Deck 10: Information Systems Development

Full screen (f)
exit full mode
Question
The process of creating and maintaining information systems is called ________.

A)systems development
B)systems acquisition
C)systems design
D)systems definition
Use Space or
up arrow
down arrow
to flip the card.
Question
Systems development is easy and risk-free.
Question
Information systems can be acquired off-the-shelf with adaptation.
Question
According to Brooks' Law,which of the following is a likely consequence of adding more people to late projects?

A)It allows the managers to extend the timeline of the project.
B)Beyond a workgroup of about 20 employees,economies of scale begin to take over.
C)The work allocation per team member increases.
D)The costs of training new people can overwhelm the benefits of their contribution.
Question
Brooks' Law holds true because a larger staff requires decreased coordination.
Question
It is essential to estimate a system's cost to calculate its rate of return.
Question
According to Brooks' Law,adding more people to a late project ________.

A)requires decreased staff coordination
B)makes the project later
C)decreases the overall cost
D)increases the project's timeline
Question
Which of the following is the first phase of the systems development life cycle process?

A)business planning process
B)requirements analysis
C)system definition
D)implementation
Question
As development teams become larger,the average contribution per worker decreases.
Question
Which of the following is true of systems development?

A)It has lesser scope than computer program development.
B)It requires business knowledge and an understanding of group dynamics.
C)It has little need for human relations skills as tasks are performed by individuals and not by groups.
D)It is exclusively a technical task undertaken by programmers and hardware specialists.
Question
When compared to program development,systems development is ________.

A)less comprehensive
B)narrower in focus
C)more technical
D)broader in scope
Question
Which of the following is true with regards to bigger and longer projects?

A)the changes in requirements increases
B)the average contribution per worker increases
C)diseconomies of scale are less
D)project budgeting and scheduling becomes easy
Question
Developers in the ________ phase of the systems development life cycle use management's statement of the system needs in order to begin developing a new information system.

A)requirements analysis
B)component design
C)implementation
D)system definition
Question
What is systems development? How is it different from program development?
Question
Information systems involve people and procedures,so they can never be off-the-shelf.
Question
One of the major challenges in systems development is changing technology.
Question
Why is systems development difficult and risky?
Question
Which of the following is true of information systems?

A)They can be adapted to fit business needs.
B)They cannot be purchased as off-the-shelf software.
C)They are off-the-shelf software without adaptation.
D)They cannot be tailor made.
Question
The ________ approach is the classical process used to develop information systems.

A)extreme programming (XP)
B)object-oriented design (OOD)
C)systems development life cycle (SDLC)
D)rapid application development (RAD)
Question
Explain how diseconomies of scale can affect systems development.
Question
The description of fixes and new requirements is the input to a system maintenance phase of a systems development life cycle.
Question
Which of the following steps in the systems definition process aims to eliminate obviously nonsensible projects?

A)forming the project team
B)defining the system goals and scope
C)assessing the project feasibility
D)planning the project
Question
The third phase of the systems development life cycle is the component design phase.
Question
________ feasibility concerns whether the new information system fits within a company's customs,culture,charter,or legal requirements.

A)Schedule
B)Organisational
C)Technical
D)Cost
Question
During the requirements analysis phase of the systems development life cycle,the development team will create a(n)________ if the new system involves a new database or substantial changes to an existing database.

A)data model
B)test plan
C)archetype
D)prototype
Question
Explain the tasks performed during the system definition phase of the systems development life cycle.
Question
Who are the members of a systems project team? Explain the roles of business analysts and systems analysts.
Question
Which of the following statements is true of the composition of a development team over the different phases of the systems development life cycle?

A)During integrated testing and conversion,the team will be augmented with business users.
B)During requirements definition,the team will be heavy with testers and database designers.
C)During design and implementation,the team will be augmented with business users.
D)During conversion,the team will be heavy with database designers.
Question
The first step in defining a new information system is to ________.

A)form the project team
B)define the goals and scope of the project
C)assess the feasibility of the project
D)determine the schedule and budget for the project
Question
Business analysts integrate the work of the programmers,testers,and users.
Question
A development team's composition changes over time.
Question
Define the terms technical feasibility and organisational feasibility.
Question
What are the five phases of the systems development life cycle (SDLC)?
Question
Organisational feasibility refers to estimating the time it will take to complete a project.
Question
Which is the most important phase in the systems development process?

A)implementing the information system
B)determining the system's requirements
C)defining the goals and scope of the new information system
D)adapting systems to changes in requirements
Question
The cost feasibility of a systems development project depends on the scope of the project.
Question
During requirements definition,a development team's composition would be typically heavy with ________.

A)programmers
B)systems analysts
C)beta testers
D)business users
Question
In which of the following phases of the systems development life cycle do developers identify the particular features and functions of a new system?

A)system definition
B)requirement analysis
C)component design
D)implementation
Question
The goals and scope of a new information system are determined during the requirements analysis phase of the systems development life cycle.
Question
The primary purpose of the requirements analysis phase is to ________.

A)investigate how much similar projects have cost in the past
B)determine and document the specific features and functions of the new system
C)eliminate obviously nonsensible projects before forming a project development team
D)identify the requisite skills needed in the IT personnel assigned to the project
Question
In a ________ installation,the new system runs alongside the old one until it has been tested and is fully operational.

A)parallel
B)plunge
C)phased
D)pilot
Question
Olive Inc. ,a chain of retail outlets,is converting its existing billing systems to a more robust online tool.In this process,the organisation runs both the old and the new systems to compare their performances.In this case,the company is implementing the new system using ________ installation.

A)plunge
B)parallel
C)phased
D)pilot
Question
Which of the following personnel design the procedures for a business information system?

A)programmers
B)business analysts
C)testers
D)systems analysts
Question
The easiest and cheapest time to alter the information system is in the ________ phase of the systems development life cycle.

A)system definition
B)component design
C)requirements analysis
D)implementation
Question
Explain how the software component of an information system is designed.
Question
Which of the following personnel on a development team have the final say on whether a system is ready for use?

A)PQA personnel
B)systems analysts
C)users
D)managers
Question
The security needs of an information system are determined during the component design phase of the systems development life cycle.
Question
Normal processing procedures for operations personnel involve procedures ________.

A)for continuing operations when the system fails
B)for starting,stopping,and operating the system
C)for using the system to accomplish business tasks
D)for backing up data and other resources
Question
In a ________ installation,an organisation implements an entire system on a limited portion of the business.

A)pilot
B)phased
C)parallel
D)plunge
Question
While designing ________,a development team must produce design documentation for writing computer code.

A)cloud-based systems
B)custom-developed programs
C)off-the-shelf software
D)off-the-shelf-with-alteration software
Question
Explain the importance of the requirements analysis phase of the SDLC.
Question
________ testing is the process of allowing future system users to try out the new system on their own.

A)Integration
B)Unit
C)Beta
D)Alpha
Question
During the ________ phase of the systems development life cycle process,developers construct,install,and test the components of the information system.

A)implementation
B)database design
C)feasibility assessment
D)requirements analysis
Question
Which of the following is a typical concern for developers while using prototypes?

A)assessing a system's technical feasibility
B)developing a uniform funding solution for the system
C)understanding a system's complete requirements
D)comparing a system's features with requirements
Question
Interviews are conducted with system users in the requirements analysis phase of the systems development life cycle.
Question
Mock-ups of forms and reports can generate similar benefits as a working prototype.
Question
In terms of software design for custom-developed programs,the development team identifies off-the-shelf products and then determines the alterations required.
Question
Which of the following is the most expensive style of system conversion?

A)phased installation
B)parallel installation
C)pilot installation
D)plunge installation
Question
A comprehensive test plan should ________.

A)not include the incorrect actions that users will take
B)cause every line of program code to be executed
C)cause only critical error messages to be displayed
D)be constructed by product quality assurance (PQA)personnel alone
Question
System ________ refers to the process of changing the business activity from an old information system to a new system.

A)testing
B)conversion
C)definition
D)analysis
Question
Which of the following statements is true with regard to system maintenance?

A)All commercial software products are shipped with known failures.
B)IS personnel prioritise system problems on a first-come-first-served basis.
C)Service packs are developed to fix a single problem at a time.
D)Software developers usually bundle fixes for low-priority problems into a patch.
Question
Software developers group fixes for high priority failures into a ________ that can be applied to all copies of a given product.

A)bug
B)patch
C)service pack
D)product key
Question
What are patches and service packs?
Question
Beta testing is the last phase of the testing process.
Question
Projects that spend much time ________ are sometimes said to be in analysis paralysis.

A)documenting requirements
B)designing system components
C)on project scheduling
D)in the system definition phase of the SDLC
Question
Which of the following styles of system conversion shuts off the old system and starts the new system?

A)parallel installation
B)pilot installation
C)phased installation
D)plunge installation
Question
Which of the following is a major concern for developers in a systems development life cycle process?

A)agreeing on the basic tasks to be performed to build a system
B)moving through the unstructured phases of the cycle
C)having to work with a team of specialists
D)performing repetitive tasks of a completed phase
Question
The systems development life cycle process is supposed to operate in a sequence of nonrepetitive phases.
Question
Estimates of labour hours and completion dates are accurate for large,multiyear projects.
Question
In a pilot installation,a new system is installed in phases across the organisation.
Question
What is a test plan?
Question
What are the tasks of system maintenance?
Question
Software vendors usually bundle fixes of low-priority problems into ________.

A)service packs
B)bugs
C)patches
D)product keys
Question
Plunge installation is sometimes called direct installation.
Question
What is beta testing?
Question
Testing is often called product quality assurance (PQA).
Question
Actual systems development generally works in accordance with the waterfall nature of the systems development life cycle.
Question
The maintenance phase can start another cycle of the systems development life cycle.
Question
Explain the problems caused due to the systems development life cycle's waterfall nature.
Question
What are the four ways in which organisations can implement a system conversion?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/80
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 10: Information Systems Development
1
The process of creating and maintaining information systems is called ________.

A)systems development
B)systems acquisition
C)systems design
D)systems definition
A
2
Systems development is easy and risk-free.
False
3
Information systems can be acquired off-the-shelf with adaptation.
False
4
According to Brooks' Law,which of the following is a likely consequence of adding more people to late projects?

A)It allows the managers to extend the timeline of the project.
B)Beyond a workgroup of about 20 employees,economies of scale begin to take over.
C)The work allocation per team member increases.
D)The costs of training new people can overwhelm the benefits of their contribution.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
5
Brooks' Law holds true because a larger staff requires decreased coordination.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
6
It is essential to estimate a system's cost to calculate its rate of return.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
7
According to Brooks' Law,adding more people to a late project ________.

A)requires decreased staff coordination
B)makes the project later
C)decreases the overall cost
D)increases the project's timeline
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
8
Which of the following is the first phase of the systems development life cycle process?

A)business planning process
B)requirements analysis
C)system definition
D)implementation
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
9
As development teams become larger,the average contribution per worker decreases.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
10
Which of the following is true of systems development?

A)It has lesser scope than computer program development.
B)It requires business knowledge and an understanding of group dynamics.
C)It has little need for human relations skills as tasks are performed by individuals and not by groups.
D)It is exclusively a technical task undertaken by programmers and hardware specialists.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
11
When compared to program development,systems development is ________.

A)less comprehensive
B)narrower in focus
C)more technical
D)broader in scope
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
12
Which of the following is true with regards to bigger and longer projects?

A)the changes in requirements increases
B)the average contribution per worker increases
C)diseconomies of scale are less
D)project budgeting and scheduling becomes easy
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
13
Developers in the ________ phase of the systems development life cycle use management's statement of the system needs in order to begin developing a new information system.

A)requirements analysis
B)component design
C)implementation
D)system definition
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
14
What is systems development? How is it different from program development?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
15
Information systems involve people and procedures,so they can never be off-the-shelf.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
16
One of the major challenges in systems development is changing technology.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
17
Why is systems development difficult and risky?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
18
Which of the following is true of information systems?

A)They can be adapted to fit business needs.
B)They cannot be purchased as off-the-shelf software.
C)They are off-the-shelf software without adaptation.
D)They cannot be tailor made.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
19
The ________ approach is the classical process used to develop information systems.

A)extreme programming (XP)
B)object-oriented design (OOD)
C)systems development life cycle (SDLC)
D)rapid application development (RAD)
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
20
Explain how diseconomies of scale can affect systems development.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
21
The description of fixes and new requirements is the input to a system maintenance phase of a systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
22
Which of the following steps in the systems definition process aims to eliminate obviously nonsensible projects?

A)forming the project team
B)defining the system goals and scope
C)assessing the project feasibility
D)planning the project
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
23
The third phase of the systems development life cycle is the component design phase.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
24
________ feasibility concerns whether the new information system fits within a company's customs,culture,charter,or legal requirements.

A)Schedule
B)Organisational
C)Technical
D)Cost
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
25
During the requirements analysis phase of the systems development life cycle,the development team will create a(n)________ if the new system involves a new database or substantial changes to an existing database.

A)data model
B)test plan
C)archetype
D)prototype
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
26
Explain the tasks performed during the system definition phase of the systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
27
Who are the members of a systems project team? Explain the roles of business analysts and systems analysts.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
28
Which of the following statements is true of the composition of a development team over the different phases of the systems development life cycle?

A)During integrated testing and conversion,the team will be augmented with business users.
B)During requirements definition,the team will be heavy with testers and database designers.
C)During design and implementation,the team will be augmented with business users.
D)During conversion,the team will be heavy with database designers.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
29
The first step in defining a new information system is to ________.

A)form the project team
B)define the goals and scope of the project
C)assess the feasibility of the project
D)determine the schedule and budget for the project
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
30
Business analysts integrate the work of the programmers,testers,and users.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
31
A development team's composition changes over time.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
32
Define the terms technical feasibility and organisational feasibility.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
33
What are the five phases of the systems development life cycle (SDLC)?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
34
Organisational feasibility refers to estimating the time it will take to complete a project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
35
Which is the most important phase in the systems development process?

A)implementing the information system
B)determining the system's requirements
C)defining the goals and scope of the new information system
D)adapting systems to changes in requirements
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
36
The cost feasibility of a systems development project depends on the scope of the project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
37
During requirements definition,a development team's composition would be typically heavy with ________.

A)programmers
B)systems analysts
C)beta testers
D)business users
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
38
In which of the following phases of the systems development life cycle do developers identify the particular features and functions of a new system?

A)system definition
B)requirement analysis
C)component design
D)implementation
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
39
The goals and scope of a new information system are determined during the requirements analysis phase of the systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
40
The primary purpose of the requirements analysis phase is to ________.

A)investigate how much similar projects have cost in the past
B)determine and document the specific features and functions of the new system
C)eliminate obviously nonsensible projects before forming a project development team
D)identify the requisite skills needed in the IT personnel assigned to the project
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
41
In a ________ installation,the new system runs alongside the old one until it has been tested and is fully operational.

A)parallel
B)plunge
C)phased
D)pilot
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
42
Olive Inc. ,a chain of retail outlets,is converting its existing billing systems to a more robust online tool.In this process,the organisation runs both the old and the new systems to compare their performances.In this case,the company is implementing the new system using ________ installation.

A)plunge
B)parallel
C)phased
D)pilot
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
43
Which of the following personnel design the procedures for a business information system?

A)programmers
B)business analysts
C)testers
D)systems analysts
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
44
The easiest and cheapest time to alter the information system is in the ________ phase of the systems development life cycle.

A)system definition
B)component design
C)requirements analysis
D)implementation
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
45
Explain how the software component of an information system is designed.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
46
Which of the following personnel on a development team have the final say on whether a system is ready for use?

A)PQA personnel
B)systems analysts
C)users
D)managers
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
47
The security needs of an information system are determined during the component design phase of the systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
48
Normal processing procedures for operations personnel involve procedures ________.

A)for continuing operations when the system fails
B)for starting,stopping,and operating the system
C)for using the system to accomplish business tasks
D)for backing up data and other resources
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
49
In a ________ installation,an organisation implements an entire system on a limited portion of the business.

A)pilot
B)phased
C)parallel
D)plunge
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
50
While designing ________,a development team must produce design documentation for writing computer code.

A)cloud-based systems
B)custom-developed programs
C)off-the-shelf software
D)off-the-shelf-with-alteration software
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
51
Explain the importance of the requirements analysis phase of the SDLC.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
52
________ testing is the process of allowing future system users to try out the new system on their own.

A)Integration
B)Unit
C)Beta
D)Alpha
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
53
During the ________ phase of the systems development life cycle process,developers construct,install,and test the components of the information system.

A)implementation
B)database design
C)feasibility assessment
D)requirements analysis
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
54
Which of the following is a typical concern for developers while using prototypes?

A)assessing a system's technical feasibility
B)developing a uniform funding solution for the system
C)understanding a system's complete requirements
D)comparing a system's features with requirements
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
55
Interviews are conducted with system users in the requirements analysis phase of the systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
56
Mock-ups of forms and reports can generate similar benefits as a working prototype.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
57
In terms of software design for custom-developed programs,the development team identifies off-the-shelf products and then determines the alterations required.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
58
Which of the following is the most expensive style of system conversion?

A)phased installation
B)parallel installation
C)pilot installation
D)plunge installation
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
59
A comprehensive test plan should ________.

A)not include the incorrect actions that users will take
B)cause every line of program code to be executed
C)cause only critical error messages to be displayed
D)be constructed by product quality assurance (PQA)personnel alone
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
60
System ________ refers to the process of changing the business activity from an old information system to a new system.

A)testing
B)conversion
C)definition
D)analysis
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
61
Which of the following statements is true with regard to system maintenance?

A)All commercial software products are shipped with known failures.
B)IS personnel prioritise system problems on a first-come-first-served basis.
C)Service packs are developed to fix a single problem at a time.
D)Software developers usually bundle fixes for low-priority problems into a patch.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
62
Software developers group fixes for high priority failures into a ________ that can be applied to all copies of a given product.

A)bug
B)patch
C)service pack
D)product key
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
63
What are patches and service packs?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
64
Beta testing is the last phase of the testing process.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
65
Projects that spend much time ________ are sometimes said to be in analysis paralysis.

A)documenting requirements
B)designing system components
C)on project scheduling
D)in the system definition phase of the SDLC
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
66
Which of the following styles of system conversion shuts off the old system and starts the new system?

A)parallel installation
B)pilot installation
C)phased installation
D)plunge installation
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
67
Which of the following is a major concern for developers in a systems development life cycle process?

A)agreeing on the basic tasks to be performed to build a system
B)moving through the unstructured phases of the cycle
C)having to work with a team of specialists
D)performing repetitive tasks of a completed phase
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
68
The systems development life cycle process is supposed to operate in a sequence of nonrepetitive phases.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
69
Estimates of labour hours and completion dates are accurate for large,multiyear projects.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
70
In a pilot installation,a new system is installed in phases across the organisation.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
71
What is a test plan?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
72
What are the tasks of system maintenance?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
73
Software vendors usually bundle fixes of low-priority problems into ________.

A)service packs
B)bugs
C)patches
D)product keys
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
74
Plunge installation is sometimes called direct installation.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
75
What is beta testing?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
76
Testing is often called product quality assurance (PQA).
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
77
Actual systems development generally works in accordance with the waterfall nature of the systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
78
The maintenance phase can start another cycle of the systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
79
Explain the problems caused due to the systems development life cycle's waterfall nature.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
80
What are the four ways in which organisations can implement a system conversion?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 80 flashcards in this deck.