements; develop the prototype; revise and enhance the prototype.
Question
_____ feasibility concerns a firm's policies and politics, power structures, and business relationships.

A) Technical
B) Economic
C) Organizational
D) Behavioral
E) Time
Question
Systems design answers the question, _____:

A) How will the information system resolve the business problem?
B) How much will the information system cost?
C) What is the problem the information system must address?
D) Who will benefit from use of the information system being developed?
E) What is the effective operational life of the system?
Question
In the _____ stage of the systems development life cycle, the design specifications are translated into computer code.

A) Systems analysis
B) Programming
C) Systems design
D) Prototyping
E) Feasibility study
Question
As systems age, maintenance costs _____.

A) Decrease
B) Increase
C) Remain the same
D) Are negligible
E) Are not considered
Question
Which of the following statements about scope creep is true?

A) Scope creep is relatively cheap, regardless of when it occurs in a project.
B) Because scope creep is relatively cheap, successful project managers allow it.
C) Because scope creep is expensive, successful project managers will not allow it.
D) Because scope creep is expensive, successful project managers limit it.
E) Scope creep means that user requirements are being successfully taken care of.
Question
Compare and contrast the various strategies for acquiring IT applications.
Section reference 1: Strategies for acquiring IT Applications
Question
_____ is a software development methodology that delivers functionality in rapid iterations, usually measured in weeks.

A) Agile development
B) Prototyping
C) The systems development life cycle
D) Joint application development
E) Component-based development
Question
Object-oriented development

A) Is similar to traditional development approaches.
B) Focuses on the original task to be handled.
C) Focuses on the processes that must be modeled to perform that task.
D) Focuses on data.
E) Identifies the subjects of the new system.
Question
Compare and contrast rapid application development and joint application design.
Section reference 1: Alternative Methods and Tools for Systems Development
Question
The _____ approach to systems development is a group-based tool for collecting user requirements.

A) Integrated computer-assisted software engineering
B) Joint application design
C) Rapid application development
D) Prototyping
E) Systems development life cycle
Question
Contrast agile development and the SDLC.
Section reference 1: Alternative Methods and Tools for Systems Development
Question
Refer IT's About Business 13.3 - General Motors Insources Its Information Technology Function: Based on reading the case, GM's decision to switch from outsourcing to in-house development was motivated by which of the following factors?

A) Outsourcing is more expensive than in-sourcing
B) They wanted to retrain existing employees to develop software
C) They wanted shorted lead times
D) They did not want their strategy to be known by outsiders
E) Government incentives to use American developers
Question
Which of the following is not an advantage of the joint application design approach to systems development?

A) It involves fewer users in the development process.
B) It saves time.
C) It results in greater user acceptance of the new system.
D) It can produce a higher-quality system.
E) It provides for greater user participation in the definition of the requirements.
Question
Contrast the tangible and intangible benefits of a proposed information system.
Section reference 1: Planning for and Justifying IT Applications
Question
Describe the feasibility study of the SDLC, and discuss why this study is so important.
Section reference 1: The Traditional Systems Development Life Cycle
Question
Refer to Closing Case - Putting It All Together: Which of the following statements is not true about Chubb Insurance's strategy

A) Considerable effort was made to explain the advantages of the unified architecture to employees
B) The unified architecture reduced costs
C) The unified architecture is flexible and allows employees to use technologies of their choice
D) The unified architecture enables Chubb to make faster decisions
E) The unified architecture enables Chubb to reduce time to market
Question
Refer to Opening Case - Tweak or Trash: Which of the following statements concerning Accentures approach to rework their IT needs is not true?

A) Upgrading systems does not require the elimination of all existing systems
B) The most efficient option is to develop the new systems in-house
C) The initial costs of upgrading organization wide systems can be very high
D) Upgrading a large organization's IT systems can take years
E) Continuous minor upgrades (or tweaking) to existing systems will ultimately hinder progress
Question
Differentiate between the IT strategic plan and the IS operational plan.
Section reference 1: Planning for and Justifying IT Applications
Question
Refer to IT's About Business 13.2 - A Disastrous Development Project: Marin County hired Deloitte Consulting to work with them on the implementation of the new SAP system. This arrangement is called ____________.

A) Insourcing
B) Outsourcing
C) Offshoring
D) Hiring part-time employees
E) SaaS
Question
Why is it so hard to justify an information system?
Section reference 1: Planning for and Justifying IT Applications
Question
Agile development

A) Takes a long time.
B) Requires little user input.
C) Delivers functionality in rapid interactions.
D) Focuses on all required functionality at each step of the way.
E) Uses the scrum approach to design the system.
Question
Which of the following systems acquisition methods may eventually require maintenance assistance from the IT department, can produce inadequate documentation, and might result in a company's acquiring a system with inadequate interfaces to existing systems?

A) Systems development life cycle
B) Prototyping
C) End-user development
D) External acquisition
E) Component-based development
Question
Contrast component-based development and the SDLC.
Section reference 1: Alternative Methods and Tools for Systems Development
Question
What are the outputs from each of the six steps in the SDLC?
Section reference 1: The Traditional Systems Development Life Cycle
Question
Refer to IT's About Business 13.1 -- Anniston Orthopaedics and Greenway Medical Technologies: Assuming that a contract can be reached and Anniston decides to install Greenway's software, which is the best implementation approach?

A) Pilot
B) Piecemeal
C) Direct
D) Parallel
E) Any one of the above will be fine.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/85
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 12: Business Intelligence
1
The return on investment (ROI) method of cost-benefit analysis measures the effectiveness of management in generating profits with its available assets.
True
2
Open-source applications are basically the same as a proprietary application except for licensing, payment, and support.
True
3
The application portfolio in an organization is a set of recommended applications resulting from the planning and justification process in application development.
True
4
Adding functions after a project has been initiated is called scope creep.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
5
Software rental is a method of delivering software in which a vendor hosts the applications and customers use them over a network, typically the Internet.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
6
The buy option is particularly attractive if the software vendor allows the company to modify the package to meet its needs.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
7
The IS operational plan is a set of projects that will be executed by the IS department and by functional area managers.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
8
Technical feasibility determines if the project is an acceptable financial risk and if the organization can afford the expense and time needed to complete the project.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
9
Insourcing application development is usually less time consuming and less expensive than buying or leasing.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
10
The SDLC is relatively inflexible.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
11
The SDLC encourages changes to user requirements once they have been established.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
12
IT architecture focuses only on the technical aspects of information resources.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
13
Systems analysis describes how a system will solve the business problem, and systems design describes what the system must do to accomplish the task.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
14
Maintenance ends when the new system is implemented and has run long enough for a systems audit.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
15
Systems maintenance includes debugging and updating a system.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
16
The earlier in the development process that errors are detected, the less expensive they are to correct.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
17
The IT infrastructure delineates the way an organization's information resources should be used to accomplish its mission.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
18
In a direct conversion, the new system is turned on, and the old system is turned off at a later time.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
19
Costs are harder to quantify than benefits.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
20
Pilot conversion is the process in which the new system is introduced in one part of the organization.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
21
A key principle of the scrum approach for agile development is that users cannot change their minds during a project.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
22
With agile development, a company develops only what it needs right now to be successful.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
23
Evaluating the benefits of IT projects is more complex than evaluating their costs for all of the following reasons except:

A) Benefits are harder than costs to quantify.
B) Benefits tend to be more tangible than costs.
C) IT can be used for several different purposes.
D) The probability of obtaining a return from an IT investment is based on the probability of implementation success.
E) The proposed system may be "cutting edge."
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
24
Object-oriented development focuses on properties and operations.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following systems acquisition methods saves the company's time, enables the company to select software that has been used for similar problems in other organizations, and allows the company to try out the software?

A) Systems development life cycle
B) Prototyping
C) End-user development
D) Buy option
E) Object-oriented development
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
26
The information systems planning process proceeds in which order?

A) Organization mission - organization strategic plan - IS strategic plan - new IT architecture
B) Organization mission - IS strategic plan - organization strategic plan - IS operational plan
C) Organization strategic plan - organization mission - IS strategic plan - new IT architecture
D) IT architecture - IS strategic plan - organization strategic plan - organization mission
E) IS development projects - IS operational plan - new IT architecture - organization mission
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
27
Which of the following systems acquisition methods can result in a company's acquiring software that is controlled by another company, may be difficult to enhance or modify, and may not support the desired business processes?

A) Systems development life cycle
B) Prototyping
C) End-user development
D) Buy option
E) Component-based development
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
28
Refer IT's About Business 13.4 - Atlassian Helps Manage Large Software Projects: Making too much information about the projects available to the software developers will confuse them and slow down the development time.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
29
Which of the following is not a part of the typical IS operational plan?

A) The mission of the IS function
B) The organizational mission
C) The IT architecture
D) The application portfolio
E) The IS function's estimate of its goals
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
30
Which of the following is not an advantage of the buy option for acquiring IS applications?

A) Few types of off-the-shelf software are available, thus limiting confusion.
B) The software can be tried out.
C) The buy option saves time.
D) The company will know what it is getting.
E) All of the above
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
31
Prototyping allows the users to clarify their information requirements as they use the prototype.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
32
A company's IT application portfolio is

A) A list of existing application the company owns.
B) A list of applications that need to be updated.
C) A list of applications that need to be removed.
D) A list of applications that need to be replaced.
E) A list of application to be added or modified.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
33
Which of the following statements about determining the costs and benefits of IT investments is false?

A) Some costs are fixed.
B) Costs do not end when the system is installed.
C) Many IT projects end up being over budget.
D) Benefits are hard to quantify because implementing new technology could be used for multiple purposes.
E) Benefits are hard to quantify because they are tangible.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
34
Joint application design is used to collect user requirements.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
35
_____ is a method of delivering software in which a vendor hosts the applications and customers access these applications over the Internet.

A) Software-as-a-Service
B) Prototyping
C) Leasing the application
D) Service-oriented architecture
E) The buy option
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
36
Which of the following systems acquisition methods is time consuming, costly, and may produce excessive documentation?

A) Systems development life cycle
B) Prototyping
C) End-user development
D) External acquisition
E) Object-oriented development
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
37
A company's IT architecture includes all of the following except:

A) Hardware and software
B) Networks
C) Database management systems
D) The members of the IT staff
E) How IT decisions will be made
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
38
Which of the following systems acquisition methods requires staff to systematically go through every step in the development process and has a lower probability of missing important user requirements?

A) Systems development life cycle
B) Prototyping
C) End-user development
D) External acquisition
E) Object-oriented development
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
39
Which of the following are disadvantages of the buy option for acquiring IS applications?

A) The software may not exactly meet the company's needs.
B) The software may be impossible to modify.
C) The company will not have control over software improvements.
D) The software may not integrate with existing systems.
E) All of the above
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
40
Which of the following statements is false?

A) Companies that use Software-as-a-Service are running applications on the vendor's hardware.
B) Application service providers are similar to Software-as-a-Service providers.
C) Companies that purchase open-source software cannot modify it.
D) Outsourcing refers to acquiring IT applications from outside contractors.
E) Insourcing refers to building IT applications in-house.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
41
A firm implements a new information system in one of its plants, assesses the new system's performance, and then implements the new system in its other plants. This is an example of __________ conversion.

A) Phased
B) Direct
C) Parallel
D) Pilot
E) Timely
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
42
When users ask for added functionality during a systems development project, this is called:

A) User-defined software.
B) Scope creep.
C) Bloatware.
D) An out-of-control project.
E) A runaway project.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
43
Which of the following systems acquisition methods helps clarify user requirements, promotes genuine user participation, and may produce part of the final system?

A) Systems development life cycle
B) Prototyping
C) End-user development
D) External acquisition
E) Component-based development
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
44
When systems are created rapidly, without a formal development methodology:

A) End users can take over the work of MIS analysts.
B) The organization quickly outgrows the new system.
C) Hardware, software, and quality standards are less important.
D) Testing and documentation may be inadequate.
E) The organization saves money.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
45
The _____ that changes are made in the systems development life cycle, the _____ expensive these changes become.

A) Sooner, less
B) Later, less
C) More frequently, more
D) More extensively, more
E) Sooner, more
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
46
A firm shuts down its old COBOL legacy system and immediately starts up its new PeopleSoft ERP system. This process is called __________ conversion.

A) Phased
B) Direct
C) Parallel
D) Pilot
E) Timely
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
47
Which of the following systems acquisition methods may encourage inadequate problem analysis, is not practical with large numbers of users, and may result in a company's purchasing a lower-quality system?

A) Systems development life cycle
B) Prototyping
C) End-user development
D) External acquisition
E) Component-based development
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
48
The deliverable of the systems design stage is:

A) User requirements.
B) Technical system specifications.
C) The prototype.
D) The source code.
E) A working application.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
49
_____ feasibility determines if the project is an acceptable financial risk and if the organization can afford the expense and time needed to complete the project.

A) Technical
B) Economic
C) Organizational
D) Behavioral
E) Time
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
50
Which of the following is not a part of systems analysis?

A) Defining the business problem
B) Identifying the causes of, and solutions to, the business problem
C) Identifying the information requirements that the solution must satisfy
D) Identifying the technical specifications of the solution
E) Gathering information about the existing system
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
51
_____ feasibility addresses the human issues of an information systems project.

A) Technical
B) Economic
C) Organizational
D) Behavioral
E) Time
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
52
In the traditional systems development life cycle, users:

A) Are important and ongoing members of the development team throughout the life of the project.
B) Are important only in the testing phases of the project.
C) Have no input.
D) Are important only in the maintenance phase of the project.
E) Provide information requirements.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
53
________ conversion is the riskiest type of conversion process.

A) Parallel
B) Direct
C) Pilot
D) Phased
E) They all have equal risk.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
54
Place the stages of the systems development life cycle in order:

A) Investigation - analysis - design - programming/testing - implementation - operation/maintenance
B) Investigation - design - analysis - programming/testing - implementation - operation/maintenance
C) Analysis - design - investigation - operation/maintenance - programming/testing - implementation
D) Investigation - analysis - design - programming/testing - operation/maintenance - implementation
E) Investigation - implementation - analysis - programming/testing - design - operation/maintenance
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
55
As an MIS analyst, you have decided to use a prototyping methodology for a small, Web-based design project. What is the order of steps that you will follow in the project?

A) Develop the prototype; use the prototype; revise and enhance the prototype.
B) Identify user requirements; develop the prototype; use the prototype; revise and enhance the prototype.
C) Develop the prototype; identify user requirements; use the prototype; revise and enhance the prototype.
D) Identify user requirements; develop solutions; select the best prototype; implement the prototype.
E) Identify user requirements; develop the prototype; revise and enhance the prototype.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
56
_____ feasibility concerns a firm's policies and politics, power structures, and business relationships.

A) Technical
B) Economic
C) Organizational
D) Behavioral
E) Time
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
57
Systems design answers the question, _____:

A) How will the information system resolve the business problem?
B) How much will the information system cost?
C) What is the problem the information system must address?
D) Who will benefit from use of the information system being developed?
E) What is the effective operational life of the system?
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
58
In the _____ stage of the systems development life cycle, the design specifications are translated into computer code.

A) Systems analysis
B) Programming
C) Systems design
D) Prototyping
E) Feasibility study
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
59
As systems age, maintenance costs _____.

A) Decrease
B) Increase
C) Remain the same
D) Are negligible
E) Are not considered
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
60
Which of the following statements about scope creep is true?

A) Scope creep is relatively cheap, regardless of when it occurs in a project.
B) Because scope creep is relatively cheap, successful project managers allow it.
C) Because scope creep is expensive, successful project managers will not allow it.
D) Because scope creep is expensive, successful project managers limit it.
E) Scope creep means that user requirements are being successfully taken care of.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
61
Compare and contrast the various strategies for acquiring IT applications.
Section reference 1: Strategies for acquiring IT Applications
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
62
_____ is a software development methodology that delivers functionality in rapid iterations, usually measured in weeks.

A) Agile development
B) Prototyping
C) The systems development life cycle
D) Joint application development
E) Component-based development
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
63
Object-oriented development

A) Is similar to traditional development approaches.
B) Focuses on the original task to be handled.
C) Focuses on the processes that must be modeled to perform that task.
D) Focuses on data.
E) Identifies the subjects of the new system.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
64
Compare and contrast rapid application development and joint application design.
Section reference 1: Alternative Methods and Tools for Systems Development
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
65
The _____ approach to systems development is a group-based tool for collecting user requirements.

A) Integrated computer-assisted software engineering
B) Joint application design
C) Rapid application development
D) Prototyping
E) Systems development life cycle
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
66
Contrast agile development and the SDLC.
Section reference 1: Alternative Methods and Tools for Systems Development
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
67
Refer IT's About Business 13.3 - General Motors Insources Its Information Technology Function: Based on reading the case, GM's decision to switch from outsourcing to in-house development was motivated by which of the following factors?

A) Outsourcing is more expensive than in-sourcing
B) They wanted to retrain existing employees to develop software
C) They wanted shorted lead times
D) They did not want their strategy to be known by outsiders
E) Government incentives to use American developers
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
68
Which of the following is not an advantage of the joint application design approach to systems development?

A) It involves fewer users in the development process.
B) It saves time.
C) It results in greater user acceptance of the new system.
D) It can produce a higher-quality system.
E) It provides for greater user participation in the definition of the requirements.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
69
Contrast the tangible and intangible benefits of a proposed information system.
Section reference 1: Planning for and Justifying IT Applications
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
70
Describe the feasibility study of the SDLC, and discuss why this study is so important.
Section reference 1: The Traditional Systems Development Life Cycle
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
71
Refer to Closing Case - Putting It All Together: Which of the following statements is not true about Chubb Insurance's strategy

A) Considerable effort was made to explain the advantages of the unified architecture to employees
B) The unified architecture reduced costs
C) The unified architecture is flexible and allows employees to use technologies of their choice
D) The unified architecture enables Chubb to make faster decisions
E) The unified architecture enables Chubb to reduce time to market
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
72
Refer to Opening Case - Tweak or Trash: Which of the following statements concerning Accentures approach to rework their IT needs is not true?

A) Upgrading systems does not require the elimination of all existing systems
B) The most efficient option is to develop the new systems in-house
C) The initial costs of upgrading organization wide systems can be very high
D) Upgrading a large organization's IT systems can take years
E) Continuous minor upgrades (or tweaking) to existing systems will ultimately hinder progress
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
73
Differentiate between the IT strategic plan and the IS operational plan.
Section reference 1: Planning for and Justifying IT Applications
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
74
Refer to IT's About Business 13.2 - A Disastrous Development Project: Marin County hired Deloitte Consulting to work with them on the implementation of the new SAP system. This arrangement is called ____________.

A) Insourcing
B) Outsourcing
C) Offshoring
D) Hiring part-time employees
E) SaaS
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
75
Why is it so hard to justify an information system?
Section reference 1: Planning for and Justifying IT Applications
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
76
Agile development

A) Takes a long time.
B) Requires little user input.
C) Delivers functionality in rapid interactions.
D) Focuses on all required functionality at each step of the way.
E) Uses the scrum approach to design the system.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
77
Which of the following systems acquisition methods may eventually require maintenance assistance from the IT department, can produce inadequate documentation, and might result in a company's acquiring a system with inadequate interfaces to existing systems?

A) Systems development life cycle
B) Prototyping
C) End-user development
D) External acquisition
E) Component-based development
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
78
Contrast component-based development and the SDLC.
Section reference 1: Alternative Methods and Tools for Systems Development
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
79
What are the outputs from each of the six steps in the SDLC?
Section reference 1: The Traditional Systems Development Life Cycle
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
80
Refer to IT's About Business 13.1 -- Anniston Orthopaedics and Greenway Medical Technologies: Assuming that a contract can be reached and Anniston decides to install Greenway's software, which is the best implementation approach?

A) Pilot
B) Piecemeal
C) Direct
D) Parallel
E) Any one of the above will be fine.
Unlock Deck
Unlock for access to all 85 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 85 flashcards in this deck.