Buyers absorb lesser risk with cost-reimbursable contracts than they do with fixed-price contracts.
Use Space or
up arrow
down arrow
to flip the card.
Question
Reviewing performance records reduces the risk of selecting a supplier with a poor track record.
Question
The main sections of an RFP can include the statement of work and schedule information.
Question
The fee in a CPFF contract constantly varies even when the scope of a contract remains the same.
Question
An FP-EPA contract carries the least risk for a supplier.
Question
A company is considering whether to purchase or lease a piece of equipment for an upcoming project. The cost to purchase is $10,000 plus $100 per day to operate or $500 per day to lease (including operating costs). If the company anticipates using the equipment for a total of 20 days, they will be indifferent as to whether or lease or purchase it.
Question
A single contract can include all three categories of contracts.
Question
Contents of the procurement management plan vary with project needs.
Question
In an FPI contract, all of the risk is borne by the buyer.
Question
Indirect costs are those costs can be traced back to a project in a cost-effective way.
Question
Project procurement management consists primarily of two processes: assessing procurements and controlling procurements.
Question
In unit pricing, the total value of the contract is a function of the quantities needed to complete the work.
Question
In project procurement management, a main output of the controlling process is a source selection criteria.
Question
Risk registers and stakeholder registers are outputs of the planning procurement process.
Question
If an organization has no need to buy any products or services from outside the organization, then it has no need to perform any of the procurement management processes.
Question
Suppliers are those organizations or individuals who provide procurement services.
Question
All contracts should include specific clauses that take into account issues unique to the project.
Question
While outsourcing, organizations should protect strategic information because it can become vulnerable in the hands of suppliers.
Question
A key factor in evaluating bids, particularly for projects involving information technology, is the past performance record of the bidder.
Question
Make-or-buy analysis involves comparing the internal costs of providing a product with the cost of outsourcing.
Question
_____ contracts involve payment to the supplier for direct and indirect actual costs and often include fees.

A)Firm-fixed-price
B)Lump sum  
C)Cost-reimbursable contracts
D)Fixed-price incentive fee
Question
In project procurement management, the process of _____ involves determining what to procure, when, and how.

A)closing procurements
B)controlling procurements  
C)conducting procurements
D)planning procurement management
Question
"Outsourcing to provide extra workers during periods of peak workloads can be much more economical than trying to fill entire projects with internal resources." Which of the following advantages does this characteristic of outsourcing provide organizations?

A)Offers control over all aspects of projects that suppliers carry out  
B)Provides a company flexibility in staffing  
C)Shifts accountability from external suppliers to internal staff  
D)Helps avoid any form of dependency on suppliers
Question
Outsourcing suppliers can often provide economies of scale, especially for hardware and software, that may not be available to the client alone. Which of the following benefits does this offer an organization?

A)Reduction in fixed and recurrent costs
B)Increased flexibility  
C)Increased accountability
D)Access to specific skills
Question
Outputs of the _____ process consist of selected sellers and resource calendars.

A)closing procurements
B)conducting procurements  
C)planning procurement management
D)controlling procurements
Question
Procurement audits are often done during contract closure to identify lessons learned in the entire procurement process.
Question
In project procurement management, the process of conducting procurements is part of the _____ process.

A)planning
B)executing  
C)monitoring and controlling
D)closing
Question
The closing procurements process involves updating records to reflect final results and archiving information for future use.
Question
The contractual relationship is a legal relationship, which means it is subject to state and federal contract laws.
Question
The procurement statements of work are an output of the _____ process of project procurement management.

A)planning
B)executing  
C)monitoring and controlling
D)closing
Question
A drawback of outsourcing is that:

A)it does not provide access to specific skills or technologies. 
B)it invariably results in an increase in both fixed and recurrent costs. 
C)it can make an organization become overly dependent on particular suppliers. 
D)it cannot increase accountability of suppliers through a written contract.
Question
In project procurement management, an output of the _____ monitoring and controlling process.

A)Change requests
B)Selected sellers  
C)Resource calendars
D)Make-or-buy decisions
Question
The first step in project procurement management is:

A)closing procurement management.
B)controlling procurements. 
C)conducting procurements.
D)planning procurement management.
Question
Which of the following is true of lump-sum contracts?

A)They incur a high degree of risk for the buyer. 
B)They involve a fixed total price for a well-defined product or service. 
C)They consist of a fee based on the satisfaction of subjective performance criteria. 
D)They are also known as cost-reimbursable contracts.
Question
"Most organizations are not in business to provide information technology services, yet many have spent valuable time and resources on information technology functions when they should have instead worked on important competencies such as marketing, customer service, and new product design. Outsourcing helps tackle this problem." Which of the following benefits does outsourcing primarily provide in such a scenario?

A)Reduces fixed and recurrent costs  
B)Protects strategic information from being accessible to external suppliers  
C)Increases accountability even without a written contract  
D)Helps focus on an organization's core business
Question
"A shortage of qualified personnel is one of the main reason that companies outsource. A project may require experts in a particular field for several months and planning for this procurement ensures that the needed services will be available for the project." Which of the following benefits does this characteristic of outsourcing provide an organization?

A)Reduces focus on its core business  
B)Increases control over all aspects of projects that suppliers carry out  
C)Provides access to specific skills  
D)Reduces dependency on suppliers
Question
In project procurement management, the process of _____ involves obtaining seller responses, selecting sellers, and awarding contracts.

A)conducting procurements
B)closing procurements  
C)settling contracts
D)planning procurement management
Question
Which of the following processes of project procurement management involves managing relationships with sellers, monitoring contract performance, and making changes as needed?

A)Closing procurements
B)Settling contracts  
C)Deciding on the services to procure
D)Controlling procurements
Question
In project procurement management, which of the following processes involve completion and settlement of each contract, including resolution of any open items?

A)Planning procurement management
B)Controlling procurements  
C)Closing procurements
D)Conducting procurements
Question
In project procurement management, which of the following is an output of the executing process?

A)Make-or-buy decisions
B)Statements of work  
C)Source selection criteria
D)Resource calendars
Question
In which of the following contracts does the buyer pay the supplier for allowable performance costs along with a predetermined percentage based on total costs?

A)FPIF
B)CPIF  
C)CPPC
D)CPAF
Question
A(n) _____ is a mutually binding agreement that obligates the seller to provide the specified products or services and obligates the buyer to pay for them.
Question
A(n) _____ decision is one in which an organization decides if it is in its best interests to make certain products or perform certain services inside the organization, or if it is better to buy them from an outside organization.
Question
_____ refers to the process of acquiring goods and/or services from an outside source.
Question
_____ management includes the processes required to acquire goods and services for a project from outside the performing organization.
Question
The process of choosing suppliers or sellers is known as _____.

A)source selection
B)a bid  
C)WBS
D)a change order
Question
In project procurement management, which of the following is one of the main outputs of the conducting procurement process?

A)A selected seller
B)A procurement management plan  
C)A procurement statement of work
D)A closed procurement
Question
A(n) _____ contract has the least amount of risk for the buyer.
Question
A(n) _____ is a document used to solicit proposals from prospective suppliers.

A)RFQ
B)WBS  
C)RFP
D)SOW
Question
From the buyer's perspective, the _____ is the least desirable among all contracts because the supplier has no incentive to decrease costs.

A)CPIF
B)CPFF  
C)CPAF
D)CPPC
Question
Procurement statements of work are an output of the _____ process.
Question
Which of the following is an output of the contract closure process?

A)Procurement statements of work
B)Updates to organizational process assets  
C)Resource calendars
D)Work performance information
Question
The cost at which the contractor assumes total responsibility for each additional dollar of contract cost is known as a(n) _____.
Question
A document used to solicit quotes or bids from prospective suppliers is known as a(n) _____.

A)RFQ
B)RFP  
C)WBS
D)SOW
Question
The _____ is a description of the work required for a procurement.

A)RFQ
B)RFP  
C)WBS
D)SOW
Question
With a(n) _____ contract, the buyer pays the supplier for allowable performance costs plus a fixed fee payment usually based on a percentage of estimated costs.

A)CPFF
B)FPIF  
C)CPAF
D)CPIF
Question
In a(n) _____ contract, the buyer pays the supplier for allowable performance costs along with a predetermined fee and an incentive bonus.

A)FFP
B)CPIF  
C)CPPC
D)FPIF
Question
A(n) _____ contract includes a special provision for predefined final adjustments to the contract price due to changes in conditions such as inflation.
Question
A(n) _____ contract carries the least risk for suppliers.

A)CPPC
B)FFP  
C)CPAF
D)FP-EPA
Question
After planning for procurement management, which of the following does the next process involve?

A)Determining the evaluation criteria for the contract award  
B)Developing procurement statements of work  
C)Using expert judgement in planning?purchases and acquisitions  
D)Sending appropriate documentation to potential sellers
Question
A(n)_____ conference helps ensure that everyone has a clear, common understanding of the buyer's desired products or services.
Question
In procurement management, evaluation of any change should include a(n) _____ analysis.
Question
What are the four types of cost-reimbursable contracts? Briefly describe each type.
Question
_____ contracts are a hybrid of fixed-price and cost-reimbursable contracts.
Question
Three types of cost-reimbursable contracts include cost plus incentive fee, cost plus fixed fee, and _____.
Question
All procurement documents should be in _____ form in order to facilitate accurate and complete responses from prospective sellers.
Question
The final process in project procurement management is _____.
Question
The process of source selection involves evaluating proposals from sellers, choosing the best one, negotiating, and awarding the _____.
Question
If an SOW is used as part of a contract to describe only the work required for that particular contract, it is called a(n) _____.
Question
A(n) _____ system provides the ability to easily organize, find, and archive procurement-related documents.
Question
A(n) _____ is also known as a tender or quote, short for quotation.
Question
A(n) _____ type of e-procurement that sends requests for information and prices to suppliers and receives the response of suppliers using Internet technology.
Question
A contract statement of work is a type of _____ statement that describes the work in sufficient detail to allow prospective suppliers to determine if they can provide the required goods and services and to determine an appropriate price.
Question
A(n) _____ is a contract clause that allows the buyer or supplier to end the contract.
Question
A(n) _____ is a document prepared by a seller when there are different approaches for meeting buyer needs.
Question
List and briefly describe the four main processes of project procurement management.
Question
_____ are oral or written acts or omissions by someone with actual or apparent authority that can be construed to have the same effect as a written change order.
Question
A(n) _____ type of e-procurement that Identifies new suppliers for a specific category of purchasing requirements using Internet technology.
Question
What are some of the advantages that outsourcing offers which is encouraging many companies to adopt it?
Question
Tools used in contract closure include procurement audits, _____, and a records management system.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/83
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 12: Project Procurement Management
1
Buyers absorb lesser risk with cost-reimbursable contracts than they do with fixed-price contracts.
False
Explanation: Cost-reimbursable contracts often include fees, such as a profit percentage or incentives for meeting or exceeding selected project objectives. Buyer absorb more of the risk with cost-reimbursable contracts than they do with fixed-price contracts.
2
Reviewing performance records reduces the risk of selecting a supplier with a poor track record.
True
Explanation: A key factor in evaluating bids, particularly for projects involving IT, is the past performance record of the bidder. Reviewing performance records and references reduces the risk of selecting a supplier with a poor track record.
3
The main sections of an RFP can include the statement of work and schedule information.
True
Explanation: The main sections of an RFP usually include its statement of purpose, background information on the organization issuing the RFP, the basic requirements for the products and services being proposed, and the hardware and software environment.
4
The fee in a CPFF contract constantly varies even when the scope of a contract remains the same.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
5
An FP-EPA contract carries the least risk for a supplier.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
6
A company is considering whether to purchase or lease a piece of equipment for an upcoming project. The cost to purchase is $10,000 plus $100 per day to operate or $500 per day to lease (including operating costs). If the company anticipates using the equipment for a total of 20 days, they will be indifferent as to whether or lease or purchase it.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
7
A single contract can include all three categories of contracts.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
8
Contents of the procurement management plan vary with project needs.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
9
In an FPI contract, all of the risk is borne by the buyer.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
10
Indirect costs are those costs can be traced back to a project in a cost-effective way.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
11
Project procurement management consists primarily of two processes: assessing procurements and controlling procurements.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
12
In unit pricing, the total value of the contract is a function of the quantities needed to complete the work.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
13
In project procurement management, a main output of the controlling process is a source selection criteria.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
14
Risk registers and stakeholder registers are outputs of the planning procurement process.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
15
If an organization has no need to buy any products or services from outside the organization, then it has no need to perform any of the procurement management processes.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
16
Suppliers are those organizations or individuals who provide procurement services.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
17
All contracts should include specific clauses that take into account issues unique to the project.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
18
While outsourcing, organizations should protect strategic information because it can become vulnerable in the hands of suppliers.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
19
A key factor in evaluating bids, particularly for projects involving information technology, is the past performance record of the bidder.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
20
Make-or-buy analysis involves comparing the internal costs of providing a product with the cost of outsourcing.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
21
_____ contracts involve payment to the supplier for direct and indirect actual costs and often include fees.

A)Firm-fixed-price
B)Lump sum  
C)Cost-reimbursable contracts
D)Fixed-price incentive fee
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
22
In project procurement management, the process of _____ involves determining what to procure, when, and how.

A)closing procurements
B)controlling procurements  
C)conducting procurements
D)planning procurement management
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
23
"Outsourcing to provide extra workers during periods of peak workloads can be much more economical than trying to fill entire projects with internal resources." Which of the following advantages does this characteristic of outsourcing provide organizations?

A)Offers control over all aspects of projects that suppliers carry out  
B)Provides a company flexibility in staffing  
C)Shifts accountability from external suppliers to internal staff  
D)Helps avoid any form of dependency on suppliers
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
24
Outsourcing suppliers can often provide economies of scale, especially for hardware and software, that may not be available to the client alone. Which of the following benefits does this offer an organization?

A)Reduction in fixed and recurrent costs
B)Increased flexibility  
C)Increased accountability
D)Access to specific skills
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
25
Outputs of the _____ process consist of selected sellers and resource calendars.

A)closing procurements
B)conducting procurements  
C)planning procurement management
D)controlling procurements
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
26
Procurement audits are often done during contract closure to identify lessons learned in the entire procurement process.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
27
In project procurement management, the process of conducting procurements is part of the _____ process.

A)planning
B)executing  
C)monitoring and controlling
D)closing
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
28
The closing procurements process involves updating records to reflect final results and archiving information for future use.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
29
The contractual relationship is a legal relationship, which means it is subject to state and federal contract laws.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
30
The procurement statements of work are an output of the _____ process of project procurement management.

A)planning
B)executing  
C)monitoring and controlling
D)closing
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
31
A drawback of outsourcing is that:

A)it does not provide access to specific skills or technologies. 
B)it invariably results in an increase in both fixed and recurrent costs. 
C)it can make an organization become overly dependent on particular suppliers. 
D)it cannot increase accountability of suppliers through a written contract.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
32
In project procurement management, an output of the _____ monitoring and controlling process.

A)Change requests
B)Selected sellers  
C)Resource calendars
D)Make-or-buy decisions
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
33
The first step in project procurement management is:

A)closing procurement management.
B)controlling procurements. 
C)conducting procurements.
D)planning procurement management.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
34
Which of the following is true of lump-sum contracts?

A)They incur a high degree of risk for the buyer. 
B)They involve a fixed total price for a well-defined product or service. 
C)They consist of a fee based on the satisfaction of subjective performance criteria. 
D)They are also known as cost-reimbursable contracts.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
35
"Most organizations are not in business to provide information technology services, yet many have spent valuable time and resources on information technology functions when they should have instead worked on important competencies such as marketing, customer service, and new product design. Outsourcing helps tackle this problem." Which of the following benefits does outsourcing primarily provide in such a scenario?

A)Reduces fixed and recurrent costs  
B)Protects strategic information from being accessible to external suppliers  
C)Increases accountability even without a written contract  
D)Helps focus on an organization's core business
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
36
"A shortage of qualified personnel is one of the main reason that companies outsource. A project may require experts in a particular field for several months and planning for this procurement ensures that the needed services will be available for the project." Which of the following benefits does this characteristic of outsourcing provide an organization?

A)Reduces focus on its core business  
B)Increases control over all aspects of projects that suppliers carry out  
C)Provides access to specific skills  
D)Reduces dependency on suppliers
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
37
In project procurement management, the process of _____ involves obtaining seller responses, selecting sellers, and awarding contracts.

A)conducting procurements
B)closing procurements  
C)settling contracts
D)planning procurement management
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
38
Which of the following processes of project procurement management involves managing relationships with sellers, monitoring contract performance, and making changes as needed?

A)Closing procurements
B)Settling contracts  
C)Deciding on the services to procure
D)Controlling procurements
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
39
In project procurement management, which of the following processes involve completion and settlement of each contract, including resolution of any open items?

A)Planning procurement management
B)Controlling procurements  
C)Closing procurements
D)Conducting procurements
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
40
In project procurement management, which of the following is an output of the executing process?

A)Make-or-buy decisions
B)Statements of work  
C)Source selection criteria
D)Resource calendars
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
41
In which of the following contracts does the buyer pay the supplier for allowable performance costs along with a predetermined percentage based on total costs?

A)FPIF
B)CPIF  
C)CPPC
D)CPAF
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
42
A(n) _____ is a mutually binding agreement that obligates the seller to provide the specified products or services and obligates the buyer to pay for them.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
43
A(n) _____ decision is one in which an organization decides if it is in its best interests to make certain products or perform certain services inside the organization, or if it is better to buy them from an outside organization.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
44
_____ refers to the process of acquiring goods and/or services from an outside source.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
45
_____ management includes the processes required to acquire goods and services for a project from outside the performing organization.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
46
The process of choosing suppliers or sellers is known as _____.

A)source selection
B)a bid  
C)WBS
D)a change order
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
47
In project procurement management, which of the following is one of the main outputs of the conducting procurement process?

A)A selected seller
B)A procurement management plan  
C)A procurement statement of work
D)A closed procurement
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
48
A(n) _____ contract has the least amount of risk for the buyer.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
49
A(n) _____ is a document used to solicit proposals from prospective suppliers.

A)RFQ
B)WBS  
C)RFP
D)SOW
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
50
From the buyer's perspective, the _____ is the least desirable among all contracts because the supplier has no incentive to decrease costs.

A)CPIF
B)CPFF  
C)CPAF
D)CPPC
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
51
Procurement statements of work are an output of the _____ process.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
52
Which of the following is an output of the contract closure process?

A)Procurement statements of work
B)Updates to organizational process assets  
C)Resource calendars
D)Work performance information
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
53
The cost at which the contractor assumes total responsibility for each additional dollar of contract cost is known as a(n) _____.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
54
A document used to solicit quotes or bids from prospective suppliers is known as a(n) _____.

A)RFQ
B)RFP  
C)WBS
D)SOW
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
55
The _____ is a description of the work required for a procurement.

A)RFQ
B)RFP  
C)WBS
D)SOW
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
56
With a(n) _____ contract, the buyer pays the supplier for allowable performance costs plus a fixed fee payment usually based on a percentage of estimated costs.

A)CPFF
B)FPIF  
C)CPAF
D)CPIF
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
57
In a(n) _____ contract, the buyer pays the supplier for allowable performance costs along with a predetermined fee and an incentive bonus.

A)FFP
B)CPIF  
C)CPPC
D)FPIF
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
58
A(n) _____ contract includes a special provision for predefined final adjustments to the contract price due to changes in conditions such as inflation.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
59
A(n) _____ contract carries the least risk for suppliers.

A)CPPC
B)FFP  
C)CPAF
D)FP-EPA
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
60
After planning for procurement management, which of the following does the next process involve?

A)Determining the evaluation criteria for the contract award  
B)Developing procurement statements of work  
C)Using expert judgement in planning?purchases and acquisitions  
D)Sending appropriate documentation to potential sellers
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
61
A(n)_____ conference helps ensure that everyone has a clear, common understanding of the buyer's desired products or services.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
62
In procurement management, evaluation of any change should include a(n) _____ analysis.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
63
What are the four types of cost-reimbursable contracts? Briefly describe each type.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
64
_____ contracts are a hybrid of fixed-price and cost-reimbursable contracts.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
65
Three types of cost-reimbursable contracts include cost plus incentive fee, cost plus fixed fee, and _____.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
66
All procurement documents should be in _____ form in order to facilitate accurate and complete responses from prospective sellers.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
67
The final process in project procurement management is _____.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
68
The process of source selection involves evaluating proposals from sellers, choosing the best one, negotiating, and awarding the _____.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
69
If an SOW is used as part of a contract to describe only the work required for that particular contract, it is called a(n) _____.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
70
A(n) _____ system provides the ability to easily organize, find, and archive procurement-related documents.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
71
A(n) _____ is also known as a tender or quote, short for quotation.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
72
A(n) _____ type of e-procurement that sends requests for information and prices to suppliers and receives the response of suppliers using Internet technology.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
73
A contract statement of work is a type of _____ statement that describes the work in sufficient detail to allow prospective suppliers to determine if they can provide the required goods and services and to determine an appropriate price.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
74
A(n) _____ is a contract clause that allows the buyer or supplier to end the contract.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
75
A(n) _____ is a document prepared by a seller when there are different approaches for meeting buyer needs.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
76
List and briefly describe the four main processes of project procurement management.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
77
_____ are oral or written acts or omissions by someone with actual or apparent authority that can be construed to have the same effect as a written change order.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
78
A(n) _____ type of e-procurement that Identifies new suppliers for a specific category of purchasing requirements using Internet technology.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
79
What are some of the advantages that outsourcing offers which is encouraging many companies to adopt it?
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
80
Tools used in contract closure include procurement audits, _____, and a records management system.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 83 flashcards in this deck.