The following sequence shows four operations for a computer chip assembly process and the effective capacity of each.Step 1: 500 chips/hour Step 2: 250 chips/hour
Step 3: 200 chips/hour
Step 4: 550 chips/hour
Suppose the utilization is 70 percent of effective capacity. What is the actual output of the process?

A)140 chips/hour
B)350 chips/hour
C)175 chips/hour
D)200 chips/hour
Use Space or
up arrow
down arrow
to flip the card.
Question
A short-term, highly focused effort for improving a process is known as a:

A)Jidoka Event.
B)Kaizen Event.
C)Chaebol Event.
D)Poka-yoke Event.
E)Enchilada Event.
Question
Process thinking causes managers to address critical process elements, including:

A)Activities.
B)Inputs and outputs.
C)Flows, structure, resources, and metrics.
D)All of these.
Question
A bottleneck activity in a process is generally the activity with:

A)The smallest number of resources devoted to it.
B)The least capacity.
C)No delays in front of it.
D)The highest cost.
Question
Suppose you learn that a process has a very long waiting time. Which of the following would decrease the waiting time?

A)Decrease utilization.
B)Increase the coefficient of variation of job arrival times.
C)Increase the coefficient of variation of job processing times.
D)None of these would decrease waiting time.
Question
Government regulations belong to which of the following elements of a process?

A)Activities
B)Inputs/outputs/feedback
C)Process structure
D)Management policies
Question
Under Juran's Law, whenever a problem occurs, what percentage of the time is the problem the result of a system/process error?

A)15 percent
B)50 percent
C)85 percent
D)100 percent
Question
One implication of increased utilization in a process is that:

A)Process cost typically will go up.
B)Waiting time typically will go up.
C)Variance typically will be reduced.
D)All of these.
Question
Most processes involve two basic types of flows:

A)Information flows and physical flows.
B)Product flows and decision flows.
C)Information flows and operator flows.
D)Physical flows and documentation flows.
Question
You walk into a hair stylist shop. All stylists are busy and you sit in the waiting area. You are in which of the following process activities?

A)Operation
B)Delay
C)Storage
D)You are not in a process activity.
Question
A manager is currently unhappy with the capabilities of a particular process and wants to improve its capabilities. To accomplish this, the manager needs to focus on the process:

A)Inputs, outputs, and flows.
B)Activities.
C)Management metrics.
D)Structure.
Question
Which of the following is NOT a basic activity type in processes?

A)Delay
B)Operation
C)Reporting
D)Storage
E)Decision
Question
Little's Law suggests that the key to increased throughput is:

A)Shorter flow times.
B)Fewer defects.
C)Eliminating waste.
D)Increased inspection.
Question
Adam Smith described his company's process as follows: "Under ideal conditions we can produce 10,000 units a day. However, our normal production is 6,000 units a day.Today, we actually produced 8,000 units." Which of the following is true?

A)Utilization is 60 percent of maximum capacity.
B)Yield is 133 percent of effective capacity.
C)Utilization was 133 percent of effective capacity.
D)All of these are true.
Question
An example of a short-term capacity decision is:

A)Adding specialized labor.
B)Installing new equipment.
C)Adding new facilities.
D)Adding low-skilled labor.
Question
Which of the following forms of capacity can only be determined AFTER the completion of activities?

A)Demonstrated capacity
B)Maximum capacity
C)Design capacity
D)Effective capacity
Question
If a company can eliminate all sources of variance in a process:

A)It will be able to operate at maximum capacity at all times.
B)There will be no constraints in the process.
C)Continuous improvement will not be necessary.
D)None of these are true.
Question
The following sequence shows four operations for a computer chip assembly process and the effective capacity of each. Which step is the bottleneck? Step 1: 500 chips/hour
Step 2: 250 chips/hour
Step 3: 200 chips/hour
Step 4: 550 chips/hour

A)Step 1
B)Step 2
C)Step 3
D)Step 4
Question
Which of the following statements about economies of scale is NOT true?

A)One reason economies of scale occur is because fixed costs can be spread over more units of production as output increases.
B)One reason economies of scale occur is because employees become more efficient as volume increases.
C)Economies of scale refers to the fact that as volume increases, total cost of production decreases.
D)Economies of scale may not exist at all levels of production.
Question
Joe Jones, plant manager at Waco Industries, told a friend that if it was necessary, his plant could produce 1,000 items a day if all conditions were just right. Joe is describing his plant's:

A)Effective capacity.
B)Yield rate.
C)Utilization.
D)Maximum capacity.
Question
Which of the following actions will NOT increase output?

A)Increasing capacity through physical additions.
B)Outsourcing.
C)Managing the flow of work into the system.
D)Changing the processes to eliminate unnecessary steps.
Question
Make/buy/subcontract is typically considered at what time horizon when doing capacity planning?

A)Short-term
B)Medium-term
C)Long-term
D)It is not part of the capacity planning process.
Question
Kaizen Events are most appropriate for which type of operations problem?

A)Customer-based
B)Metrics-based
C)Process-based
D)Product-based
Question
Which process activity is due to other factors (e.g., insufficient operating capacity, lack of material, equipment breakdowns)?

A)Delay
B)Operation
C)Storage
D)Transportation
E)Inspection
Question
You are given the following information. Which of these statements can you support with this information? <strong>You are given the following information. Which of these statements can you support with this information?  </strong> A)More capacity needs to be added in the short term to improve performance in the system. B)We have to look at the rate at which jobs are being input into the shop. C)Our workforce is not working hard enough. D)We need to further investigate whether the problem is in input or capacity. <div style=padding-top: 35px>

A)More capacity needs to be added in the short term to improve performance in the system.
B)We have to look at the rate at which jobs are being input into the shop.
C)Our workforce is not working hard enough.
D)We need to further investigate whether the problem is in input or capacity.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/25
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 3: Managing Processes and Capacity
1
The following sequence shows four operations for a computer chip assembly process and the effective capacity of each.Step 1: 500 chips/hour Step 2: 250 chips/hour
Step 3: 200 chips/hour
Step 4: 550 chips/hour
Suppose the utilization is 70 percent of effective capacity. What is the actual output of the process?

A)140 chips/hour
B)350 chips/hour
C)175 chips/hour
D)200 chips/hour
140 chips/hour
2
A short-term, highly focused effort for improving a process is known as a:

A)Jidoka Event.
B)Kaizen Event.
C)Chaebol Event.
D)Poka-yoke Event.
E)Enchilada Event.
Kaizen Event.
3
Process thinking causes managers to address critical process elements, including:

A)Activities.
B)Inputs and outputs.
C)Flows, structure, resources, and metrics.
D)All of these.
All of these.
4
A bottleneck activity in a process is generally the activity with:

A)The smallest number of resources devoted to it.
B)The least capacity.
C)No delays in front of it.
D)The highest cost.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
5
Suppose you learn that a process has a very long waiting time. Which of the following would decrease the waiting time?

A)Decrease utilization.
B)Increase the coefficient of variation of job arrival times.
C)Increase the coefficient of variation of job processing times.
D)None of these would decrease waiting time.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
6
Government regulations belong to which of the following elements of a process?

A)Activities
B)Inputs/outputs/feedback
C)Process structure
D)Management policies
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
7
Under Juran's Law, whenever a problem occurs, what percentage of the time is the problem the result of a system/process error?

A)15 percent
B)50 percent
C)85 percent
D)100 percent
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
8
One implication of increased utilization in a process is that:

A)Process cost typically will go up.
B)Waiting time typically will go up.
C)Variance typically will be reduced.
D)All of these.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
9
Most processes involve two basic types of flows:

A)Information flows and physical flows.
B)Product flows and decision flows.
C)Information flows and operator flows.
D)Physical flows and documentation flows.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
10
You walk into a hair stylist shop. All stylists are busy and you sit in the waiting area. You are in which of the following process activities?

A)Operation
B)Delay
C)Storage
D)You are not in a process activity.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
11
A manager is currently unhappy with the capabilities of a particular process and wants to improve its capabilities. To accomplish this, the manager needs to focus on the process:

A)Inputs, outputs, and flows.
B)Activities.
C)Management metrics.
D)Structure.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
12
Which of the following is NOT a basic activity type in processes?

A)Delay
B)Operation
C)Reporting
D)Storage
E)Decision
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
13
Little's Law suggests that the key to increased throughput is:

A)Shorter flow times.
B)Fewer defects.
C)Eliminating waste.
D)Increased inspection.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
14
Adam Smith described his company's process as follows: "Under ideal conditions we can produce 10,000 units a day. However, our normal production is 6,000 units a day.Today, we actually produced 8,000 units." Which of the following is true?

A)Utilization is 60 percent of maximum capacity.
B)Yield is 133 percent of effective capacity.
C)Utilization was 133 percent of effective capacity.
D)All of these are true.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
15
An example of a short-term capacity decision is:

A)Adding specialized labor.
B)Installing new equipment.
C)Adding new facilities.
D)Adding low-skilled labor.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
16
Which of the following forms of capacity can only be determined AFTER the completion of activities?

A)Demonstrated capacity
B)Maximum capacity
C)Design capacity
D)Effective capacity
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
17
If a company can eliminate all sources of variance in a process:

A)It will be able to operate at maximum capacity at all times.
B)There will be no constraints in the process.
C)Continuous improvement will not be necessary.
D)None of these are true.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
18
The following sequence shows four operations for a computer chip assembly process and the effective capacity of each. Which step is the bottleneck? Step 1: 500 chips/hour
Step 2: 250 chips/hour
Step 3: 200 chips/hour
Step 4: 550 chips/hour

A)Step 1
B)Step 2
C)Step 3
D)Step 4
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
19
Which of the following statements about economies of scale is NOT true?

A)One reason economies of scale occur is because fixed costs can be spread over more units of production as output increases.
B)One reason economies of scale occur is because employees become more efficient as volume increases.
C)Economies of scale refers to the fact that as volume increases, total cost of production decreases.
D)Economies of scale may not exist at all levels of production.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
20
Joe Jones, plant manager at Waco Industries, told a friend that if it was necessary, his plant could produce 1,000 items a day if all conditions were just right. Joe is describing his plant's:

A)Effective capacity.
B)Yield rate.
C)Utilization.
D)Maximum capacity.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
21
Which of the following actions will NOT increase output?

A)Increasing capacity through physical additions.
B)Outsourcing.
C)Managing the flow of work into the system.
D)Changing the processes to eliminate unnecessary steps.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
22
Make/buy/subcontract is typically considered at what time horizon when doing capacity planning?

A)Short-term
B)Medium-term
C)Long-term
D)It is not part of the capacity planning process.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
23
Kaizen Events are most appropriate for which type of operations problem?

A)Customer-based
B)Metrics-based
C)Process-based
D)Product-based
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
24
Which process activity is due to other factors (e.g., insufficient operating capacity, lack of material, equipment breakdowns)?

A)Delay
B)Operation
C)Storage
D)Transportation
E)Inspection
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
25
You are given the following information. Which of these statements can you support with this information? <strong>You are given the following information. Which of these statements can you support with this information?  </strong> A)More capacity needs to be added in the short term to improve performance in the system. B)We have to look at the rate at which jobs are being input into the shop. C)Our workforce is not working hard enough. D)We need to further investigate whether the problem is in input or capacity.

A)More capacity needs to be added in the short term to improve performance in the system.
B)We have to look at the rate at which jobs are being input into the shop.
C)Our workforce is not working hard enough.
D)We need to further investigate whether the problem is in input or capacity.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 25 flashcards in this deck.