Deck 10: Material Organization and Layout

Full screen (f)
exit full mode
Question
Vehicle racks do not have maximum weight loads.
Use Space or
up arrow
down arrow
to flip the card.
Question
Excavated ____________________ placement must be considered during a layout process for underground installations.
Question
MATCHING
Match the following terms:
a.Branch
b.Load-bearing
c.Stud
d.Slab
e.Framing
f.Joist
g.Procurement
h.Framer
i.Trench
Concrete floor used to define a building design that does not have a crawlspace or basement.
Question
A _______________ is a wooden platform that is raised from the floor to accommodate a fork truck or pallet-jack.
Question
Drilling and _______________ codes must be addressed during an aboveground layout process.
Question
MATCHING
Match the following terms:
a.Branch
b.Load-bearing
c.Stud
d.Slab
e.Framing
f.Joist
g.Procurement
h.Framer
i.Trench
The entire wooden structure of a building.
Question
MATCHING
Match the following terms:
a.Branch
b.Load-bearing
c.Stud
d.Slab
e.Framing
f.Joist
g.Procurement
h.Framer
i.Trench
The process of receiving material through ordering or gathering material.
Question
A _______________________ knot allows a plumber to tie string quickly and remove it without untying the knot or cutting the string.
Question
Material that is not available at the time of the material organizational process should be ignored.
Question
The MSDS lists the dangers of a hazardous material and the recommended medical treatment in case of exposure.
Question
Most residential materials are _______________ with the exception of pieces of equipment such as water heaters and certain types of bathtubs.
Question
____________________ is a trade name for organizing material by activity or specific installation.
Question
Advances in technology have done very little to improve communications in the plumbing industry.
Question
A plumber can be held responsible for structural failure caused by cutting,drilling,or notching a floor joist during installation.
Question
MATCHING
Match the following terms:
a.Branch
b.Load-bearing
c.Stud
d.Slab
e.Framing
f.Joist
g.Procurement
h.Framer
i.Trench
Vertical board used to erect a wall.
Question
Securing materials and ladders to a vehicle rack must be performed with proper techniques to prevent items from falling while driving.
Question
Fixture ____________________ requirements and fixture clearance codes must be known during the layout process.
Question
The most effective form of communication on a jobsite is written communication.
Question
A _________________________ is a written document required by the Occupational Safety and Health Administration (OSHA)upon request for every product containing dangerous or hazardous materials.
Question
A _________________________ can be created to ensure all missing material is received before an installation begins and indicates to a plumber that the order is incomplete.
Question
MATCHING
Match the following terms:
a.Branch
b.Load-bearing
c.Stud
d.Slab
e.Framing
f.Joist
g.Procurement
h.Framer
i.Trench
An individual erecting the structural wooden boards of a house.
Question
MATCHING
Match the following terms:
a.Branch
b.Load-bearing
c.Stud
d.Slab
e.Framing
f.Joist
g.Procurement
h.Framer
i.Trench
A lateral pipe connecting to a main pipe.
Question
List five methods for organizing plumbing materials.
Question
MATCHING
Match the following terms:
a.Branch
b.Load-bearing
c.Stud
d.Slab
e.Framing
f.Joist
g.Procurement
h.Framer
i.Trench
Horizontal board used for structural integrity.
Question
MATCHING
Match the following terms:
a.Branch
b.Load-bearing
c.Stud
d.Slab
e.Framing
f.Joist
g.Procurement
h.Framer
i.Trench
A portion of the structure that bears the weight of the structure.
Question
MATCHING
Match the following terms:
a.Branch
b.Load-bearing
c.Stud
d.Slab
e.Framing
f.Joist
g.Procurement
h.Framer
i.Trench
Excavated soil creating an installation area below ground,also known as a ditch.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/26
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 10: Material Organization and Layout
1
Vehicle racks do not have maximum weight loads.
False
Vehicle racks have maximum weight loads.
2
Excavated ____________________ placement must be considered during a layout process for underground installations.
soil
3
MATCHING
Match the following terms:
a.Branch
b.Load-bearing
c.Stud
d.Slab
e.Framing
f.Joist
g.Procurement
h.Framer
i.Trench
Concrete floor used to define a building design that does not have a crawlspace or basement.
D
4
A _______________ is a wooden platform that is raised from the floor to accommodate a fork truck or pallet-jack.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
5
Drilling and _______________ codes must be addressed during an aboveground layout process.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
6
MATCHING
Match the following terms:
a.Branch
b.Load-bearing
c.Stud
d.Slab
e.Framing
f.Joist
g.Procurement
h.Framer
i.Trench
The entire wooden structure of a building.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
7
MATCHING
Match the following terms:
a.Branch
b.Load-bearing
c.Stud
d.Slab
e.Framing
f.Joist
g.Procurement
h.Framer
i.Trench
The process of receiving material through ordering or gathering material.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
8
A _______________________ knot allows a plumber to tie string quickly and remove it without untying the knot or cutting the string.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
9
Material that is not available at the time of the material organizational process should be ignored.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
10
The MSDS lists the dangers of a hazardous material and the recommended medical treatment in case of exposure.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
11
Most residential materials are _______________ with the exception of pieces of equipment such as water heaters and certain types of bathtubs.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
12
____________________ is a trade name for organizing material by activity or specific installation.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
13
Advances in technology have done very little to improve communications in the plumbing industry.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
14
A plumber can be held responsible for structural failure caused by cutting,drilling,or notching a floor joist during installation.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
15
MATCHING
Match the following terms:
a.Branch
b.Load-bearing
c.Stud
d.Slab
e.Framing
f.Joist
g.Procurement
h.Framer
i.Trench
Vertical board used to erect a wall.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
16
Securing materials and ladders to a vehicle rack must be performed with proper techniques to prevent items from falling while driving.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
17
Fixture ____________________ requirements and fixture clearance codes must be known during the layout process.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
18
The most effective form of communication on a jobsite is written communication.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
19
A _________________________ is a written document required by the Occupational Safety and Health Administration (OSHA)upon request for every product containing dangerous or hazardous materials.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
20
A _________________________ can be created to ensure all missing material is received before an installation begins and indicates to a plumber that the order is incomplete.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
21
MATCHING
Match the following terms:
a.Branch
b.Load-bearing
c.Stud
d.Slab
e.Framing
f.Joist
g.Procurement
h.Framer
i.Trench
An individual erecting the structural wooden boards of a house.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
22
MATCHING
Match the following terms:
a.Branch
b.Load-bearing
c.Stud
d.Slab
e.Framing
f.Joist
g.Procurement
h.Framer
i.Trench
A lateral pipe connecting to a main pipe.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
23
List five methods for organizing plumbing materials.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
24
MATCHING
Match the following terms:
a.Branch
b.Load-bearing
c.Stud
d.Slab
e.Framing
f.Joist
g.Procurement
h.Framer
i.Trench
Horizontal board used for structural integrity.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
25
MATCHING
Match the following terms:
a.Branch
b.Load-bearing
c.Stud
d.Slab
e.Framing
f.Joist
g.Procurement
h.Framer
i.Trench
A portion of the structure that bears the weight of the structure.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
26
MATCHING
Match the following terms:
a.Branch
b.Load-bearing
c.Stud
d.Slab
e.Framing
f.Joist
g.Procurement
h.Framer
i.Trench
Excavated soil creating an installation area below ground,also known as a ditch.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 26 flashcards in this deck.