Deck 13: Progress and Performance Measurement and Evaluation

Full screen (f)
exit full mode
Question
The cost variance for a project is calculated by:

A)EV-AC
B)AC-SV
C)PV-EV
D)CU-EV
E)EU-PV
Use Space or
up arrow
down arrow
to flip the card.
Question
Which of the following are required to assess the current status of a project using the earned-value cost/schedule system?

A)BAC, EAC, and ETC
B)VAC, EAC, and BAC
C)CV, SU, and BAC
D)PV, EV, and AC
E)TCPI, EV, and PV
Question
Adequate project controls have the advantage(s) of:

A)Holding people accountable
B)Prevents small problems from getting large
C)Keeping focus
D)Both A and B are correct
E)A, B, and C are all correct
Question
he earned value of a project is the:

A)Project cost to date adjusted for project scope changes
B)Total project cost to date
C)Cost incurred minus the planned cost
D)Percent of the original budget that has been earned by actual work
E)None of these are correct
Question
The third step in the project control process of the measurement and evaluation of project performance is to:

A)Review the baseline plan with top management
B)Analyze inputs to the control system
C)Compare the plan against actual performance
D)Measure both progress and performance
E)Review spending with team members
Question
The schedule variance for a project is calculated by:

A)EV-AC
B)AC-SV
C)PV-EV
D)CU-EV
E)EV-PV
Question
A typical project progress report would contain all of the following sections except:

A)Progress since last report
B)Problems and issues since last report
C)Current status of project
D)Corrective action planned
E)All of these are typical sections
Question
A typical tool used to communicate project status is a:

A)Project network diagram
B)Gantt Chart
C)A PERT chart
D)Both A and B are correct
E)A, B, and C are all correct
Question
The method most frequently used in measuring project progress is the

A)0/100 percent rule
B)75/25 percent rule
C)50/50 percent rule
D)25/75 percent rule
E)Percent complete rule
Question
Baseline project budgets are derived from:

A)The organization's overall budget
B)Time-phasing the work packages
C)Top management directions
D)Both A and C are correct
E)A, B, and C are all correct
Question
The second step in the project control process of the measurement and evaluation of project performance is to:

A)Review the baseline plan with top management
B)Analyze inputs to control system
C)Compare plan against actual
D)Measure progress and performance
E)Review spending with team members
Question
In monitoring project time (schedule) performance actual performance should be compared to:

A)Budgets for the current year
B)Top management's targets
C)Project network schedule derived from the WBS/OBS
D)Progress on similar past projects
E)Previous status reports
Question
Which of the following methods of variance analysis is the best indicator of how far off the budget a project will be at completion?

A)BAC
B)EAC
C)ETC
D)VAC
E)TCPI
Question
A project monitoring system involves all of the following except:

A)Determining what date to collect
B)Determining how, when, and who will collect the data
C)Adjusting the data
D)Analysis of the data
E)Reporting current progress
Question
The first step in the project control process of the measurement and evaluation of project performance is to

A)Set a baseline plan
B)Determine the project objectives
C)Determine the project deliverables
D)Analyze the project budget
E)Review the project priority matrix
Question
Generally the method for measuring accomplishments centers on comparing

A)Earned value with the expected schedule value
B)Earned value with the actual costs
C)Actual costs with budgeted costs
D)Both A and B are correct
E)A, B, and C are all correct
Question
n Earned Value System used to monitor project progress includes comparison of

A)Actual costs versus budget
B)Schedule progress versus plan
C)Quality progress versus plan
D)Both A and B are correct
E)A, B, and C are all correct
Question
The last step in the project control process of the measurement and evaluation of project performance is to:

A)Take appropriate action
B)Prepare a report to top management
C)Follow up on corrective action
D)Measure progress and performance
E)Review spending with team members
Question
A tool used to monitor past project schedule performance, current performance, and to estimate future schedule trends is a simple line chart known as a:

A)Project schedule control chart
B)Gantt chart
C)PERT chart
D)Network diagram
E)Milestone chart
Question
Of the following costs, which are not included in baseline?

A)Materials
B)Equipment
C)Labor
D)A and C but not B
E)All of these are usually included
Question
Which of the following methods will measure the scheduling efficiency of the work accomplished to date?

A)SV/CV
B)EV/PV
C)EV/AC
D)AC/SV
E)AC/CV
Question
Small refinements that eventually build to be major changes are known as:

A)Project erosion
B)Scope creep
C)Specification adjustments
D)Specification refinements
E)Continuous improvements
Question
Control charts are frequently used to monitor progress toward ________, which mark events and as such have zero duration.
Question
Because of their easy-to-understand visual format, ________ are the most favored, used, and understandable tool used to report project status.
Question
Which of the following methods will measure the cost efficiency of the work accomplished to date?

A)SV/CV
B)EV/PV
C)EV/AC
D)AC/SV
E)AC/CV
Question
________ is simply the percent complete, times the original budget.
Question
The first step in creating a project control system for measuring and evaluating project performance is to ________.
Question
Which of the following is not true regarding scope creep?

A)It is common late in projects
B)It is frequently unnoticed until time delays or cost overruns are observed
C)It wears down team motivation and cohesiveness
D)Project suppliers resent frequent changes
E)All of these are true
Question
Which of the following will calculate the To Complete Performance Index?

A)(VAC-EV)/(PV/AC)
B)(BAC-EV)/(EV/AC)
C)(PV/AC)/(VAC-EV)
D)(EV/AC)/(BAC-EV)
E)(BAC-EV)/(BAC-AC)
Question
The ________ is a tool used to monitor past project schedule performance and current performance and to estimate future schedule trends.
Question
An index value less than one indicates that the project is

A)Under cost or behind schedule
B)Over cost or ahead of schedule
C)Under cost or ahead of schedule
D)Over cost or behind schedule
E)On cost or on schedule
Question
Which of the following will calculate the estimated cost to complete the project?

A)(VAC-EV)/(PV/AC)
B)(BAC-EV)/(EV/AC)
C)(PV/AC)/(VAC-EV)
D)(EV/AC)/(BAC-EV)
E)(BAC-EV)/(BAC-AC)
Question
________ holds people accountable, prevents small problems from mushrooming into large problems, and keeps focus.
Question
Usually status reports should take place every ________ weeks to be useful and allow for proactive correction.
Question
The ________ is the difference between the earned value to date and the baseline schedule.
Question
A concept of ________ is necessary to get a realistic estimate of performance against a time-phased budget.
Question
The percent complete index that looks at percent complete in terms of actual amounts is calculated by which of the following?

A)EV/BAC
B)(EV-PV)/BAC
C)AC/EAC
D)(EV-AC)/BAC
E)(EV-PV)/EAC
Question
Scope creep affects:

A)The organization
B)The project team
C)The project suppliers
D)Both A and B are correct
E)A, B, and C are all correct
Question
The percent complete index that looks at percent complete in terms of budgeted amounts is calculated by which of the following?

A)EV/BAC
B)(EV-PV)/BAC
C)AC/EAC
D)(EV-AC)/BAC
E)(EV-PV)/EAC
Question
The ________ is the difference between the earned value and the actual costs for the work completed to date.
Question
The network chart is the most favored, used, and understandable option for reporting project progress to upper management.
Question
Control is one of the most neglected areas of project management.
Question
Measuring performance against budget is simply a case of comparing actual versus budget.
Question
Earned value is defined as the budgeted cost of the work performed.
Question
The best method for assigning costs to the baseline is to establish frequent __________ over the duration of the work package.
Question
The PCIC index measures the project percent complete in relation to the resources that have actually been used so far on the project.
Question
The PCIB index measures the project percent complete in relation to the resources that were budgeted.
Question
An SPI index of 1.22 indicates that the project is ________ schedule.
Question
The ________ is the rule most frequently used by practicing project managers to both assign costs to the baseline and to measure progress using earned value.
Question
CPI and SPI are two types of indexes that measure ________.
Question
The ________ indexes compare the to-date progress to the end of the project.
Question
Although it is very difficult to measure, measuring ________ performance is as important as measuring schedule and cost performance.
Question
The units of measure for SV or CV is in terms of ________.
Question
A positive variance in SV or CV indicates a ________ condition.
Question
Milestones are significant project events that mark major accomplishments.
Question
The baseline is derived from merging information from the work packages with the project network.
Question
In a project control chart, four observations trending in one direction indicate there is a very high probability that there is an identifiable cause.
Question
When measuring percent complete in the monitoring phase of the project, it is common to limit the amount earned to __________ until the work package is 100 percent complete.
Question
The best defense against scope creep is a __________.
Question
Cost variance tells us if the ________ costs are more or less than was planned at any point over the life of the project.
Question
What is the difference between a baseline Gantt chart and a Tracking Gantt chart?
Question
All scope changes that result in increased costs should be avoided.
Question
The best method for assigning costs to the baseline under this rule is to establish frequent checkpoints over the duration of the work package and assign completion percentages in dollar terms.
Question
Overhead costs and profit are typically included in the project baseline.
Question
An undesirable schedule variance indicates that the project is running behind schedule.
Question
The rule of using subjective estimated percent complete in combination with hard, tangible monitoring points works well on long-duration activities that can be broken into short discrete work packages.
Question
Baseline costs typically include labor, equipment, materials and direct overhead cost.
Question
Earned value is calculated by taking the percent complete times the original budget.
Question
The key to managing scope creep is change management.
Question
The best defense against scope creep is accepting only major changes.
Question
In calculating schedule variance and cost variance, a negative variance indicates a desirable condition, and a positive variance suggests problems.
Question
Cost variance tells us the different estimates among vendors needed to complete the project over the life of the project.
Question
One method of estimating the costs to complete a project is to divide the work remaining by the CPI.
Question
A CPI index of 0.97 indicates that the project has spent less money than budgeted.
Question
The major reasons for creating a baseline are to monitor and report progress and to estimate cash flow.
Question
Conducting an earned value analysis requires three data elements.Identify the acronyms for each and describe what they are.
Question
Identify and briefly describe the three percent complete rules for placing costs in baselines.
Question
The original earned value cost/schedule system was pioneered by the U.S.Department of Defense in the 1960s.
Question
Identify the steps in creating a control process that measure and evaluate project performance.
Question
Scope Creep refers to any significant changes made in the project once it is underway.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/88
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 13: Progress and Performance Measurement and Evaluation
1
The cost variance for a project is calculated by:

A)EV-AC
B)AC-SV
C)PV-EV
D)CU-EV
E)EU-PV
A
2
Which of the following are required to assess the current status of a project using the earned-value cost/schedule system?

A)BAC, EAC, and ETC
B)VAC, EAC, and BAC
C)CV, SU, and BAC
D)PV, EV, and AC
E)TCPI, EV, and PV
D
Explanation: Assessing the current status of a project using the earned value cost/schedule system requires three data elements-planned cost of the work scheduled (PV), budgeted cost of the work completed (EV), and actual cost of the work completed (AC).
3
Adequate project controls have the advantage(s) of:

A)Holding people accountable
B)Prevents small problems from getting large
C)Keeping focus
D)Both A and B are correct
E)A, B, and C are all correct
E
4
he earned value of a project is the:

A)Project cost to date adjusted for project scope changes
B)Total project cost to date
C)Cost incurred minus the planned cost
D)Percent of the original budget that has been earned by actual work
E)None of these are correct
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
5
The third step in the project control process of the measurement and evaluation of project performance is to:

A)Review the baseline plan with top management
B)Analyze inputs to the control system
C)Compare the plan against actual performance
D)Measure both progress and performance
E)Review spending with team members
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
6
The schedule variance for a project is calculated by:

A)EV-AC
B)AC-SV
C)PV-EV
D)CU-EV
E)EV-PV
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
7
A typical project progress report would contain all of the following sections except:

A)Progress since last report
B)Problems and issues since last report
C)Current status of project
D)Corrective action planned
E)All of these are typical sections
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
8
A typical tool used to communicate project status is a:

A)Project network diagram
B)Gantt Chart
C)A PERT chart
D)Both A and B are correct
E)A, B, and C are all correct
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
9
The method most frequently used in measuring project progress is the

A)0/100 percent rule
B)75/25 percent rule
C)50/50 percent rule
D)25/75 percent rule
E)Percent complete rule
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
10
Baseline project budgets are derived from:

A)The organization's overall budget
B)Time-phasing the work packages
C)Top management directions
D)Both A and C are correct
E)A, B, and C are all correct
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
11
The second step in the project control process of the measurement and evaluation of project performance is to:

A)Review the baseline plan with top management
B)Analyze inputs to control system
C)Compare plan against actual
D)Measure progress and performance
E)Review spending with team members
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
12
In monitoring project time (schedule) performance actual performance should be compared to:

A)Budgets for the current year
B)Top management's targets
C)Project network schedule derived from the WBS/OBS
D)Progress on similar past projects
E)Previous status reports
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
13
Which of the following methods of variance analysis is the best indicator of how far off the budget a project will be at completion?

A)BAC
B)EAC
C)ETC
D)VAC
E)TCPI
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
14
A project monitoring system involves all of the following except:

A)Determining what date to collect
B)Determining how, when, and who will collect the data
C)Adjusting the data
D)Analysis of the data
E)Reporting current progress
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
15
The first step in the project control process of the measurement and evaluation of project performance is to

A)Set a baseline plan
B)Determine the project objectives
C)Determine the project deliverables
D)Analyze the project budget
E)Review the project priority matrix
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
16
Generally the method for measuring accomplishments centers on comparing

A)Earned value with the expected schedule value
B)Earned value with the actual costs
C)Actual costs with budgeted costs
D)Both A and B are correct
E)A, B, and C are all correct
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
17
n Earned Value System used to monitor project progress includes comparison of

A)Actual costs versus budget
B)Schedule progress versus plan
C)Quality progress versus plan
D)Both A and B are correct
E)A, B, and C are all correct
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
18
The last step in the project control process of the measurement and evaluation of project performance is to:

A)Take appropriate action
B)Prepare a report to top management
C)Follow up on corrective action
D)Measure progress and performance
E)Review spending with team members
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
19
A tool used to monitor past project schedule performance, current performance, and to estimate future schedule trends is a simple line chart known as a:

A)Project schedule control chart
B)Gantt chart
C)PERT chart
D)Network diagram
E)Milestone chart
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
20
Of the following costs, which are not included in baseline?

A)Materials
B)Equipment
C)Labor
D)A and C but not B
E)All of these are usually included
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
21
Which of the following methods will measure the scheduling efficiency of the work accomplished to date?

A)SV/CV
B)EV/PV
C)EV/AC
D)AC/SV
E)AC/CV
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
22
Small refinements that eventually build to be major changes are known as:

A)Project erosion
B)Scope creep
C)Specification adjustments
D)Specification refinements
E)Continuous improvements
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
23
Control charts are frequently used to monitor progress toward ________, which mark events and as such have zero duration.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
24
Because of their easy-to-understand visual format, ________ are the most favored, used, and understandable tool used to report project status.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following methods will measure the cost efficiency of the work accomplished to date?

A)SV/CV
B)EV/PV
C)EV/AC
D)AC/SV
E)AC/CV
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
26
________ is simply the percent complete, times the original budget.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
27
The first step in creating a project control system for measuring and evaluating project performance is to ________.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
28
Which of the following is not true regarding scope creep?

A)It is common late in projects
B)It is frequently unnoticed until time delays or cost overruns are observed
C)It wears down team motivation and cohesiveness
D)Project suppliers resent frequent changes
E)All of these are true
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
29
Which of the following will calculate the To Complete Performance Index?

A)(VAC-EV)/(PV/AC)
B)(BAC-EV)/(EV/AC)
C)(PV/AC)/(VAC-EV)
D)(EV/AC)/(BAC-EV)
E)(BAC-EV)/(BAC-AC)
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
30
The ________ is a tool used to monitor past project schedule performance and current performance and to estimate future schedule trends.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
31
An index value less than one indicates that the project is

A)Under cost or behind schedule
B)Over cost or ahead of schedule
C)Under cost or ahead of schedule
D)Over cost or behind schedule
E)On cost or on schedule
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
32
Which of the following will calculate the estimated cost to complete the project?

A)(VAC-EV)/(PV/AC)
B)(BAC-EV)/(EV/AC)
C)(PV/AC)/(VAC-EV)
D)(EV/AC)/(BAC-EV)
E)(BAC-EV)/(BAC-AC)
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
33
________ holds people accountable, prevents small problems from mushrooming into large problems, and keeps focus.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
34
Usually status reports should take place every ________ weeks to be useful and allow for proactive correction.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
35
The ________ is the difference between the earned value to date and the baseline schedule.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
36
A concept of ________ is necessary to get a realistic estimate of performance against a time-phased budget.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
37
The percent complete index that looks at percent complete in terms of actual amounts is calculated by which of the following?

A)EV/BAC
B)(EV-PV)/BAC
C)AC/EAC
D)(EV-AC)/BAC
E)(EV-PV)/EAC
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
38
Scope creep affects:

A)The organization
B)The project team
C)The project suppliers
D)Both A and B are correct
E)A, B, and C are all correct
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
39
The percent complete index that looks at percent complete in terms of budgeted amounts is calculated by which of the following?

A)EV/BAC
B)(EV-PV)/BAC
C)AC/EAC
D)(EV-AC)/BAC
E)(EV-PV)/EAC
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
40
The ________ is the difference between the earned value and the actual costs for the work completed to date.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
41
The network chart is the most favored, used, and understandable option for reporting project progress to upper management.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
42
Control is one of the most neglected areas of project management.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
43
Measuring performance against budget is simply a case of comparing actual versus budget.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
44
Earned value is defined as the budgeted cost of the work performed.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
45
The best method for assigning costs to the baseline is to establish frequent __________ over the duration of the work package.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
46
The PCIC index measures the project percent complete in relation to the resources that have actually been used so far on the project.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
47
The PCIB index measures the project percent complete in relation to the resources that were budgeted.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
48
An SPI index of 1.22 indicates that the project is ________ schedule.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
49
The ________ is the rule most frequently used by practicing project managers to both assign costs to the baseline and to measure progress using earned value.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
50
CPI and SPI are two types of indexes that measure ________.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
51
The ________ indexes compare the to-date progress to the end of the project.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
52
Although it is very difficult to measure, measuring ________ performance is as important as measuring schedule and cost performance.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
53
The units of measure for SV or CV is in terms of ________.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
54
A positive variance in SV or CV indicates a ________ condition.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
55
Milestones are significant project events that mark major accomplishments.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
56
The baseline is derived from merging information from the work packages with the project network.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
57
In a project control chart, four observations trending in one direction indicate there is a very high probability that there is an identifiable cause.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
58
When measuring percent complete in the monitoring phase of the project, it is common to limit the amount earned to __________ until the work package is 100 percent complete.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
59
The best defense against scope creep is a __________.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
60
Cost variance tells us if the ________ costs are more or less than was planned at any point over the life of the project.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
61
What is the difference between a baseline Gantt chart and a Tracking Gantt chart?
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
62
All scope changes that result in increased costs should be avoided.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
63
The best method for assigning costs to the baseline under this rule is to establish frequent checkpoints over the duration of the work package and assign completion percentages in dollar terms.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
64
Overhead costs and profit are typically included in the project baseline.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
65
An undesirable schedule variance indicates that the project is running behind schedule.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
66
The rule of using subjective estimated percent complete in combination with hard, tangible monitoring points works well on long-duration activities that can be broken into short discrete work packages.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
67
Baseline costs typically include labor, equipment, materials and direct overhead cost.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
68
Earned value is calculated by taking the percent complete times the original budget.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
69
The key to managing scope creep is change management.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
70
The best defense against scope creep is accepting only major changes.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
71
In calculating schedule variance and cost variance, a negative variance indicates a desirable condition, and a positive variance suggests problems.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
72
Cost variance tells us the different estimates among vendors needed to complete the project over the life of the project.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
73
One method of estimating the costs to complete a project is to divide the work remaining by the CPI.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
74
A CPI index of 0.97 indicates that the project has spent less money than budgeted.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
75
The major reasons for creating a baseline are to monitor and report progress and to estimate cash flow.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
76
Conducting an earned value analysis requires three data elements.Identify the acronyms for each and describe what they are.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
77
Identify and briefly describe the three percent complete rules for placing costs in baselines.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
78
The original earned value cost/schedule system was pioneered by the U.S.Department of Defense in the 1960s.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
79
Identify the steps in creating a control process that measure and evaluate project performance.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
80
Scope Creep refers to any significant changes made in the project once it is underway.
Unlock Deck
Unlock for access to all 88 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 88 flashcards in this deck.