Deck 13: Plc Installation Practices,editing,and Troubleshooting

Full screen (f)
exit full mode
Question
A fiber optic wired control system is most susceptible electrical noise.
Use Space or
up arrow
down arrow
to flip the card.
Question
Common potential noise generating devices include noninductive resistive loads.
Question
Running signal wiring and power wiring in the same conduit helps to cut down on electrical noise.
Question
Most PLC installations require additional cooling provisions,not included in the original installation.
Question
A diode can be connected in reverse-bias across a DC solenoid to suppress voltage spikes.
Question
Ground loop circuits cause problems by adding or subtracting current or voltage from input signal sources.
Question
A hardwired electromechanical master control relay is not normally included as part of the wiring for a PLC system.
Question
A properly installed grounding system is designed to provide a high-impedance path to earth ground.
Question
A ground loop circuit can develop when each device's ground is tied to a different earth potential.
Question
Leakage current can falsely activate a PLC input.
Question
A bleeder resistor can be connected to drain off unwanted module leakage current.
Question
An enclosure is used to shield the controller from electrical noise and airborne contaminants.
Question
Where line voltage variations to the PLC are excessive,a constant voltage transformer can be used to maintain a steady voltage.
Question
PLCs are generally placed within an enclosure.
Question
When a grounding connection must be made to the metal enclosure of a PLC system,any paint coating must be removed.
Question
Electromagnetic interference (EMI)may enter a PLC system through radiation.
Question
When current in to a DC resistive load is interrupted or turned off,a very high voltage spike is generated.
Question
Most solid-state switches will conduct a small amount of leakage current in the off state.
Question
Generally,output modules designed to drive inductive loads include suppression networks as part of the module circuit.
Question
PLC malfunctions due to electrical noise usually produce temporary occurrences of operating errors.
Question
A metal oxide varistor (MOV)can be use to suppress AC or DC voltages.
Question
The temporary end instruction is used when you want to change the amount of logic being scanned.
Question
One of the diagnostic checks carried out by the processor is the proper operation of all I/O devices.
Question
PLC output modules may incorporate fuse or electronic protection for output circuitry.
Question
Using PLC editing functions,instructions and rungs can be added,deleted,or modified.
Question
It is rare for sensors and actuators connected to the I/O of the process to fail.
Question
The offline programming mode permits the user to change the program during the machine operation.
Question
To make sure that equipment does not operate while PLC maintenance is conducted lockout and tagout devices must be in use.
Question
The suppression device is normally wired in series with the load device.
Question
An addressing conflict is caused by the same address being used for two or more coil instructions in the same program.
Question
The contact histogram function is used to locate each instance of a selected address.
Question
If the scan time is too long,a watchdog error will be declared.
Question
The programming device monitor normally indicates a true instruction if the addressed input device is off and examined for an off condition.
Question
The cross reference function allows you to view the transition history of a data table value.
Question
The suspend instruction is used to trap and identify specific conditions.
Question
Preparing a PLC control process for initial start-up is known as commissioning.
Question
When a PLC is placed in the continuous test mode,the processor operates the user program without energizing any outputs.
Question
The processor of a PLC monitors its battery voltage level.
Question
The status indicator on an input module will normally be illuminated if the input device is off and examined for an off condition.
Question
The PLC will only accept multiple programs.
Question
I/O leakage problems usually occur with devices that use:

A)solid-state switching circuits.
B)hard contacts.
C)noise-suppression circuits.
D)voltage-suppression circuits.
Question
Electrical noise can be coupled into a PLC system:

A)by an electrostatic field.
B)through electromagnetic induction.
C)by a fiber optic system.
D)both a and b.
Question
When routing power and I/O signal wiring to and within a PLC enclosure you should:

A)use the shortest possible wire runs for I/O signals.
B)never run signal and power wiring in the same conduit.
C)run low level signal conductors as shielded twisted pair.
D)all of these.
Question
Proper grounding procedures for a PLC installation specify that:

A)all enclosures,CPU and I/O chassis,and power supplies be connected to a single low-impedance ground.
B)paint or nonconductive materials should be scraped away to provide good ground connections.
C)all ground connections should be made using star washers.
D)all of these.
Question
Communications protocol is a standardized method for establishing communications between different PLC devices.
Question
Under no circumstances should:

A)fiber optic and power wiring be run in the same conduit.
B)fiber optic and signal wiring be run in the same conduit.
C)signal wiring and power wiring be run in the same conduit.
D)All of the above.
Question
In addition to being an important safety measure,proper grounding of a PLC system can:

A)lower installation costs.
B)increase the power efficiency of the system.
C)limit the effects of EMI.
D)assist in the operation of the MCR.
Question
A leakage problem can occur when connecting an output module to a high-impedance load.This problem can be corrected by connecting:

A)a bleeder resistor in series with the load.
B)a bleeder resistor in parallel with the load.
C)an NO contact in series with the load.
D)an NC contact in parallel with the load.
Question
For most PLC installations,a NEMA ____enclosure is recommended.

A)2
B)4
C)8
D)12
Question
Which of the following load devices is most likely to require some form of noise or voltage suppression?

A)Lamp
B)Heater
C)Solenoid
D)LED display
Question
Which of the following would not normally be located within the PLC enclosure?

A)I/O modules
B)Limit switch
C)Master control relay
D)Isolation transformer
Question
PLCs are placed within an enclosure to provide protection against:

A)atmospheric conditions.
B)conductive dust.
C)moisture.
D)all of these.
Question
Malfunctions due to electrical noise interference usually cause:

A)temporary occurrences of operating errors.
B)permanent occurrences of operating errors.
C)temporary loss of memory.
D)permanent loss of memory.
Question
Excessive line voltage variations to a PLC installation can be corrected by installing a:

A)constant voltage transformer.
B)step-down transformer.
C)step-up transformer.
D)current transformer.
Question
A good location for a PLC enclosure is close to:

A)the machine or processor.
B)large ac motors.
C)high frequency welders.
D)annealing furnaces.
Question
The diode used in the suppression circuit shown: <strong>The diode used in the suppression circuit shown:  </strong> A)is connected in forward-bias to suppress DC loads. B)is connected in reverse-bias to suppress DC loads. C)is connected in forward-bias to suppress AC loads. D)is connected in reverse-bias to suppress AC loads. <div style=padding-top: 35px>

A)is connected in forward-bias to suppress DC loads.
B)is connected in reverse-bias to suppress DC loads.
C)is connected in forward-bias to suppress AC loads.
D)is connected in reverse-bias to suppress AC loads.
Question
Certain input field devices may have a small leakage current when they are:

A)in the on state.
B)in the off state.
C)examined for an on condition.
D)examined for an off condition.
Question
The authoritative source on grounding requirements for a PLC installation is the:

A)plant electrician.
B)plant engineer.
C)equipment manufacturer.
D)National Electrical Code.
Question
Typically,PLC systems installed inside an enclosure can withstand a maximum of:

A)60 °\degree C outside the enclosure.
B)50 °\degree C outside the enclosure.
C)60 °\degree C inside the enclosure.
D)50 °\degree C inside the enclosure.
Question
A high voltage spike is generated whenever current to:

A)an inductive load is turned off.
B)an inductive load is turned on.
C)a resistive load is turned off.
D)a resistive load is turned on.
Question
Which of the following is not normally included in the array of status indicators found on the processor module?

A)Memory OK
B)Wiring OK
C)Battery OK
D)Power supply OK
Question
With reference to the condition illustrated,what is the most likely fault? <strong>With reference to the condition illustrated,what is the most likely fault?  </strong> A)Short circuit in the field device or wiring. B)Input module fault. C)Processor module fault. D)Open in the field device or wiring. <div style=padding-top: 35px>

A)Short circuit in the field device or wiring.
B)Input module fault.
C)Processor module fault.
D)Open in the field device or wiring.
Question
Preparing a PLC control process for start-up is called:

A)commissioning
B)troubleshooting
C)validating
D)installing
Question
A single output device has failed while the remainder of the PLC system is functioning normally.The indicator light on the output module indicates that a signal is sent to the output point where the device is connected.You would now:

A)trace the circuit back through the logic to locate the inputs.
B)use a programming terminal to call up the rung that controls the output to see if the output coil is on.
C)check the point where the output device's field wiring is connected to the output rack.
D)check the input modules for short-circuit conditions.
Question
Editing a PLC program normally refers to:

A)replacement of an existing program.
B)monitoring of an existing program.
C)making changes to an existing program.
D)all of these.
Question
With reference to the input module circuit shown,a voltmeter reading of 24 VDC would indicate: <strong>With reference to the input module circuit shown,a voltmeter reading of 24 VDC would indicate:  </strong> A)normal operation. B)a possible shorted PB. C)a possible fault in the field wiring. D)either b or c. <div style=padding-top: 35px>

A)normal operation.
B)a possible shorted PB.
C)a possible fault in the field wiring.
D)either b or c.
Question
Which of the choices of the troubleshooting guide shown indicates a problem with the wiring to the output device or the output device itself? <strong>Which of the choices of the troubleshooting guide shown indicates a problem with the wiring to the output device or the output device itself?  </strong> A)Condition (a) B)Condition (b) C)Condition (c) D)Condition (d) <div style=padding-top: 35px>

A)Condition (a)
B)Condition (b)
C)Condition (c)
D)Condition (d)
Question
The data monitor feature of a PLC may allow you to:

A)change the radix or data format.
B)store data for an instruction prior to use.
C)view data within an instruction.
D)all of these.
Question
If an output module fuse blows repeatedly,a probable cause may be:

A)the module's output current is being exceeded.
B)the output device may be shorted.
C)the output field wiring may be shorted.
D)anyone of these.
Question
With reference to the troubleshooting guide,which condition indicates no fault? <strong>With reference to the troubleshooting guide,which condition indicates no fault?  </strong> A)Condition (a) B)Condition (b) C)Condition (c) D)Condition (d) <div style=padding-top: 35px>

A)Condition (a)
B)Condition (b)
C)Condition (c)
D)Condition (d)
Question
Which function of a PLC would be used to view the transition history (on or off states)of a bit(s)?

A)Change radix.
B)Forcing.
C)Cross reference.
D)Contact histogram.
Question
Which function of a PLC would be used to search each instance of a particular address?

A)Change radix.
B)Forcing.
C)Cross reference.
D)Contact histogram.
Question
Assume an open in the field wiring is suspected between the output module and output load device.This condition would be confirmed if:

A)full output voltage was measured at the module and 0 voltage at the load.
B)full output voltage was measured at the load and 0 voltage at the module.
C)the output status indicator on the module is on and the load is not operating.
D)the output status indicator on the module is off and the load is not operating.
Question
The force instructions:

A)will force data table bits on only.
B)will force data table bits off only.
C)if used indiscriminately,could cause haphazard machine operation.
D)can be used only to force inputs.
Question
The suppression circuit shown: <strong>The suppression circuit shown:  </strong> A)can be used to suppress DC loads. B)can be used to suppress AC loads. C)uses a metal oxide surge suppressor. D)all of these. <div style=padding-top: 35px>

A)can be used to suppress DC loads.
B)can be used to suppress AC loads.
C)uses a metal oxide surge suppressor.
D)all of these.
Question
The majority of PLC system faults are caused by:

A)faulty power supplies.
B)malfunctioning microprocessors.
C)software failure.
D)field wiring and devices.
Question
In which of the following program modes are modifications executed immediately on entry of the instruction?

A)Continuous test mode
B)Single scan test mode
C)Off-line program mode
D)On-line program mode
Question
Which of the following would not normally be included as part of a routine preventive maintenance program?

A)Inspection of I/O field devices
B)Monitoring the program
C)Checking connections to I/O modules
D)Cleaning of the PLC enclosure
Question
The input wiring or device is suspected as being the source of a PLC problem.If this circuit is not at fault,then the status indicator on the input module should be illuminated when the input device is:

A)closed and programmed for an XIC condition.
B)open and programmed for an XIO condition.
C)closed,regardless of how it is programmed.
D)open,regardless of how it is programmed.
Question
A watchdog timer is used to monitor:

A)how long it takes the CPU to complete a scan.
B)battery voltage.
C)memory circuits.
D)all of these.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/87
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 13: Plc Installation Practices,editing,and Troubleshooting
1
A fiber optic wired control system is most susceptible electrical noise.
False
2
Common potential noise generating devices include noninductive resistive loads.
False
3
Running signal wiring and power wiring in the same conduit helps to cut down on electrical noise.
False
4
Most PLC installations require additional cooling provisions,not included in the original installation.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
5
A diode can be connected in reverse-bias across a DC solenoid to suppress voltage spikes.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
6
Ground loop circuits cause problems by adding or subtracting current or voltage from input signal sources.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
7
A hardwired electromechanical master control relay is not normally included as part of the wiring for a PLC system.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
8
A properly installed grounding system is designed to provide a high-impedance path to earth ground.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
9
A ground loop circuit can develop when each device's ground is tied to a different earth potential.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
10
Leakage current can falsely activate a PLC input.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
11
A bleeder resistor can be connected to drain off unwanted module leakage current.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
12
An enclosure is used to shield the controller from electrical noise and airborne contaminants.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
13
Where line voltage variations to the PLC are excessive,a constant voltage transformer can be used to maintain a steady voltage.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
14
PLCs are generally placed within an enclosure.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
15
When a grounding connection must be made to the metal enclosure of a PLC system,any paint coating must be removed.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
16
Electromagnetic interference (EMI)may enter a PLC system through radiation.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
17
When current in to a DC resistive load is interrupted or turned off,a very high voltage spike is generated.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
18
Most solid-state switches will conduct a small amount of leakage current in the off state.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
19
Generally,output modules designed to drive inductive loads include suppression networks as part of the module circuit.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
20
PLC malfunctions due to electrical noise usually produce temporary occurrences of operating errors.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
21
A metal oxide varistor (MOV)can be use to suppress AC or DC voltages.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
22
The temporary end instruction is used when you want to change the amount of logic being scanned.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
23
One of the diagnostic checks carried out by the processor is the proper operation of all I/O devices.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
24
PLC output modules may incorporate fuse or electronic protection for output circuitry.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
25
Using PLC editing functions,instructions and rungs can be added,deleted,or modified.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
26
It is rare for sensors and actuators connected to the I/O of the process to fail.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
27
The offline programming mode permits the user to change the program during the machine operation.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
28
To make sure that equipment does not operate while PLC maintenance is conducted lockout and tagout devices must be in use.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
29
The suppression device is normally wired in series with the load device.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
30
An addressing conflict is caused by the same address being used for two or more coil instructions in the same program.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
31
The contact histogram function is used to locate each instance of a selected address.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
32
If the scan time is too long,a watchdog error will be declared.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
33
The programming device monitor normally indicates a true instruction if the addressed input device is off and examined for an off condition.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
34
The cross reference function allows you to view the transition history of a data table value.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
35
The suspend instruction is used to trap and identify specific conditions.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
36
Preparing a PLC control process for initial start-up is known as commissioning.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
37
When a PLC is placed in the continuous test mode,the processor operates the user program without energizing any outputs.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
38
The processor of a PLC monitors its battery voltage level.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
39
The status indicator on an input module will normally be illuminated if the input device is off and examined for an off condition.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
40
The PLC will only accept multiple programs.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
41
I/O leakage problems usually occur with devices that use:

A)solid-state switching circuits.
B)hard contacts.
C)noise-suppression circuits.
D)voltage-suppression circuits.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
42
Electrical noise can be coupled into a PLC system:

A)by an electrostatic field.
B)through electromagnetic induction.
C)by a fiber optic system.
D)both a and b.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
43
When routing power and I/O signal wiring to and within a PLC enclosure you should:

A)use the shortest possible wire runs for I/O signals.
B)never run signal and power wiring in the same conduit.
C)run low level signal conductors as shielded twisted pair.
D)all of these.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
44
Proper grounding procedures for a PLC installation specify that:

A)all enclosures,CPU and I/O chassis,and power supplies be connected to a single low-impedance ground.
B)paint or nonconductive materials should be scraped away to provide good ground connections.
C)all ground connections should be made using star washers.
D)all of these.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
45
Communications protocol is a standardized method for establishing communications between different PLC devices.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
46
Under no circumstances should:

A)fiber optic and power wiring be run in the same conduit.
B)fiber optic and signal wiring be run in the same conduit.
C)signal wiring and power wiring be run in the same conduit.
D)All of the above.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
47
In addition to being an important safety measure,proper grounding of a PLC system can:

A)lower installation costs.
B)increase the power efficiency of the system.
C)limit the effects of EMI.
D)assist in the operation of the MCR.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
48
A leakage problem can occur when connecting an output module to a high-impedance load.This problem can be corrected by connecting:

A)a bleeder resistor in series with the load.
B)a bleeder resistor in parallel with the load.
C)an NO contact in series with the load.
D)an NC contact in parallel with the load.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
49
For most PLC installations,a NEMA ____enclosure is recommended.

A)2
B)4
C)8
D)12
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
50
Which of the following load devices is most likely to require some form of noise or voltage suppression?

A)Lamp
B)Heater
C)Solenoid
D)LED display
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
51
Which of the following would not normally be located within the PLC enclosure?

A)I/O modules
B)Limit switch
C)Master control relay
D)Isolation transformer
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
52
PLCs are placed within an enclosure to provide protection against:

A)atmospheric conditions.
B)conductive dust.
C)moisture.
D)all of these.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
53
Malfunctions due to electrical noise interference usually cause:

A)temporary occurrences of operating errors.
B)permanent occurrences of operating errors.
C)temporary loss of memory.
D)permanent loss of memory.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
54
Excessive line voltage variations to a PLC installation can be corrected by installing a:

A)constant voltage transformer.
B)step-down transformer.
C)step-up transformer.
D)current transformer.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
55
A good location for a PLC enclosure is close to:

A)the machine or processor.
B)large ac motors.
C)high frequency welders.
D)annealing furnaces.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
56
The diode used in the suppression circuit shown: <strong>The diode used in the suppression circuit shown:  </strong> A)is connected in forward-bias to suppress DC loads. B)is connected in reverse-bias to suppress DC loads. C)is connected in forward-bias to suppress AC loads. D)is connected in reverse-bias to suppress AC loads.

A)is connected in forward-bias to suppress DC loads.
B)is connected in reverse-bias to suppress DC loads.
C)is connected in forward-bias to suppress AC loads.
D)is connected in reverse-bias to suppress AC loads.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
57
Certain input field devices may have a small leakage current when they are:

A)in the on state.
B)in the off state.
C)examined for an on condition.
D)examined for an off condition.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
58
The authoritative source on grounding requirements for a PLC installation is the:

A)plant electrician.
B)plant engineer.
C)equipment manufacturer.
D)National Electrical Code.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
59
Typically,PLC systems installed inside an enclosure can withstand a maximum of:

A)60 °\degree C outside the enclosure.
B)50 °\degree C outside the enclosure.
C)60 °\degree C inside the enclosure.
D)50 °\degree C inside the enclosure.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
60
A high voltage spike is generated whenever current to:

A)an inductive load is turned off.
B)an inductive load is turned on.
C)a resistive load is turned off.
D)a resistive load is turned on.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
61
Which of the following is not normally included in the array of status indicators found on the processor module?

A)Memory OK
B)Wiring OK
C)Battery OK
D)Power supply OK
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
62
With reference to the condition illustrated,what is the most likely fault? <strong>With reference to the condition illustrated,what is the most likely fault?  </strong> A)Short circuit in the field device or wiring. B)Input module fault. C)Processor module fault. D)Open in the field device or wiring.

A)Short circuit in the field device or wiring.
B)Input module fault.
C)Processor module fault.
D)Open in the field device or wiring.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
63
Preparing a PLC control process for start-up is called:

A)commissioning
B)troubleshooting
C)validating
D)installing
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
64
A single output device has failed while the remainder of the PLC system is functioning normally.The indicator light on the output module indicates that a signal is sent to the output point where the device is connected.You would now:

A)trace the circuit back through the logic to locate the inputs.
B)use a programming terminal to call up the rung that controls the output to see if the output coil is on.
C)check the point where the output device's field wiring is connected to the output rack.
D)check the input modules for short-circuit conditions.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
65
Editing a PLC program normally refers to:

A)replacement of an existing program.
B)monitoring of an existing program.
C)making changes to an existing program.
D)all of these.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
66
With reference to the input module circuit shown,a voltmeter reading of 24 VDC would indicate: <strong>With reference to the input module circuit shown,a voltmeter reading of 24 VDC would indicate:  </strong> A)normal operation. B)a possible shorted PB. C)a possible fault in the field wiring. D)either b or c.

A)normal operation.
B)a possible shorted PB.
C)a possible fault in the field wiring.
D)either b or c.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
67
Which of the choices of the troubleshooting guide shown indicates a problem with the wiring to the output device or the output device itself? <strong>Which of the choices of the troubleshooting guide shown indicates a problem with the wiring to the output device or the output device itself?  </strong> A)Condition (a) B)Condition (b) C)Condition (c) D)Condition (d)

A)Condition (a)
B)Condition (b)
C)Condition (c)
D)Condition (d)
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
68
The data monitor feature of a PLC may allow you to:

A)change the radix or data format.
B)store data for an instruction prior to use.
C)view data within an instruction.
D)all of these.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
69
If an output module fuse blows repeatedly,a probable cause may be:

A)the module's output current is being exceeded.
B)the output device may be shorted.
C)the output field wiring may be shorted.
D)anyone of these.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
70
With reference to the troubleshooting guide,which condition indicates no fault? <strong>With reference to the troubleshooting guide,which condition indicates no fault?  </strong> A)Condition (a) B)Condition (b) C)Condition (c) D)Condition (d)

A)Condition (a)
B)Condition (b)
C)Condition (c)
D)Condition (d)
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
71
Which function of a PLC would be used to view the transition history (on or off states)of a bit(s)?

A)Change radix.
B)Forcing.
C)Cross reference.
D)Contact histogram.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
72
Which function of a PLC would be used to search each instance of a particular address?

A)Change radix.
B)Forcing.
C)Cross reference.
D)Contact histogram.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
73
Assume an open in the field wiring is suspected between the output module and output load device.This condition would be confirmed if:

A)full output voltage was measured at the module and 0 voltage at the load.
B)full output voltage was measured at the load and 0 voltage at the module.
C)the output status indicator on the module is on and the load is not operating.
D)the output status indicator on the module is off and the load is not operating.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
74
The force instructions:

A)will force data table bits on only.
B)will force data table bits off only.
C)if used indiscriminately,could cause haphazard machine operation.
D)can be used only to force inputs.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
75
The suppression circuit shown: <strong>The suppression circuit shown:  </strong> A)can be used to suppress DC loads. B)can be used to suppress AC loads. C)uses a metal oxide surge suppressor. D)all of these.

A)can be used to suppress DC loads.
B)can be used to suppress AC loads.
C)uses a metal oxide surge suppressor.
D)all of these.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
76
The majority of PLC system faults are caused by:

A)faulty power supplies.
B)malfunctioning microprocessors.
C)software failure.
D)field wiring and devices.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
77
In which of the following program modes are modifications executed immediately on entry of the instruction?

A)Continuous test mode
B)Single scan test mode
C)Off-line program mode
D)On-line program mode
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
78
Which of the following would not normally be included as part of a routine preventive maintenance program?

A)Inspection of I/O field devices
B)Monitoring the program
C)Checking connections to I/O modules
D)Cleaning of the PLC enclosure
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
79
The input wiring or device is suspected as being the source of a PLC problem.If this circuit is not at fault,then the status indicator on the input module should be illuminated when the input device is:

A)closed and programmed for an XIC condition.
B)open and programmed for an XIO condition.
C)closed,regardless of how it is programmed.
D)open,regardless of how it is programmed.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
80
A watchdog timer is used to monitor:

A)how long it takes the CPU to complete a scan.
B)battery voltage.
C)memory circuits.
D)all of these.
Unlock Deck
Unlock for access to all 87 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 87 flashcards in this deck.