Question
During the post-implementation phase,a project is brought to its proper completion.
Use Space or
up arrow
down arrow
to flip the card.
Question
Complexity refers to the extent to which the items or elements upon which work is performed or the work processes themselves are interrelated.
Question
Final launch documents are an output associated with the closure phase.
Question
Based on research cited in the textbook,31 percent of software projects were canceled before completion and cost an average of 189 percent of their original estimates in more than half the projects.
Question
An example of a project is an accounting clerk entering journal entries.
Question
Quality functional deployment,Kano model,and affinity diagrams are tools used during the design phase.
Question
When developed,the DVD player was considered a Type C Level 1 project.
Question
A benefit of project management is that it creates a structure and process that enables a project to be kept under control.
Question
Conceptualization is a process used to set the goals of a project,develop strategies to support an organization's strategic goals,and outline tasks and schedules to accomplish the project goals.
Question
A discovery audit is a controlled process for identifying potential problems and opportunities.
Question
Complexity in a project is directly attributed to the scope of the project.
Question
Interdependence refers to the number of products or operations that are performed at the same time and the resulting degree of difficulty.
Question
Projects are straightforward and not restrained by technological complexity,organizational complexity,and management complexity.
Question
User manuals are an output associated with the implementation phase.
Question
A project has a beginning and an end.
Question
A clear statement of project needs is an output associated with the planning phase.
Question
The pre-feasibility study is usually used to assess whether to conduct a full feasibility study.
Question
A project is a set of activities to solve a problem or take advantage of an opportunity.
Question
Risk management plans are an output associated with the analysis phase.
Question
Project management and engineering and services of projects are the two main streams of project activities.
Question
Projects relying on mature technologies for all industries to have equal access are classified as

A)Type A projects.
B)Type B projects.
C)Type C projects.
D)Type D projects.
Question
The number of products or operations that are performed at the same time and the resulting degree of difficulty best defines

A)complexity.
B)interdependence.
C)uncertainty.
D)product count.
Question
Poor communication can lead to overall project failure.
Question
The extent to which the items or elements upon which work is performed or the work processes themselves are interrelated best defines

A)uncertainty.
B)interdependence.
C)sufficiency.
D)complexity.
Question
The project management process helps individuals and organizations map a clear strategy to complete a project successfully.
Question
The discipline of project management is about providing tools and techniques to enable a project team to organize its work and meet the project success factors.
Question
Each of the following is an underlying dimension encompassing almost all aspects of technology except

A)interdependence.
B)uncertainty.
C)complexity.
D)distribution.
Question
A project

A)has a beginning and a definite end.
B)expends resources.
C)has constraints and requirements that may include scope,budget,schedule,and resources,performance factors,and creation of value to stakeholders.
D)All of the above are correct.
Question
Politics and conflicts can lead to overall project failure.
Question
The overall success factor of a project is the realized value of the project that can be measured by the project stakeholders.
Question
Scope constraint refers to the amount of time available to complete a project.
Question
Project value refers to the overall worth of a project.
Question
Project success and project management success are the same.
Question
According to a study cited in the textbook,inadequate management practices are associated with project failure.What is the percentage?

A)45%
B)65%
C)25%
D)5%
Question
Projects requiring development of new technologies,providing great competitive advantage are classified as

A)Type A projects.
B)Type B projects.
C)Type C projects.
D)Type D projects.
Question
A unique activity that adds value,expends resources,has beginning and end dates,and has constraints and requirements that include scope,cost,schedule performance,resources and value best defines

A)project.
B)task.
C)activity.
D)job.
Question
Stringent performance measures can lead to increased time,increased scope,and increased cost.
Question
A project may be successfully managed but may not meet customer expectations.
Question
The variability in the process of transformation of inputs to outputs or in the inputs themselves best defines

A)specificity.
B)complexity.
C)uncertainty.
D)interdependence.
Question
Constructing buildings as environmentally friendly and energy efficient as possible by using more recyclable and earth-friendly products best describes

A)red construction.
B)blue construction.
C)green construction.
D)yellow construction.
Question
Customer acceptance documents are an output of this phase.

A)conceptualization
B)analysis design/development
C)implementation execution testing
D)launch termination closure
Question
Which of the following project life span phases helps to identify certain technical problems and issues in a project that may require additional investigation?

A)conceptualization
B)planning
C)design
D)implementation
Question
A detailed study in a controlled process to identify potential problems and opportunities best defines

A)project plan.
B)project charter.
C)feasibility study.
D)request for proposal.
Question
The first phase in the project life span is

A)design.
B)conceptualization.
C)planning.
D)implementation.
Question
Tested product or system,training manuals,and user manuals are outputs of this phase.

A)conceptualization
B)design
C)implementation
D)closure
Question
During this phase,progress and success are measured,project documents are archived,lessons learned are captured,and project activities are formally closed.

A)post-implementation
B)closure
C)conceptualization
D)implementation
Question
Factors that may cause project management to fail include

A)wrong project manager.
B)lack or misuse of project management techniques.
C)inadequate rationale,objectives,tasks,and goals.
D)all of the above.
Question
Successful project management requires each of the following except

A)good planning and required resources with a commitment to complete projects.
B)a skilled project manager.
C)good communication and information flows.
D)end users with project management experience.
Question
Project life span phases include each of the following except

A)reassignment.
B)design.
C)planning.
D)implementation.
Question
Project failure is caused by each of the following except

A)cost and duration.
B)enhanced communication.
C)unrealistic goals.
D)customer dissatisfaction.
Question
The act of collaboration among people and other required resources such that a project is planned,organized,and controlled effectively to accomplish its goals and objectives best defines

A)project management.
B)knowledge acquisition.
C)project planning.
D)project implementation.
Question
Factors affecting project progress include each of the following except

A)cost of each phase.
B)value chain assessment during each phase.
C)resource allocation in each phase.
D)amount of materials utilized in each phase.
Question
In which of the following phases are products,services,and systems realized?

A)conceptualization
B)planning
C)design
D)implementation
Question
When classified according to complexity,a public transportation system project would be classified as a

A)Level 2.
B)Level 3.
C)Level 1.
D)Level 4.
Question
An idea or thought that refers to the reflection of a targeted business function or process and how the various facets of the process or function relate to each other best defines

A)commitment.
B)pre-feasibility study.
C)conceptualization.
D)closure.
Question
A process used to set the goals of a project,develop strategies to support an organization's strategic goals,and outline tasks and schedules to accomplish the project goals best defines

A)planning.
B)assessment.
C)implementation.
D)conceptualization.
Question
A project life span is

A)a progression through a series of differing stages of project development.
B)the total of the phases through which a project passes from the time it is initially conceived until the time it is either in use as a success or abandoned as a failure.
C)often used to explain changes in project strategic decision priorities,changes in project strategic outlook,and their effect on organizational structure and perceptions of organizational effectiveness criteria.
D)all of the above.
Question
Software being coded,contracts tendered and awarded,and construction work being undertaken will generally occur during

A)conceptualization.
B)planning.
C)design.
D)implementation.
Question
A preliminary study to assess whether to conduct a full feasibility study or not best describes

A)conceptualization.
B)case justification.
C)alignment.
D)pre-feasibility study.
Question
Outputs for this phase include communication plans,change management plans,performance plans,and value plans.

A)implementation
B)planning
C)conceptualization
D)design
Question
Which of the following consists of the features and functions that characterize a product,a service,a system,or a structure?

A)project scope
B)product scope
C)business case
D)project deliverable
Question
The general work that needs to be accomplished to deliver a product,a system,a structure,or a service with the specified features and functions best defines

A)product scope.
B)project scope.
C)project range.
D)project deliverable.
Question
A communication plan is developed during the

A)design phase.
B)planning phase.
C)conceptualization phase.
D)closure phase.
Question
Define project.Identify four major types of projects.
Question
List the six project life span phases.For each phase,identify one task completed during that phase.
Question
Establishing lessons learned occurs during the

A)conceptualization phase.
B)planning phase.
C)post-implementation phase.
D)implementation phase.
Question
An available supply of assets,capabilities,processes,attributes,and knowledge in an organization best defines

A)project resources.
B)project inventory.
C)project repository.
D)project scope.
Question
Ensuring compliance plans occurs during the

A)planning phase.
B)post-implementation phase.
C)implementation phase.
D)design phase.
Question
For each project life span phase,identify one tool that may be used.
Question
An investigation of available resources is undertaken during the

A)planning phase.
B)design phase.
C)conceptualization phase.
D)implementation phase.
Question
The list of all activities of a project with intended start and end dates linked by dependencies and constraints of a project best defines

A)project calendar.
B)business case.
C)project schedule.
D)project scope.
Question
The foundation of successful projects includes each of the following except

A)money.
B)strategy.
C)leadership.
D)management.
Question
Quality standards are refined during the

A)conceptualization phase.
B)planning phase.
C)design phase.
D)implementation phase.
Question
The sum of all costs to complete a project best describes

A)feasibility costs.
B)total cost of ownership.
C)project budget.
D)project costs.
Question
List five potential benefits of project management.
Question
A project audit is conducted during the

A)post-implementation phase.
B)design phase.
C)conceptualization phase.
D)closure phase.
Question
The project is finalized during the

A)closure phase.
B)post-implementation phase.
C)design phase.
D)implementation phase.
Question
Factors and constraints affecting either the success or failure of projects include

A)completion of the project to maximize project value for stakeholders.
B)completion of the project within established performance and technology standards.
C)completion of the project within allocated resources.
D)all of the above.
Question
Identify six factors and constraints that affect either the success or the failure of projects.
Question
The overall quality of a project in terms of its impacts and benefits best defines

A)project feasibility.
B)project range.
C)project performance.
D)project scope.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/80
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 1: Projects and Project Management
1
During the post-implementation phase,a project is brought to its proper completion.
False
2
Complexity refers to the extent to which the items or elements upon which work is performed or the work processes themselves are interrelated.
False
3
Final launch documents are an output associated with the closure phase.
True
4
Based on research cited in the textbook,31 percent of software projects were canceled before completion and cost an average of 189 percent of their original estimates in more than half the projects.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
5
An example of a project is an accounting clerk entering journal entries.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
6
Quality functional deployment,Kano model,and affinity diagrams are tools used during the design phase.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
7
When developed,the DVD player was considered a Type C Level 1 project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
8
A benefit of project management is that it creates a structure and process that enables a project to be kept under control.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
9
Conceptualization is a process used to set the goals of a project,develop strategies to support an organization's strategic goals,and outline tasks and schedules to accomplish the project goals.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
10
A discovery audit is a controlled process for identifying potential problems and opportunities.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
11
Complexity in a project is directly attributed to the scope of the project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
12
Interdependence refers to the number of products or operations that are performed at the same time and the resulting degree of difficulty.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
13
Projects are straightforward and not restrained by technological complexity,organizational complexity,and management complexity.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
14
User manuals are an output associated with the implementation phase.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
15
A project has a beginning and an end.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
16
A clear statement of project needs is an output associated with the planning phase.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
17
The pre-feasibility study is usually used to assess whether to conduct a full feasibility study.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
18
A project is a set of activities to solve a problem or take advantage of an opportunity.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
19
Risk management plans are an output associated with the analysis phase.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
20
Project management and engineering and services of projects are the two main streams of project activities.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
21
Projects relying on mature technologies for all industries to have equal access are classified as

A)Type A projects.
B)Type B projects.
C)Type C projects.
D)Type D projects.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
22
The number of products or operations that are performed at the same time and the resulting degree of difficulty best defines

A)complexity.
B)interdependence.
C)uncertainty.
D)product count.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
23
Poor communication can lead to overall project failure.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
24
The extent to which the items or elements upon which work is performed or the work processes themselves are interrelated best defines

A)uncertainty.
B)interdependence.
C)sufficiency.
D)complexity.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
25
The project management process helps individuals and organizations map a clear strategy to complete a project successfully.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
26
The discipline of project management is about providing tools and techniques to enable a project team to organize its work and meet the project success factors.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
27
Each of the following is an underlying dimension encompassing almost all aspects of technology except

A)interdependence.
B)uncertainty.
C)complexity.
D)distribution.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
28
A project

A)has a beginning and a definite end.
B)expends resources.
C)has constraints and requirements that may include scope,budget,schedule,and resources,performance factors,and creation of value to stakeholders.
D)All of the above are correct.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
29
Politics and conflicts can lead to overall project failure.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
30
The overall success factor of a project is the realized value of the project that can be measured by the project stakeholders.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
31
Scope constraint refers to the amount of time available to complete a project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
32
Project value refers to the overall worth of a project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
33
Project success and project management success are the same.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
34
According to a study cited in the textbook,inadequate management practices are associated with project failure.What is the percentage?

A)45%
B)65%
C)25%
D)5%
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
35
Projects requiring development of new technologies,providing great competitive advantage are classified as

A)Type A projects.
B)Type B projects.
C)Type C projects.
D)Type D projects.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
36
A unique activity that adds value,expends resources,has beginning and end dates,and has constraints and requirements that include scope,cost,schedule performance,resources and value best defines

A)project.
B)task.
C)activity.
D)job.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
37
Stringent performance measures can lead to increased time,increased scope,and increased cost.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
38
A project may be successfully managed but may not meet customer expectations.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
39
The variability in the process of transformation of inputs to outputs or in the inputs themselves best defines

A)specificity.
B)complexity.
C)uncertainty.
D)interdependence.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
40
Constructing buildings as environmentally friendly and energy efficient as possible by using more recyclable and earth-friendly products best describes

A)red construction.
B)blue construction.
C)green construction.
D)yellow construction.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
41
Customer acceptance documents are an output of this phase.

A)conceptualization
B)analysis design/development
C)implementation execution testing
D)launch termination closure
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
42
Which of the following project life span phases helps to identify certain technical problems and issues in a project that may require additional investigation?

A)conceptualization
B)planning
C)design
D)implementation
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
43
A detailed study in a controlled process to identify potential problems and opportunities best defines

A)project plan.
B)project charter.
C)feasibility study.
D)request for proposal.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
44
The first phase in the project life span is

A)design.
B)conceptualization.
C)planning.
D)implementation.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
45
Tested product or system,training manuals,and user manuals are outputs of this phase.

A)conceptualization
B)design
C)implementation
D)closure
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
46
During this phase,progress and success are measured,project documents are archived,lessons learned are captured,and project activities are formally closed.

A)post-implementation
B)closure
C)conceptualization
D)implementation
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
47
Factors that may cause project management to fail include

A)wrong project manager.
B)lack or misuse of project management techniques.
C)inadequate rationale,objectives,tasks,and goals.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
48
Successful project management requires each of the following except

A)good planning and required resources with a commitment to complete projects.
B)a skilled project manager.
C)good communication and information flows.
D)end users with project management experience.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
49
Project life span phases include each of the following except

A)reassignment.
B)design.
C)planning.
D)implementation.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
50
Project failure is caused by each of the following except

A)cost and duration.
B)enhanced communication.
C)unrealistic goals.
D)customer dissatisfaction.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
51
The act of collaboration among people and other required resources such that a project is planned,organized,and controlled effectively to accomplish its goals and objectives best defines

A)project management.
B)knowledge acquisition.
C)project planning.
D)project implementation.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
52
Factors affecting project progress include each of the following except

A)cost of each phase.
B)value chain assessment during each phase.
C)resource allocation in each phase.
D)amount of materials utilized in each phase.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
53
In which of the following phases are products,services,and systems realized?

A)conceptualization
B)planning
C)design
D)implementation
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
54
When classified according to complexity,a public transportation system project would be classified as a

A)Level 2.
B)Level 3.
C)Level 1.
D)Level 4.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
55
An idea or thought that refers to the reflection of a targeted business function or process and how the various facets of the process or function relate to each other best defines

A)commitment.
B)pre-feasibility study.
C)conceptualization.
D)closure.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
56
A process used to set the goals of a project,develop strategies to support an organization's strategic goals,and outline tasks and schedules to accomplish the project goals best defines

A)planning.
B)assessment.
C)implementation.
D)conceptualization.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
57
A project life span is

A)a progression through a series of differing stages of project development.
B)the total of the phases through which a project passes from the time it is initially conceived until the time it is either in use as a success or abandoned as a failure.
C)often used to explain changes in project strategic decision priorities,changes in project strategic outlook,and their effect on organizational structure and perceptions of organizational effectiveness criteria.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
58
Software being coded,contracts tendered and awarded,and construction work being undertaken will generally occur during

A)conceptualization.
B)planning.
C)design.
D)implementation.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
59
A preliminary study to assess whether to conduct a full feasibility study or not best describes

A)conceptualization.
B)case justification.
C)alignment.
D)pre-feasibility study.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
60
Outputs for this phase include communication plans,change management plans,performance plans,and value plans.

A)implementation
B)planning
C)conceptualization
D)design
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
61
Which of the following consists of the features and functions that characterize a product,a service,a system,or a structure?

A)project scope
B)product scope
C)business case
D)project deliverable
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
62
The general work that needs to be accomplished to deliver a product,a system,a structure,or a service with the specified features and functions best defines

A)product scope.
B)project scope.
C)project range.
D)project deliverable.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
63
A communication plan is developed during the

A)design phase.
B)planning phase.
C)conceptualization phase.
D)closure phase.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
64
Define project.Identify four major types of projects.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
65
List the six project life span phases.For each phase,identify one task completed during that phase.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
66
Establishing lessons learned occurs during the

A)conceptualization phase.
B)planning phase.
C)post-implementation phase.
D)implementation phase.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
67
An available supply of assets,capabilities,processes,attributes,and knowledge in an organization best defines

A)project resources.
B)project inventory.
C)project repository.
D)project scope.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
68
Ensuring compliance plans occurs during the

A)planning phase.
B)post-implementation phase.
C)implementation phase.
D)design phase.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
69
For each project life span phase,identify one tool that may be used.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
70
An investigation of available resources is undertaken during the

A)planning phase.
B)design phase.
C)conceptualization phase.
D)implementation phase.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
71
The list of all activities of a project with intended start and end dates linked by dependencies and constraints of a project best defines

A)project calendar.
B)business case.
C)project schedule.
D)project scope.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
72
The foundation of successful projects includes each of the following except

A)money.
B)strategy.
C)leadership.
D)management.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
73
Quality standards are refined during the

A)conceptualization phase.
B)planning phase.
C)design phase.
D)implementation phase.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
74
The sum of all costs to complete a project best describes

A)feasibility costs.
B)total cost of ownership.
C)project budget.
D)project costs.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
75
List five potential benefits of project management.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
76
A project audit is conducted during the

A)post-implementation phase.
B)design phase.
C)conceptualization phase.
D)closure phase.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
77
The project is finalized during the

A)closure phase.
B)post-implementation phase.
C)design phase.
D)implementation phase.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
78
Factors and constraints affecting either the success or failure of projects include

A)completion of the project to maximize project value for stakeholders.
B)completion of the project within established performance and technology standards.
C)completion of the project within allocated resources.
D)all of the above.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
79
Identify six factors and constraints that affect either the success or the failure of projects.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
80
The overall quality of a project in terms of its impacts and benefits best defines

A)project feasibility.
B)project range.
C)project performance.
D)project scope.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 80 flashcards in this deck.