Deck 3: The Project Management Process Groups: A Case Study
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/83
Play
Full screen (f)
Deck 3: The Project Management Process Groups: A Case Study
1
Key outcomes of the executing process group are formal acceptance of the work and creation of closing documents.
False
Explanation: Key outcomes of the closing process group are formal acceptance of the work and creation of closing documents, such as a final project report and lessons-learned report.
Explanation: Key outcomes of the closing process group are formal acceptance of the work and creation of closing documents, such as a final project report and lessons-learned report.
2
The kick-off meeting is always held before the business case and project charter are completed.
False
Explanation: A kick-off meeting is a meeting held at the beginning of a project so that stakeholders can meet each other, review the goals of the project, and discuss future plans. The kick-off meeting is often held after the business case and project charter are completed, but it could be held sooner, as needed.
Explanation: A kick-off meeting is a meeting held at the beginning of a project so that stakeholders can meet each other, review the goals of the project, and discuss future plans. The kick-off meeting is often held after the business case and project charter are completed, but it could be held sooner, as needed.
3
The executing process group generally requires the most resources.
True
Explanation: The executing process group takes the actions necessary to complete the work described in the planning activities. It should overlap the other process groups, and generally requires the most resources.
Explanation: The executing process group takes the actions necessary to complete the work described in the planning activities. It should overlap the other process groups, and generally requires the most resources.
4
Agile methods comprise of 45 subprocesses which are organized into eight process groups.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
5
The DMAIC (Define, Measure, Analyze, Improve, and Control) methodology of the Six Sigma projects, is used to improve an existing business process.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
6
A milestone list is an output associated with the Project Scope Management knowledge area.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
7
The WBS provides a basis for creating the project schedule and performing earned value management for measuring and forecasting project performance.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
8
Initiating and closing tasks are usually the longest and require the most amount of resources and time.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
9
Project initiation involves taking the actions necessary to ensure that activities in the project plan are completed.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
10
Decisions and actions taken in one knowledge area at a certain time rarely affect other knowledge areas.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
11
The level of activity and length of each process group varies for every project.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
12
Initiating processes take place during each phase of a project.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
13
Identifying the project sponsor is a pre-initiation task.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
14
The output of the stakeholder management strategy results is a project charter.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
15
Initiating processes are not required to end a project.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
16
Monitoring and controlling processes overlap all of the other project management process groups.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
17
The Rational Unified Process (RUP) framework is incompatible with the PMBOK process.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
18
Details of kick-off meetings and the stakeholder details are usually recorded in a Word document.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
19
An organization's project management plan expresses the vision, mission, goals, objectives, and strategies of the organization.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
20
Many project management activities occur as part of the planning process group.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
21
_____ processes include devising and maintaining a workable scheme to ensure that the project addresses the organization's needs.
A)Initiating
B)Planning
C)Executing
D)Monitoring and controlling
A)Initiating
B)Planning
C)Executing
D)Monitoring and controlling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
22
A common _____ process is reporting performance, where project stakeholders can identify any necessary changes that may be required to keep the project on track.
A)executing
B)closing
C)monitoring and controlling
D)planning
A)executing
B)closing
C)monitoring and controlling
D)planning
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
23
The project time management knowledge area maps to the _____ process group through the activity of schedule control.
A)initiating
B)planning
C)executing
D)monitoring and controlling
A)initiating
B)planning
C)executing
D)monitoring and controlling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
24
_____ processes include defining and authorizing a project or project phase.
A)Initiating
B)Planning
C)Executing
D)Monitoring and controlling
A)Initiating
B)Planning
C)Executing
D)Monitoring and controlling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
25
Administrative activities, such as archiving project files, closing out contracts, documenting lessons learned, and receiving formal acceptance of the delivered work as part of the phase or project, are often involved in _____ processes.
A)monitoring and controlling
B)executing
C)initiating
D)closing
A)monitoring and controlling
B)executing
C)initiating
D)closing
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
26
The project integration management knowledge area maps to the _____ process group through the activities of developing project charters.
A)initiating
B)planning
C)executing
D)monitoring and controlling
A)initiating
B)planning
C)executing
D)monitoring and controlling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
27
The project scope management knowledge area maps to the _____ process group through the activities of scope validation and scope control.
A)initiating
B)planning
C)executing
D)monitoring and controlling
A)initiating
B)planning
C)executing
D)monitoring and controlling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
28
In the Scrum method, team members work as a self-directed group coached by the ScrumMaster.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
29
Which of the following is a pre-initiation task?
A)Drawing up a work breakdown structure
B)Developing a business case for a project
C)Drafting the project charter
D)Identifying stakeholders
A)Drawing up a work breakdown structure
B)Developing a business case for a project
C)Drafting the project charter
D)Identifying stakeholders
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
30
The two main items for monitoring and controlling in the Scrum framework are the daily?Scrum and the sprint retrospectives.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
31
Examples of _____ processes include acquiring and developing the project team, performing quality assurance, distributing information, managing stakeholder expectations, and conducting procurements.
A)monitoring and controlling
B)executing
C)planning
D)initiating
A)monitoring and controlling
B)executing
C)planning
D)initiating
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
32
The burndown chart is a Scrum created artifact that provides a list of features prioritized by business value.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
33
_____ is a planning process that is within the Project Scope Management knowledge area.
A)Schedule development
B)Developing a project management plan
C)Creation of a WBS
D)Quality planning
A)Schedule development
B)Developing a project management plan
C)Creation of a WBS
D)Quality planning
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
34
_____ is an iterative software development process that focuses on team productivity and delivers software best practices to all team members.
A)Agile Unified Process
B)Dynamic Systems Development Method
C)Rational Unified Process
D)Six Sigma
A)Agile Unified Process
B)Dynamic Systems Development Method
C)Rational Unified Process
D)Six Sigma
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
35
During _____ processes for a new project, the organization recognizes that a new project exists, and completes a project charter as part of this recognition.
A)initiating
B)planning
C)opening
D)controlling
A)initiating
B)planning
C)opening
D)controlling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
36
The pre-initiation phase of a project using the Scrum method does not involve project charters, stakeholder management strategy, and kick-off meetings.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
37
The project cost management knowledge area maps to the _____ process group through the activities of estimating costs and budget determination.
A)initiating
B)planning
C)executing
D)monitoring and controlling
A)initiating
B)planning
C)executing
D)monitoring and controlling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
38
Developing a _____ is a planning process that occurs in the Project Integration Management knowledge area.
A)schedule management plan
B)project management plan
C)WBS
D)quality management
A)schedule management plan
B)project management plan
C)WBS
D)quality management
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
39
The project stakeholder management knowledge area maps to the ______ process group by identifying stakeholders.
A)initiating
B)planning
C)executing
D)monitoring and controlling
A)initiating
B)planning
C)executing
D)monitoring and controlling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
40
A sprint review is a meeting in which the team demonstrates to the product owner what it has completed during the sprint.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
41
The ideal outcome of the _____ process group is to complete a project successfully by delivering the agreed-upon project scope within time, cost, and quality constraints.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
42
One of the main outputs of the initiation process is _____.
A)creating the work breakdown structure
B)selecting the project manager
C)developing the project charter
D)identifying the project sponsor
A)creating the work breakdown structure
B)selecting the project manager
C)developing the project charter
D)identifying the project sponsor
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
43
The main purpose of project plans is to
A)schedule management plans
B)define project scope
C)estimate activity resources
D)guide project execution
A)schedule management plans
B)define project scope
C)estimate activity resources
D)guide project execution
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
44
The project management plan is the output of the planning process of project _____.
A)integration management
B)quality management
C)scope management
D)procurement management
A)integration management
B)quality management
C)scope management
D)procurement management
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
45
Which of the following is true about the agile method?
A)It is often used when a project team can express the scope early in the product life cycle.
B)It is used when a project team wants to provide a potentially shippable product earlier rather than later.
C)It uses several iterations or deliveries of software instead of waiting until the end of the project to provide a product.
D)It is used when project teams want to use the predicative approach to a project.
A)It is often used when a project team can express the scope early in the product life cycle.
B)It is used when a project team wants to provide a potentially shippable product earlier rather than later.
C)It uses several iterations or deliveries of software instead of waiting until the end of the project to provide a product.
D)It is used when project teams want to use the predicative approach to a project.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
46
Which of the following project parameters would be compatible with the use of the agile approach?
A)Projects with inexperienced and dispersed teams
B)Projects that have a fairly rigid completion date
C)Projects with clear-up front requirements
D)Projects that have more flexible scheduling
A)Projects with inexperienced and dispersed teams
B)Projects that have a fairly rigid completion date
C)Projects with clear-up front requirements
D)Projects that have more flexible scheduling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
47
Which of the following activities is a part of the planning process of the Scrum?
A)Determining how many sprints will compose each release
B)Demonstrating the product during a sprint review meeting
C)Completing tasks each day during sprints
D)Creating sprint backlog
A)Determining how many sprints will compose each release
B)Demonstrating the product during a sprint review meeting
C)Completing tasks each day during sprints
D)Creating sprint backlog
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
48
The _____ process involves gaining stakeholder and customer acceptance of the final products and services and bringing the project, or project phase, to an orderly end.
A)executing
B)closing
C)planning
D)monitoring
A)executing
B)closing
C)planning
D)monitoring
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
49
The _____ provides a basis for creating the project schedule and performing earned value management for measuring and forecasting project performance.
A)scope statement
B)cost management plan
C)work breakdown structure
D)project charter
A)scope statement
B)cost management plan
C)work breakdown structure
D)project charter
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
50
The most difficult and unappreciated process in project management is often
A)initiating
B)planning
C)executing
D)monitoring and controlling
A)initiating
B)planning
C)executing
D)monitoring and controlling
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
51
A _____ is usually not necessary to the Scrum method.
A)team contract
B)velocity estimate
C)Gantt chart
D)product backlog
A)team contract
B)velocity estimate
C)Gantt chart
D)product backlog
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
52
_____ progress from initiation activities to planning activities, executing activities, monitoring and controlling activities, and closing activities.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
53
A(n)_____ is a series of actions directed toward a particular result.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
54
_____ are an output of the executing process of project integration management.
A)Deliverables
B)Issue logs
C)Resource calendars
D)Enterprise environmental factor updates
A)Deliverables
B)Issue logs
C)Resource calendars
D)Enterprise environmental factor updates
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
55
Organizational process assets update is the output of the closing process of _____.
A)project integration management
B)project quality management
C)project procurement management
D)project time management
A)project integration management
B)project quality management
C)project procurement management
D)project time management
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
56
_____ includes measuring progress toward project objectives and taking corrective action to match progress with the plan.
A)Planning
B)Montioring and controlling
C)Executing
D)Initiating
A)Planning
B)Montioring and controlling
C)Executing
D)Initiating
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
57
Enterprise environmental factors are an output of the executing process of _____.
A)project integration management
B)project quality management
C)project human resource management
D)project procurement management
A)project integration management
B)project quality management
C)project human resource management
D)project procurement management
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
58
Which of the following is a planning process associated with project scope management?
A)Collecting requirements
B)Performing qualitative risk analysis
C)Planning schedule management
D)Estimating costs
A)Collecting requirements
B)Performing qualitative risk analysis
C)Planning schedule management
D)Estimating costs
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
59
The improvement of the product and process in the Scrum method is discussed at the _____.
A)sprint reflection meeting
B)sprint review meeting
C)kick-off meeting
D)daily Scrum meeting
A)sprint reflection meeting
B)sprint review meeting
C)kick-off meeting
D)daily Scrum meeting
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
60
A _____ is an important Scrum artifact used to graphically display progress on each sprint during the monitoring and controlling process.
A)WBS
B)sprint backlog
C)burndown chart
D)product backlog
A)WBS
B)sprint backlog
C)burndown chart
D)product backlog
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
61
_____ are short descriptions written by customers of what they need a Scrum system to do for them.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
62
A(n) _____ is a Scrum artifact and consists of the highest-priority items from the product backlog to be completed in a sprint.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
63
List and describe the five process management groups.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
64
_____ are people involved in or affected by project activities and include the project sponsor, project team, support staff, customers, users, suppliers, and even opponents to the project.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
65
A(n) _____ is a meeting held at the beginning of a project so that stakeholders can meet each other, review the goals of the project, and discuss future plans.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
66
If done well, the _________ can produce several releases of useful software.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
67
A(n) _____ is a cross-functional team of five to nine people who organize themselves and the work to produce the desired results for each sprint.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
68
A(n) _____ is the person responsible for the business value of the project and for deciding what work to do and in what order when using a Scrum method.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
69
The most time and money should be spent on
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
70
_________ issues often occur during project execution, especially conflicts.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
71
_____ the project includes work required to introduce any new hardware, software, and procedures into normal operations.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
72
The _____ is a very important tool in project management because it provides the basis for deciding how to do the work.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
73
A risk register is the output of _____.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
74
What is a methodology and what are some methodologies other than the PMBOK Guide do organizations use as a basis for project management methodology?
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
75
_____ is a project management methodology that defines 45 separate subprocesses and organizes these into eight process groups.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
76
A(n) _____ describes how things should be done.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
77
A(n) _____ is a set period of time, normally two to four weeks, during which specific work must be completed and made ready for review when using Scrum methods.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
78
In Scrum, a(n) _____ is a useful object created by people.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
79
A(n) _____ is a document that includes stakeholders' roles, names, organizations, and contact information.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
80
A(n) _____ is the person who ensures that the team is productive, facilitates the daily Scrum, enables close cooperation across all roles and functions, and removes barriers that prevent the team from being effective.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck