Deck 16: Fundamentals of Variance Analysis

Full screen (f)
exit full mode
Question
If the budgeted activity level is greater than the actual activity level,then the total budgeted costs of the master budget will be greater than the total budgeted costs of the flexible budget.The master budget is based on the budgeted activity level,while the flexible budget is based on the actual activity level.
Use Space or
up arrow
down arrow
to flip the card.
Question
Variance analysis for fixed production costs is virtually the same as for variable production costs.There are no efficiency variances for fixed production costs.
Question
The sales price variance is the actual selling price per unit times the difference between budgeted number of units and the actual number of units sold.Sales price variance is the difference between actual and budgeted selling price times the actual number sold.
Question
In general,and holding all other things constant,an unfavorable variance decreases operating profits.Just as a favorable variance increases profits,an unfavorable variance decreases profits.
Question
In essence,the terms "master budget" and "operating budget" mean the same thing and can be used interchangeably.The operating budget is part of the master budget,along with financial budgets.
Question
The standard cost for a unit of output is the standard price per unit of input times the standard number of inputs per one unit of output.This is the definition of standard cost.
Question
It is possible to have a favorable direct material price variance and an unfavorable direct material efficiency variance.Purchasing a lower quality material will yield a favorable price variance (since it is less costly)but may result in an unfavorable efficiency because of higher than expected waste due to poor quality.
Question
A favorable variance is not necessarily good,and an unfavorable variance is not necessarily bad.A favorable or unfavorable variance in one period may have long term impacts in the opposite direction.
Question
The difference between operating profits in the master budget and operating profits in the flexible budget is called a sales price variance.This is a sales activity variance.
Question
Variances are the difference between actual results and budgeted results.This is a definition of a variance.
Question
The production volume variance is the difference between fixed costs on the flexible budget and the fixed costs on the master budget.The production volume variance is the difference between the fixed costs on the flexible budget and the fixed overhead applied to production.
Question
Both the actual material used and the standard quantity allowed for material is based on the actual output attained.Standard quantity allowed = standard per unit × actual output.
Question
The materials price variance is computed by multiplying the difference between the actual price and the standard price by the actual quantity of materials used in production.The materials price variance is computed by multiplying the difference between the actual and standard price by the actual quantity of materials purchased.
Question
Production cost variances are input variances,while sales activity variances are output variances.Costs are based on inputs,revenues are based on outputs.
Question
The sales activity variance is the result of a difference between budgeted units sold and actual units sold.This is the definition of the sales activity variance.
Question
The flexible and master budget amounts are the same for fixed marketing and administrative costs.Fixed costs do not change with changes in activity level within the relevant range.
Question
The budget (or spending)variance for fixed production costs is the difference between the actual fixed costs and the budgeted fixed costs on the master budget.This is the definition of the budget/spending variance.
Question
The direct labor efficiency variance can be the result of poor supervision or poor scheduling by divisional managers.Poor scheduling may cause wasted time.
Question
The terms "master budget" and "flexible budget" mean the same thing and can be used interchangeably.A master budget and a static budget mean the same thing.
Question
A flexible budget adjusts the static budget to reflect the actual activity level achieved during the period.This is a basic principle of a flexible budget.
Question
Which of the following statements is (are)true regarding the sales activity variance? (A)The sales activity variance is the actual selling price per unit times the difference between the budgeted units and actual units.(B)If the sales activity variance for sales revenue is unfavorable,then the contribution margin sales activity variance will be unfavorable.

A)Only A is true.
B)Only B is true.
C)Neither A and B is true.
D)Both A and B are true.
Question
The basic difference between a master budget and a flexible budget is that a:

A)flexible budget considers only variable costs but a master budget considers all costs.
B)flexible budget allows management latitude in meeting goals whereas a master budget is based upon a fixed standard.
C)master budget is for an entire production facility but a flexible budget is applicable to single departments only.
D)master budget is based on one specific level of production and a flexible budget can be prepared for any production level within a relevant range.
Question
The most fundamental variance analysis compares:

A)standard material prices with actual material prices.
B)standard direct labor rates with actual direct labor rates.
C)budgeted sales revenue with actual sales revenue.
D)budgeted operating income with actual operating income.
Question
Which of the following statements is (are)true? (A)A favorable variance is not necessarily good,and an unfavorable variance is not necessarily bad.(B)The master budget includes operating budgets (e.g. ,production budget)and financial budgets (e.g. ,cash budget).

A)Only A is true.
B)Only B is true.
C)Both A and B are true.
D)Neither A nor B is true.
Question
When using a flexible budget,what will happen to variable costs on a per-unit basis as production increases within the relevant range?

A)Decrease.
B)Increase.
C)Remain unchanged.
D)Fixed costs are not considered in flexible budgeting.
Question
The sales price variance is the difference between the actual sales revenues and the:

A)budgeted selling price multiplied by the budgeted number of units sold.
B)budgeted selling price multiplied by the actual number of units sold.
C)actual selling price multiplied by the budgeted number of units sold.
D)actual selling price multiplied by the actual number of units solD.The sales price variance is derived from the difference between the actual revenue and budgeted selling price multiplied by the actual number of units solD.
Question
The purpose of the flexible budget is to:

A)allow management some latitude in meeting goals.
B)eliminate cyclical fluctuations in production reports by ignoring variable costs.
C)compare actual and budgeted results at virtually any level of production.
D)reduce the total time in preparing the annual budget.
Question
The difference between operating profits in the master budget and operating profits in the flexible budget is called:

A)sales activity variance.
B)flexible budget variance.
C)production volume variance.
D)total operating profit variance.
Question
The slope of the flexible budget-line is the:

A)selling price per unit.
B)variable cost per unit.
C)fixed cost per unit.
D)contribution margin per unit.
Question
Which of the following statements regarding variances is (are)false? (A)In general and holding all other things constant,an unfavorable variance decreases operating profits.(B)A favorable variance is not always good,and an unfavorable variance is not always bad.

A)Only A is false.
B)Only B is false.
C)Both A and B are false.
D)Neither A nor B is false.
Question
Which department is customarily held responsible for an unfavorable materials quantity variance?

A)Quality control.
B)Purchasing.
C)Engineering.
D)Production.
Question
When are the following direct materials variances ideally reported? <strong>When are the following direct materials variances ideally reported?  </strong> A)Option a B)Option b C)Option c D)Option d <div style=padding-top: 35px>

A)Option a
B)Option b
C)Option c
D)Option d
Question
A variance can best be described as:

A)benchmarks common to other firms in the same industry.
B)differences between planned results and actual results.
C)useful for performance evaluations but not making decisions.
D)generally accepted accounting principles when standards are useD.Variances are internal to a company and are useful for decision making as well as performance evaluation.The statement is a basic explanation of a variance.
Question
If the total materials variance for a given operation is favorable,why must this variance be further evaluated as to price and usage?

A)There is no need to further evaluate the total materials variance if it is favorable.
B)Generally accepted accounting principles require that all variances be analyzed in three stages.
C)All variances must appear in the annual report to equity owners for proper disclosure.
D)A further evaluation lets management evaluate the activities of the purchasing and production functions.
Question
The intercept of the flexible budget-line is total:

A)sales.
B)variable costs.
C)fixed costs.
D)contribution margin.
Question
In general,the terms favorable and unfavorable are used to describe the effect of a variance on:

A)net income.
B)sales revenue.
C)production costs.
D)operating expenses.
Question
In the general model,a price variance is calculated as:

A)(AP × AQ)- (AP × SQ)
B)(AP × SQ)- (SP × SQ)
C)(AP × AQ)- (SP × AQ)
D)(AP × AQ)- (SP × SQ)
Question
Which of the following variances will always be favorable when actual sales exceeds budgeted sales?

A)Variable cost.
B)Fixed cost.
C)Sales activity.
D)Operating profit.
Question
An operating budget would not include a:

A)cash budget.
B)sales budget.
C)labor budget.
D)production budget.
Question
In the general model,an efficiency variance is calculated as:

A)(SP × AQ)- (SP × SQ)
B)(AP × SQ)- (SP × SQ)
C)(AP × AQ)- (SP × SQ)
D)(AP × AQ)- (SP × AQ)
Question
<strong>  What is the flexible budget contribution margin?</strong> A)$39,000. B)$45,000. C)$52,000. D)$58,000. <div style=padding-top: 35px> What is the flexible budget contribution margin?

A)$39,000.
B)$45,000.
C)$52,000.
D)$58,000.
Question
Which variance will be unfavorable due to employees working more hours than allowed for the actual number of units produced?

A)Price (rate).
B)Efficiency.
C)Sales activity.
D)Production volume.
Question
The production volume variance is computed by the difference between the:

A)actual fixed overhead and applied fixed overhead.
B)actual fixed overhead and budget at actual level of activity reached.
C)actual fixed overhead and budget at denominator level of activity planned.
D)budget at actual levels of activity reached and fixed overhead applieD.Production volume = budget - applieD.
Question
Which of the following direct labor variances uses the standard hours allowed for the actual number of units produced? <strong>Which of the following direct labor variances uses the standard hours allowed for the actual number of units produced?  </strong> A)Option a B)Option b C)Option c D)Option d <div style=padding-top: 35px>

A)Option a
B)Option b
C)Option c
D)Option d
Question
<strong>  What is the actual sales revenue?</strong> A)$156,000. B)$169,000. C)$180,000. D)$191,000. <div style=padding-top: 35px> What is the actual sales revenue?

A)$156,000.
B)$169,000.
C)$180,000.
D)$191,000.
Question
Which of the following is not an alternative name for the production volume variance?

A)Capacity variance.
B)Idle capacity variance.
C)Denominator variance.
D)Fixed overhead efficiency variance.
Question
Arrow Industries employs a standard cost system in which direct materials inventory is carried at standard cost.Arrow has established the following standards for the prime costs of one unit of product. <strong>Arrow Industries employs a standard cost system in which direct materials inventory is carried at standard cost.Arrow has established the following standards for the prime costs of one unit of product.   During November,Arrow purchased 160,000 pounds of direct materials at a total cost of $304,000.The total factory wages for November were $42,000,90% of which were for direct labor.Arrow manufactured 19,000 units of product during November using 142,500 pounds of direct materials and 5,000 direct labor hours.What is the direct materials efficiency (quantity)variance for November?</strong> A)$14,250. B)$14,400. C)$16,000. D)$17,100. <div style=padding-top: 35px> During November,Arrow purchased 160,000 pounds of direct materials at a total cost of $304,000.The total factory wages for November were $42,000,90% of which were for direct labor.Arrow manufactured 19,000 units of product during November using 142,500 pounds of direct materials and 5,000 direct labor hours.What is the direct materials efficiency (quantity)variance for November?

A)$14,250.
B)$14,400.
C)$16,000.
D)$17,100.
Question
<strong>  What is the master budget contribution margin?</strong> A)$52,000. B)$47,500. C)$45,000. D)$39,000. <div style=padding-top: 35px> What is the master budget contribution margin?

A)$52,000.
B)$47,500.
C)$45,000.
D)$39,000.
Question
The production volume variance must be computed when a company uses:

A)activity-based costing.
B)process costing.
C)job-order costing.
D)full-absorption costing.
Question
A debit balance in the labor-efficiency variance account indicates that:

A)standard hours exceed actual hours.
B)actual hours exceed standard hours.
C)standard rate and standard hours exceed actual rate and actual hours.
D)actual rate and actual hours exceed standard rate and standard hours.
Question
The variable overhead price variance is due to:

A)price items only.
B)efficiency items only.
C)both price and efficiency items.
D)neither price or efficiency items.
Question
Arrow Industries employs a standard cost system in which direct materials inventory is carried at standard cost.Arrow has established the following standards for the prime costs of one unit of product. <strong>Arrow Industries employs a standard cost system in which direct materials inventory is carried at standard cost.Arrow has established the following standards for the prime costs of one unit of product.   During November,Arrow purchased 160,000 pounds of direct materials at a total cost of $304,000.The total factory wages for November were $42,000,90% of which were for direct labor.Arrow manufactured 19,000 units of product during November using 142,500 pounds of direct materials and 5,000 direct labor hours.What is the direct materials price variance for November?</strong> A)$14,250. B)$14,400. C)$16,000. D)$17,100. <div style=padding-top: 35px> During November,Arrow purchased 160,000 pounds of direct materials at a total cost of $304,000.The total factory wages for November were $42,000,90% of which were for direct labor.Arrow manufactured 19,000 units of product during November using 142,500 pounds of direct materials and 5,000 direct labor hours.What is the direct materials price variance for November?

A)$14,250.
B)$14,400.
C)$16,000.
D)$17,100.
Question
The Redrock Company uses flexible budgeting for cost control.Redrock produced 10,800 units of product during October,incurring indirect material costs of $13,000.Its master budget for the reflected indirect material costs of $180,000 at a production volume of 144,000 units.What was the flexible budget variance for the indirect material costs in October?

A)$1,100 favorable.
B)$1,100 unfavorable.
C)$2,000 favorable.
D)$2,000 unfavorable.
E)$500 favorable.
Question
<strong>  What is the sales revenue in the flexible budget?</strong> A)$139,000. B)$156,000. C)$169,000. D)$180,000. <div style=padding-top: 35px> What is the sales revenue in the flexible budget?

A)$139,000.
B)$156,000.
C)$169,000.
D)$180,000.
Question
Arrow Industries employs a standard cost system in which direct materials inventory is carried at standard cost.Arrow has established the following standards for the prime costs of one unit of product. <strong>Arrow Industries employs a standard cost system in which direct materials inventory is carried at standard cost.Arrow has established the following standards for the prime costs of one unit of product.   During November,Arrow purchased 160,000 pounds of direct materials at a total cost of $304,000.The total factory wages for November were $42,000,90% of which were for direct labor.Arrow manufactured 19,000 units of product during November using 142,500 pounds of direct materials and 5,000 direct labor hours.What is the direct labor price (rate)variance for November?</strong> A)$1,800. B)$1,900. C)$2,000. D)$2,090. E)$2,200. <div style=padding-top: 35px> During November,Arrow purchased 160,000 pounds of direct materials at a total cost of $304,000.The total factory wages for November were $42,000,90% of which were for direct labor.Arrow manufactured 19,000 units of product during November using 142,500 pounds of direct materials and 5,000 direct labor hours.What is the direct labor price (rate)variance for November?

A)$1,800.
B)$1,900.
C)$2,000.
D)$2,090.
E)$2,200.
Question
In general,the direct labor efficiency variance is the responsibility of the:

A)purchasing agent.
B)company president.
C)production manager.
D)industrial engineering.
Question
Which of the following is the most probable reason a company would experience an unfavorable labor rate variance and a favorable labor efficiency variance?

A)The mix of workers assigned to the particular job was heavily weighted towards the use of higher paid experienced individuals.
B)The mix of workers assigned to the particular job was heavily weighted towards the use of new relatively low paid unskilled workers.
C)Because of the production schedule,workers from other production areas were assigned to assist this particular process.
D)Defective materials caused more labor to be used in order to produce a standard unit.
Question
<strong>  What is the master budget sales revenue?</strong> A)$124,000. B)$148,000. C)$156,000. D)$180,000. <div style=padding-top: 35px> What is the master budget sales revenue?

A)$124,000.
B)$148,000.
C)$156,000.
D)$180,000.
Question
<strong>  What is the activity variance for the variable manufacturing costs?</strong> A)$4,000. B)$14,000. C)$24,000. D)$34,000. <div style=padding-top: 35px> What is the activity variance for the variable manufacturing costs?

A)$4,000.
B)$14,000.
C)$24,000.
D)$34,000.
Question
Which of these variances is least significant for cost control?

A)Labor price variance.
B)Material quantity variance.
C)Fixed overhead price variance.
D)Production volume variance.
Question
<strong>  What is the production volume variance for May?</strong> A)$2,000. B)$3,000. C)$6,000. D)$8,000. E)$9,000. <div style=padding-top: 35px> What is the production volume variance for May?

A)$2,000.
B)$3,000.
C)$6,000.
D)$8,000.
E)$9,000.
Question
In analyzing company operations,the controller of the Jason Corporation found a $250,000 favorable flexible budget revenue variance.The variance was calculated by comparing the actual results with the flexible budget.This variance can be wholly explained by: (CMA adapted)

A)the total flexible budget variance.
B)the total static budget variance.
C)changes in unit selling prices.
D)changes in the number of units solD.Since the flexible budget is based on actual output,the variation could only come from the selling price.
Question
A standard cost system may be used in: (CPA adapted)

A)job-order costing but not process costing.
B)either joB.order costing or process costing.
C)process costing but not job-order costing.
D)neither process costing nor job-order costing.
Question
<strong>  What is the fixed overhead spending (budget)variance for May?</strong> A)$1,000 unfavorable. B)$3,000 unfavorable. C)$2,000 unfavorable. D)$2,000 favorable. <div style=padding-top: 35px> What is the fixed overhead spending (budget)variance for May?

A)$1,000 unfavorable.
B)$3,000 unfavorable.
C)$2,000 unfavorable.
D)$2,000 favorable.
Question
<strong>  What is the production volume variance?</strong> A)$200. B)$400. C)$300. D)$240. <div style=padding-top: 35px> What is the production volume variance?

A)$200.
B)$400.
C)$300.
D)$240.
Question
Information for Nighttime Company's direct labor cost for February is as follows: <strong>Information for Nighttime Company's direct labor cost for February is as follows:   What were the standard direct labor hours for February?</strong> A)70,000. B)69,000. C)72,000. D)71,400. <div style=padding-top: 35px> What were the standard direct labor hours for February?

A)70,000.
B)69,000.
C)72,000.
D)71,400.
Question
Arrow Industries employs a standard cost system in which direct materials inventory is carried at standard cost.Arrow has established the following standards for the prime costs of one unit of product. <strong>Arrow Industries employs a standard cost system in which direct materials inventory is carried at standard cost.Arrow has established the following standards for the prime costs of one unit of product.   During November,Arrow purchased 160,000 pounds of direct materials at a total cost of $304,000.The total factory wages for November were $42,000,90% of which were for direct labor.Arrow manufactured 19,000 units of product during November using 142,500 pounds of direct materials and 5,000 direct labor hours.What is the direct labor efficiency variance for November?</strong> A)$1,800. B)$1,900. C)$2,000. D)$2,090. <div style=padding-top: 35px> During November,Arrow purchased 160,000 pounds of direct materials at a total cost of $304,000.The total factory wages for November were $42,000,90% of which were for direct labor.Arrow manufactured 19,000 units of product during November using 142,500 pounds of direct materials and 5,000 direct labor hours.What is the direct labor efficiency variance for November?

A)$1,800.
B)$1,900.
C)$2,000.
D)$2,090.
Question
The following information summarizes the standard cost for producing one metal tennis racket frame.In addition,the variances for one month's production are given.Assume that all inventory accounts have zero balances at the beginning of the month. <strong>The following information summarizes the standard cost for producing one metal tennis racket frame.In addition,the variances for one month's production are given.Assume that all inventory accounts have zero balances at the beginning of the month.   What was the actual quantity of materials used during the month?</strong> A)2,156. B)2,100. C)2,225. D)1,975. <div style=padding-top: 35px> What was the actual quantity of materials used during the month?

A)2,156.
B)2,100.
C)2,225.
D)1,975.
Question
The following information summarizes the standard cost for producing one metal tennis racket frame.In addition,the variances for one month's production are given.Assume that all inventory accounts have zero balances at the beginning of the month. <strong>The following information summarizes the standard cost for producing one metal tennis racket frame.In addition,the variances for one month's production are given.Assume that all inventory accounts have zero balances at the beginning of the month.   What were the actual direct labor hours worked during the month?</strong> A)5,000. B)4,800. C)4,200. D)4,000. <div style=padding-top: 35px> What were the actual direct labor hours worked during the month?

A)5,000.
B)4,800.
C)4,200.
D)4,000.
Question
<strong>  What is the fixed overhead spending (budget)variance?</strong> A)$200. B)$400. C)$300. D)$240. <div style=padding-top: 35px> What is the fixed overhead spending (budget)variance?

A)$200.
B)$400.
C)$300.
D)$240.
Question
Data on Goodman Company's direct-labor costs are given below: <strong>Data on Goodman Company's direct-labor costs are given below:   What was Goodman's standard direct-labor rate?</strong> A)$3.54. B)$3.80. C)$4.00. D)$5.80. <div style=padding-top: 35px> What was Goodman's standard direct-labor rate?

A)$3.54.
B)$3.80.
C)$4.00.
D)$5.80.
Question
When a manager is concerned with monitoring total cost,total revenue,and net profit conditioned upon the level of productivity,an accountant should normally recommend: (CPA adapted) <strong>When a manager is concerned with monitoring total cost,total revenue,and net profit conditioned upon the level of productivity,an accountant should normally recommend: (CPA adapted)  </strong> A)Option a B)Option b C)Option c D)Option d <div style=padding-top: 35px>

A)Option a
B)Option b
C)Option c
D)Option d
Question
The following information summarizes the standard cost for producing one metal tennis racket frame.In addition,the variances for one month's production are given.Assume that all inventory accounts have zero balances at the beginning of the month. <strong>The following information summarizes the standard cost for producing one metal tennis racket frame.In addition,the variances for one month's production are given.Assume that all inventory accounts have zero balances at the beginning of the month.   What was the actual price paid for the direct material during the month,assuming all materials purchased were put into production?</strong> A)$4.34. B)$4.22. C)$4.11. D)$4.00. <div style=padding-top: 35px> What was the actual price paid for the direct material during the month,assuming all materials purchased were put into production?

A)$4.34.
B)$4.22.
C)$4.11.
D)$4.00.
Question
Blue Company produces Trivets.Based on its master budget,the company should produce 1,000 Trivets each month,working 2,500 direct labor hours.During May,only 900 Trivets were produced.The company worked 2,400 direct labor hours.The standard hours allowed for May production would be:

A)2,500 hours.
B)2,400 hours.
C)2,250 hours.
D)1,800 hours.
Question
<strong>  Dickey Company had total underapplied overhead of $15,000.Additional information is as follows:   What is the actual total overhead for the period?</strong> A)$50,000. B)$45,000. C)$80,000. D)$87,000. <div style=padding-top: 35px> Dickey Company had total underapplied overhead of $15,000.Additional information is as follows: <strong>  Dickey Company had total underapplied overhead of $15,000.Additional information is as follows:   What is the actual total overhead for the period?</strong> A)$50,000. B)$45,000. C)$80,000. D)$87,000. <div style=padding-top: 35px> What is the actual total overhead for the period?

A)$50,000.
B)$45,000.
C)$80,000.
D)$87,000.
Question
Given the following information in standard costing: <strong>Given the following information in standard costing:   What is the total direct labor cost variance?</strong> A)$3,160 favorable. B)$3,160 unfavorable. C)$2,360 favorable. D)$2,360 unfavorable. <div style=padding-top: 35px> What is the total direct labor cost variance?

A)$3,160 favorable.
B)$3,160 unfavorable.
C)$2,360 favorable.
D)$2,360 unfavorable.
Question
Data on Goodman Company's direct-labor costs are given below: <strong>Data on Goodman Company's direct-labor costs are given below:   What was Goodman's actual direct-labor rate?</strong> A)$3.60. B)$3.80. C)$4.00. D)$5.80. <div style=padding-top: 35px> What was Goodman's actual direct-labor rate?

A)$3.60.
B)$3.80.
C)$4.00.
D)$5.80.
Question
The Landry Company has developed standards for labor.During June,75 units were scheduled and 100 were produced.Data related to labor are: <strong>The Landry Company has developed standards for labor.During June,75 units were scheduled and 100 were produced.Data related to labor are:   What is the labor rate variance for June?</strong> A)$30 unfavorable. B)$31 favorable. C)$31 unfavorable. D)$30 favorable. <div style=padding-top: 35px> What is the labor rate variance for June?

A)$30 unfavorable.
B)$31 favorable.
C)$31 unfavorable.
D)$30 favorable.
Question
The following data pertains to the direct materials cost for the month of October: <strong>The following data pertains to the direct materials cost for the month of October:   What is the direct materials efficiency (quantity)variance?</strong> A)$950 favorable. B)$950 unfavorable. C)$1,000 favorable. D)$1,000 unfavorable. <div style=padding-top: 35px> What is the direct materials efficiency (quantity)variance?

A)$950 favorable.
B)$950 unfavorable.
C)$1,000 favorable.
D)$1,000 unfavorable.
Question
Information on Barber Company's direct labor costs for the month of January is as follows: <strong>Information on Barber Company's direct labor costs for the month of January is as follows:   What is Barber's direct labor price (rate)variance?</strong> A)$17,250. B)$20,700. C)$18,750. D)$21,000. <div style=padding-top: 35px> What is Barber's direct labor price (rate)variance?

A)$17,250.
B)$20,700.
C)$18,750.
D)$21,000.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/90
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 16: Fundamentals of Variance Analysis
1
If the budgeted activity level is greater than the actual activity level,then the total budgeted costs of the master budget will be greater than the total budgeted costs of the flexible budget.The master budget is based on the budgeted activity level,while the flexible budget is based on the actual activity level.
True
2
Variance analysis for fixed production costs is virtually the same as for variable production costs.There are no efficiency variances for fixed production costs.
False
3
The sales price variance is the actual selling price per unit times the difference between budgeted number of units and the actual number of units sold.Sales price variance is the difference between actual and budgeted selling price times the actual number sold.
False
4
In general,and holding all other things constant,an unfavorable variance decreases operating profits.Just as a favorable variance increases profits,an unfavorable variance decreases profits.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
5
In essence,the terms "master budget" and "operating budget" mean the same thing and can be used interchangeably.The operating budget is part of the master budget,along with financial budgets.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
6
The standard cost for a unit of output is the standard price per unit of input times the standard number of inputs per one unit of output.This is the definition of standard cost.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
7
It is possible to have a favorable direct material price variance and an unfavorable direct material efficiency variance.Purchasing a lower quality material will yield a favorable price variance (since it is less costly)but may result in an unfavorable efficiency because of higher than expected waste due to poor quality.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
8
A favorable variance is not necessarily good,and an unfavorable variance is not necessarily bad.A favorable or unfavorable variance in one period may have long term impacts in the opposite direction.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
9
The difference between operating profits in the master budget and operating profits in the flexible budget is called a sales price variance.This is a sales activity variance.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
10
Variances are the difference between actual results and budgeted results.This is a definition of a variance.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
11
The production volume variance is the difference between fixed costs on the flexible budget and the fixed costs on the master budget.The production volume variance is the difference between the fixed costs on the flexible budget and the fixed overhead applied to production.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
12
Both the actual material used and the standard quantity allowed for material is based on the actual output attained.Standard quantity allowed = standard per unit × actual output.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
13
The materials price variance is computed by multiplying the difference between the actual price and the standard price by the actual quantity of materials used in production.The materials price variance is computed by multiplying the difference between the actual and standard price by the actual quantity of materials purchased.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
14
Production cost variances are input variances,while sales activity variances are output variances.Costs are based on inputs,revenues are based on outputs.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
15
The sales activity variance is the result of a difference between budgeted units sold and actual units sold.This is the definition of the sales activity variance.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
16
The flexible and master budget amounts are the same for fixed marketing and administrative costs.Fixed costs do not change with changes in activity level within the relevant range.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
17
The budget (or spending)variance for fixed production costs is the difference between the actual fixed costs and the budgeted fixed costs on the master budget.This is the definition of the budget/spending variance.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
18
The direct labor efficiency variance can be the result of poor supervision or poor scheduling by divisional managers.Poor scheduling may cause wasted time.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
19
The terms "master budget" and "flexible budget" mean the same thing and can be used interchangeably.A master budget and a static budget mean the same thing.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
20
A flexible budget adjusts the static budget to reflect the actual activity level achieved during the period.This is a basic principle of a flexible budget.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
21
Which of the following statements is (are)true regarding the sales activity variance? (A)The sales activity variance is the actual selling price per unit times the difference between the budgeted units and actual units.(B)If the sales activity variance for sales revenue is unfavorable,then the contribution margin sales activity variance will be unfavorable.

A)Only A is true.
B)Only B is true.
C)Neither A and B is true.
D)Both A and B are true.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
22
The basic difference between a master budget and a flexible budget is that a:

A)flexible budget considers only variable costs but a master budget considers all costs.
B)flexible budget allows management latitude in meeting goals whereas a master budget is based upon a fixed standard.
C)master budget is for an entire production facility but a flexible budget is applicable to single departments only.
D)master budget is based on one specific level of production and a flexible budget can be prepared for any production level within a relevant range.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
23
The most fundamental variance analysis compares:

A)standard material prices with actual material prices.
B)standard direct labor rates with actual direct labor rates.
C)budgeted sales revenue with actual sales revenue.
D)budgeted operating income with actual operating income.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
24
Which of the following statements is (are)true? (A)A favorable variance is not necessarily good,and an unfavorable variance is not necessarily bad.(B)The master budget includes operating budgets (e.g. ,production budget)and financial budgets (e.g. ,cash budget).

A)Only A is true.
B)Only B is true.
C)Both A and B are true.
D)Neither A nor B is true.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
25
When using a flexible budget,what will happen to variable costs on a per-unit basis as production increases within the relevant range?

A)Decrease.
B)Increase.
C)Remain unchanged.
D)Fixed costs are not considered in flexible budgeting.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
26
The sales price variance is the difference between the actual sales revenues and the:

A)budgeted selling price multiplied by the budgeted number of units sold.
B)budgeted selling price multiplied by the actual number of units sold.
C)actual selling price multiplied by the budgeted number of units sold.
D)actual selling price multiplied by the actual number of units solD.The sales price variance is derived from the difference between the actual revenue and budgeted selling price multiplied by the actual number of units solD.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
27
The purpose of the flexible budget is to:

A)allow management some latitude in meeting goals.
B)eliminate cyclical fluctuations in production reports by ignoring variable costs.
C)compare actual and budgeted results at virtually any level of production.
D)reduce the total time in preparing the annual budget.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
28
The difference between operating profits in the master budget and operating profits in the flexible budget is called:

A)sales activity variance.
B)flexible budget variance.
C)production volume variance.
D)total operating profit variance.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
29
The slope of the flexible budget-line is the:

A)selling price per unit.
B)variable cost per unit.
C)fixed cost per unit.
D)contribution margin per unit.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
30
Which of the following statements regarding variances is (are)false? (A)In general and holding all other things constant,an unfavorable variance decreases operating profits.(B)A favorable variance is not always good,and an unfavorable variance is not always bad.

A)Only A is false.
B)Only B is false.
C)Both A and B are false.
D)Neither A nor B is false.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
31
Which department is customarily held responsible for an unfavorable materials quantity variance?

A)Quality control.
B)Purchasing.
C)Engineering.
D)Production.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
32
When are the following direct materials variances ideally reported? <strong>When are the following direct materials variances ideally reported?  </strong> A)Option a B)Option b C)Option c D)Option d

A)Option a
B)Option b
C)Option c
D)Option d
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
33
A variance can best be described as:

A)benchmarks common to other firms in the same industry.
B)differences between planned results and actual results.
C)useful for performance evaluations but not making decisions.
D)generally accepted accounting principles when standards are useD.Variances are internal to a company and are useful for decision making as well as performance evaluation.The statement is a basic explanation of a variance.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
34
If the total materials variance for a given operation is favorable,why must this variance be further evaluated as to price and usage?

A)There is no need to further evaluate the total materials variance if it is favorable.
B)Generally accepted accounting principles require that all variances be analyzed in three stages.
C)All variances must appear in the annual report to equity owners for proper disclosure.
D)A further evaluation lets management evaluate the activities of the purchasing and production functions.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
35
The intercept of the flexible budget-line is total:

A)sales.
B)variable costs.
C)fixed costs.
D)contribution margin.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
36
In general,the terms favorable and unfavorable are used to describe the effect of a variance on:

A)net income.
B)sales revenue.
C)production costs.
D)operating expenses.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
37
In the general model,a price variance is calculated as:

A)(AP × AQ)- (AP × SQ)
B)(AP × SQ)- (SP × SQ)
C)(AP × AQ)- (SP × AQ)
D)(AP × AQ)- (SP × SQ)
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
38
Which of the following variances will always be favorable when actual sales exceeds budgeted sales?

A)Variable cost.
B)Fixed cost.
C)Sales activity.
D)Operating profit.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
39
An operating budget would not include a:

A)cash budget.
B)sales budget.
C)labor budget.
D)production budget.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
40
In the general model,an efficiency variance is calculated as:

A)(SP × AQ)- (SP × SQ)
B)(AP × SQ)- (SP × SQ)
C)(AP × AQ)- (SP × SQ)
D)(AP × AQ)- (SP × AQ)
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
41
<strong>  What is the flexible budget contribution margin?</strong> A)$39,000. B)$45,000. C)$52,000. D)$58,000. What is the flexible budget contribution margin?

A)$39,000.
B)$45,000.
C)$52,000.
D)$58,000.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
42
Which variance will be unfavorable due to employees working more hours than allowed for the actual number of units produced?

A)Price (rate).
B)Efficiency.
C)Sales activity.
D)Production volume.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
43
The production volume variance is computed by the difference between the:

A)actual fixed overhead and applied fixed overhead.
B)actual fixed overhead and budget at actual level of activity reached.
C)actual fixed overhead and budget at denominator level of activity planned.
D)budget at actual levels of activity reached and fixed overhead applieD.Production volume = budget - applieD.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
44
Which of the following direct labor variances uses the standard hours allowed for the actual number of units produced? <strong>Which of the following direct labor variances uses the standard hours allowed for the actual number of units produced?  </strong> A)Option a B)Option b C)Option c D)Option d

A)Option a
B)Option b
C)Option c
D)Option d
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
45
<strong>  What is the actual sales revenue?</strong> A)$156,000. B)$169,000. C)$180,000. D)$191,000. What is the actual sales revenue?

A)$156,000.
B)$169,000.
C)$180,000.
D)$191,000.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
46
Which of the following is not an alternative name for the production volume variance?

A)Capacity variance.
B)Idle capacity variance.
C)Denominator variance.
D)Fixed overhead efficiency variance.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
47
Arrow Industries employs a standard cost system in which direct materials inventory is carried at standard cost.Arrow has established the following standards for the prime costs of one unit of product. <strong>Arrow Industries employs a standard cost system in which direct materials inventory is carried at standard cost.Arrow has established the following standards for the prime costs of one unit of product.   During November,Arrow purchased 160,000 pounds of direct materials at a total cost of $304,000.The total factory wages for November were $42,000,90% of which were for direct labor.Arrow manufactured 19,000 units of product during November using 142,500 pounds of direct materials and 5,000 direct labor hours.What is the direct materials efficiency (quantity)variance for November?</strong> A)$14,250. B)$14,400. C)$16,000. D)$17,100. During November,Arrow purchased 160,000 pounds of direct materials at a total cost of $304,000.The total factory wages for November were $42,000,90% of which were for direct labor.Arrow manufactured 19,000 units of product during November using 142,500 pounds of direct materials and 5,000 direct labor hours.What is the direct materials efficiency (quantity)variance for November?

A)$14,250.
B)$14,400.
C)$16,000.
D)$17,100.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
48
<strong>  What is the master budget contribution margin?</strong> A)$52,000. B)$47,500. C)$45,000. D)$39,000. What is the master budget contribution margin?

A)$52,000.
B)$47,500.
C)$45,000.
D)$39,000.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
49
The production volume variance must be computed when a company uses:

A)activity-based costing.
B)process costing.
C)job-order costing.
D)full-absorption costing.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
50
A debit balance in the labor-efficiency variance account indicates that:

A)standard hours exceed actual hours.
B)actual hours exceed standard hours.
C)standard rate and standard hours exceed actual rate and actual hours.
D)actual rate and actual hours exceed standard rate and standard hours.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
51
The variable overhead price variance is due to:

A)price items only.
B)efficiency items only.
C)both price and efficiency items.
D)neither price or efficiency items.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
52
Arrow Industries employs a standard cost system in which direct materials inventory is carried at standard cost.Arrow has established the following standards for the prime costs of one unit of product. <strong>Arrow Industries employs a standard cost system in which direct materials inventory is carried at standard cost.Arrow has established the following standards for the prime costs of one unit of product.   During November,Arrow purchased 160,000 pounds of direct materials at a total cost of $304,000.The total factory wages for November were $42,000,90% of which were for direct labor.Arrow manufactured 19,000 units of product during November using 142,500 pounds of direct materials and 5,000 direct labor hours.What is the direct materials price variance for November?</strong> A)$14,250. B)$14,400. C)$16,000. D)$17,100. During November,Arrow purchased 160,000 pounds of direct materials at a total cost of $304,000.The total factory wages for November were $42,000,90% of which were for direct labor.Arrow manufactured 19,000 units of product during November using 142,500 pounds of direct materials and 5,000 direct labor hours.What is the direct materials price variance for November?

A)$14,250.
B)$14,400.
C)$16,000.
D)$17,100.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
53
The Redrock Company uses flexible budgeting for cost control.Redrock produced 10,800 units of product during October,incurring indirect material costs of $13,000.Its master budget for the reflected indirect material costs of $180,000 at a production volume of 144,000 units.What was the flexible budget variance for the indirect material costs in October?

A)$1,100 favorable.
B)$1,100 unfavorable.
C)$2,000 favorable.
D)$2,000 unfavorable.
E)$500 favorable.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
54
<strong>  What is the sales revenue in the flexible budget?</strong> A)$139,000. B)$156,000. C)$169,000. D)$180,000. What is the sales revenue in the flexible budget?

A)$139,000.
B)$156,000.
C)$169,000.
D)$180,000.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
55
Arrow Industries employs a standard cost system in which direct materials inventory is carried at standard cost.Arrow has established the following standards for the prime costs of one unit of product. <strong>Arrow Industries employs a standard cost system in which direct materials inventory is carried at standard cost.Arrow has established the following standards for the prime costs of one unit of product.   During November,Arrow purchased 160,000 pounds of direct materials at a total cost of $304,000.The total factory wages for November were $42,000,90% of which were for direct labor.Arrow manufactured 19,000 units of product during November using 142,500 pounds of direct materials and 5,000 direct labor hours.What is the direct labor price (rate)variance for November?</strong> A)$1,800. B)$1,900. C)$2,000. D)$2,090. E)$2,200. During November,Arrow purchased 160,000 pounds of direct materials at a total cost of $304,000.The total factory wages for November were $42,000,90% of which were for direct labor.Arrow manufactured 19,000 units of product during November using 142,500 pounds of direct materials and 5,000 direct labor hours.What is the direct labor price (rate)variance for November?

A)$1,800.
B)$1,900.
C)$2,000.
D)$2,090.
E)$2,200.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
56
In general,the direct labor efficiency variance is the responsibility of the:

A)purchasing agent.
B)company president.
C)production manager.
D)industrial engineering.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
57
Which of the following is the most probable reason a company would experience an unfavorable labor rate variance and a favorable labor efficiency variance?

A)The mix of workers assigned to the particular job was heavily weighted towards the use of higher paid experienced individuals.
B)The mix of workers assigned to the particular job was heavily weighted towards the use of new relatively low paid unskilled workers.
C)Because of the production schedule,workers from other production areas were assigned to assist this particular process.
D)Defective materials caused more labor to be used in order to produce a standard unit.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
58
<strong>  What is the master budget sales revenue?</strong> A)$124,000. B)$148,000. C)$156,000. D)$180,000. What is the master budget sales revenue?

A)$124,000.
B)$148,000.
C)$156,000.
D)$180,000.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
59
<strong>  What is the activity variance for the variable manufacturing costs?</strong> A)$4,000. B)$14,000. C)$24,000. D)$34,000. What is the activity variance for the variable manufacturing costs?

A)$4,000.
B)$14,000.
C)$24,000.
D)$34,000.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
60
Which of these variances is least significant for cost control?

A)Labor price variance.
B)Material quantity variance.
C)Fixed overhead price variance.
D)Production volume variance.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
61
<strong>  What is the production volume variance for May?</strong> A)$2,000. B)$3,000. C)$6,000. D)$8,000. E)$9,000. What is the production volume variance for May?

A)$2,000.
B)$3,000.
C)$6,000.
D)$8,000.
E)$9,000.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
62
In analyzing company operations,the controller of the Jason Corporation found a $250,000 favorable flexible budget revenue variance.The variance was calculated by comparing the actual results with the flexible budget.This variance can be wholly explained by: (CMA adapted)

A)the total flexible budget variance.
B)the total static budget variance.
C)changes in unit selling prices.
D)changes in the number of units solD.Since the flexible budget is based on actual output,the variation could only come from the selling price.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
63
A standard cost system may be used in: (CPA adapted)

A)job-order costing but not process costing.
B)either joB.order costing or process costing.
C)process costing but not job-order costing.
D)neither process costing nor job-order costing.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
64
<strong>  What is the fixed overhead spending (budget)variance for May?</strong> A)$1,000 unfavorable. B)$3,000 unfavorable. C)$2,000 unfavorable. D)$2,000 favorable. What is the fixed overhead spending (budget)variance for May?

A)$1,000 unfavorable.
B)$3,000 unfavorable.
C)$2,000 unfavorable.
D)$2,000 favorable.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
65
<strong>  What is the production volume variance?</strong> A)$200. B)$400. C)$300. D)$240. What is the production volume variance?

A)$200.
B)$400.
C)$300.
D)$240.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
66
Information for Nighttime Company's direct labor cost for February is as follows: <strong>Information for Nighttime Company's direct labor cost for February is as follows:   What were the standard direct labor hours for February?</strong> A)70,000. B)69,000. C)72,000. D)71,400. What were the standard direct labor hours for February?

A)70,000.
B)69,000.
C)72,000.
D)71,400.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
67
Arrow Industries employs a standard cost system in which direct materials inventory is carried at standard cost.Arrow has established the following standards for the prime costs of one unit of product. <strong>Arrow Industries employs a standard cost system in which direct materials inventory is carried at standard cost.Arrow has established the following standards for the prime costs of one unit of product.   During November,Arrow purchased 160,000 pounds of direct materials at a total cost of $304,000.The total factory wages for November were $42,000,90% of which were for direct labor.Arrow manufactured 19,000 units of product during November using 142,500 pounds of direct materials and 5,000 direct labor hours.What is the direct labor efficiency variance for November?</strong> A)$1,800. B)$1,900. C)$2,000. D)$2,090. During November,Arrow purchased 160,000 pounds of direct materials at a total cost of $304,000.The total factory wages for November were $42,000,90% of which were for direct labor.Arrow manufactured 19,000 units of product during November using 142,500 pounds of direct materials and 5,000 direct labor hours.What is the direct labor efficiency variance for November?

A)$1,800.
B)$1,900.
C)$2,000.
D)$2,090.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
68
The following information summarizes the standard cost for producing one metal tennis racket frame.In addition,the variances for one month's production are given.Assume that all inventory accounts have zero balances at the beginning of the month. <strong>The following information summarizes the standard cost for producing one metal tennis racket frame.In addition,the variances for one month's production are given.Assume that all inventory accounts have zero balances at the beginning of the month.   What was the actual quantity of materials used during the month?</strong> A)2,156. B)2,100. C)2,225. D)1,975. What was the actual quantity of materials used during the month?

A)2,156.
B)2,100.
C)2,225.
D)1,975.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
69
The following information summarizes the standard cost for producing one metal tennis racket frame.In addition,the variances for one month's production are given.Assume that all inventory accounts have zero balances at the beginning of the month. <strong>The following information summarizes the standard cost for producing one metal tennis racket frame.In addition,the variances for one month's production are given.Assume that all inventory accounts have zero balances at the beginning of the month.   What were the actual direct labor hours worked during the month?</strong> A)5,000. B)4,800. C)4,200. D)4,000. What were the actual direct labor hours worked during the month?

A)5,000.
B)4,800.
C)4,200.
D)4,000.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
70
<strong>  What is the fixed overhead spending (budget)variance?</strong> A)$200. B)$400. C)$300. D)$240. What is the fixed overhead spending (budget)variance?

A)$200.
B)$400.
C)$300.
D)$240.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
71
Data on Goodman Company's direct-labor costs are given below: <strong>Data on Goodman Company's direct-labor costs are given below:   What was Goodman's standard direct-labor rate?</strong> A)$3.54. B)$3.80. C)$4.00. D)$5.80. What was Goodman's standard direct-labor rate?

A)$3.54.
B)$3.80.
C)$4.00.
D)$5.80.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
72
When a manager is concerned with monitoring total cost,total revenue,and net profit conditioned upon the level of productivity,an accountant should normally recommend: (CPA adapted) <strong>When a manager is concerned with monitoring total cost,total revenue,and net profit conditioned upon the level of productivity,an accountant should normally recommend: (CPA adapted)  </strong> A)Option a B)Option b C)Option c D)Option d

A)Option a
B)Option b
C)Option c
D)Option d
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
73
The following information summarizes the standard cost for producing one metal tennis racket frame.In addition,the variances for one month's production are given.Assume that all inventory accounts have zero balances at the beginning of the month. <strong>The following information summarizes the standard cost for producing one metal tennis racket frame.In addition,the variances for one month's production are given.Assume that all inventory accounts have zero balances at the beginning of the month.   What was the actual price paid for the direct material during the month,assuming all materials purchased were put into production?</strong> A)$4.34. B)$4.22. C)$4.11. D)$4.00. What was the actual price paid for the direct material during the month,assuming all materials purchased were put into production?

A)$4.34.
B)$4.22.
C)$4.11.
D)$4.00.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
74
Blue Company produces Trivets.Based on its master budget,the company should produce 1,000 Trivets each month,working 2,500 direct labor hours.During May,only 900 Trivets were produced.The company worked 2,400 direct labor hours.The standard hours allowed for May production would be:

A)2,500 hours.
B)2,400 hours.
C)2,250 hours.
D)1,800 hours.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
75
<strong>  Dickey Company had total underapplied overhead of $15,000.Additional information is as follows:   What is the actual total overhead for the period?</strong> A)$50,000. B)$45,000. C)$80,000. D)$87,000. Dickey Company had total underapplied overhead of $15,000.Additional information is as follows: <strong>  Dickey Company had total underapplied overhead of $15,000.Additional information is as follows:   What is the actual total overhead for the period?</strong> A)$50,000. B)$45,000. C)$80,000. D)$87,000. What is the actual total overhead for the period?

A)$50,000.
B)$45,000.
C)$80,000.
D)$87,000.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
76
Given the following information in standard costing: <strong>Given the following information in standard costing:   What is the total direct labor cost variance?</strong> A)$3,160 favorable. B)$3,160 unfavorable. C)$2,360 favorable. D)$2,360 unfavorable. What is the total direct labor cost variance?

A)$3,160 favorable.
B)$3,160 unfavorable.
C)$2,360 favorable.
D)$2,360 unfavorable.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
77
Data on Goodman Company's direct-labor costs are given below: <strong>Data on Goodman Company's direct-labor costs are given below:   What was Goodman's actual direct-labor rate?</strong> A)$3.60. B)$3.80. C)$4.00. D)$5.80. What was Goodman's actual direct-labor rate?

A)$3.60.
B)$3.80.
C)$4.00.
D)$5.80.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
78
The Landry Company has developed standards for labor.During June,75 units were scheduled and 100 were produced.Data related to labor are: <strong>The Landry Company has developed standards for labor.During June,75 units were scheduled and 100 were produced.Data related to labor are:   What is the labor rate variance for June?</strong> A)$30 unfavorable. B)$31 favorable. C)$31 unfavorable. D)$30 favorable. What is the labor rate variance for June?

A)$30 unfavorable.
B)$31 favorable.
C)$31 unfavorable.
D)$30 favorable.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
79
The following data pertains to the direct materials cost for the month of October: <strong>The following data pertains to the direct materials cost for the month of October:   What is the direct materials efficiency (quantity)variance?</strong> A)$950 favorable. B)$950 unfavorable. C)$1,000 favorable. D)$1,000 unfavorable. What is the direct materials efficiency (quantity)variance?

A)$950 favorable.
B)$950 unfavorable.
C)$1,000 favorable.
D)$1,000 unfavorable.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
80
Information on Barber Company's direct labor costs for the month of January is as follows: <strong>Information on Barber Company's direct labor costs for the month of January is as follows:   What is Barber's direct labor price (rate)variance?</strong> A)$17,250. B)$20,700. C)$18,750. D)$21,000. What is Barber's direct labor price (rate)variance?

A)$17,250.
B)$20,700.
C)$18,750.
D)$21,000.
Unlock Deck
Unlock for access to all 90 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 90 flashcards in this deck.