Deck 28: Systems Development Project Management

Full screen (f)
exit full mode
Question
In the context of a systems development project,which of the following statements is true of the relationships between requirements,cost,and time?

A)Increasing the time for the completion of a project always increases the cost of the project.
B)Increasing the cost of a project will always reduce the time required to finish the project.
C)Reducing the requirements in a project rarely affects the time required to finish the project.
D)Reducing the number of requirements in a project reduces the overall cost of the project.
Use Space or
up arrow
down arrow
to flip the card.
Question
The development of large-scale systems can involve the integration of products and services from different companies.
Question
The Project Management Body of Knowledge (PMBOK®)Guide identifies those practices that are known to be effective for different situations and briefly describes their use.
Question
What are the trade-offs in a systems development project's requirements,cost,and time?
Question
________ is a knowledge area that concerns the methods,media,and schedules for exchanging information with the project's sponsors within a team and with others who have an interest in the progress of the project.

A)Procurement management
B)Communications management
C)Quality management
D)Project integration
Question
Which of the following statements is true of large-scale systems development projects?

A)They use simple computer programs to ensure consistency and speed in development.
B)They use development teams of less than 20 members to reduce complexity.
C)Their development involves the integration of services from several companies.
D)Their development is carried out in a single site to ensure consistency.
Question
Increasing the cost of a project can reduce the time required to complete the project up to a certain point,beyond which,the time required would increase due to ________.

A)economies of scale
B)diseconomies of scale
C)economies of scope
D)diseconomies of scope
Question
________ is a knowledge area that concerns contracts with outside vendors for services,materials,and outsourcing of functions.

A)Communications management
B)Quality management
C)Project integration
D)Procurement management
Question
Which of the following is a characteristic of large-scale systems development projects?

A)short development intervals
B)single development site
C)avoidance of system localization
D)50-100 development team members
Question
Knowledge areas of the Project Management Body of Knowledge (PMBOK®)Guide refer to the factors in a project that need to be managed throughout the life of the project.
Question
________ is the knowledge area that refers to the management of an entire project and the construction of the final product.

A)Project integration
B)Project management
C)Procurement management
D)Quality management
Question
Large-scale systems development requires extended development intervals as long as 5 or 6 years.
Question
The time involved in a project can always be reduced by increasing cost.
Question
Systems development projects require the balancing of three critical drivers: requirements,cost,and ________.

A)scope
B)time
C)performance
D)value
Question
What is the Project Management Body of Knowledge (PMBOK®)Guide for project management?
Question
A plan that stipulates the tasks to be accomplished in a project,the labor and other resources assigned to those tasks,and the schedule for completion of the project is called the ________.

A)baseline
B)data model
C)line of code
D)scatter plot
Question
In the Project Management Body of Knowledge (PMBOK®)Guide,the different stages in the life of a project are referred to as ________.

A)configuration controls
B)knowledge areas
C)process groups
D)resource zones
Question
Larger projects with longer development intervals will find it easier to meet baseline requirements.
Question
What are the characteristics of information systems (IS)in large-scale systems development projects?
Question
Which of the following is a technique that stipulates phases and processes for constructing information systems (IS)but does not address the management of large-scale projects?

A)systems development life cycle
B)rapid application development
C)agile software development
D)structured system analysis
Question
The smaller and shorter a project,the greater the chance of disruption due to unanticipated events.
Question
The critical path is a hierarchy of the tasks required to complete a project.
Question
In case of task dependencies in a project,all tasks must begin and end at the same time.
Question
A loss of control over a project's configuration is usually negligible and not so expensive to fix.
Question
What is a critical path? How is a critical path analysis done?
Question
A(n)________ is the sequence of activities that determine the earliest date by which a project can be completed.

A)Gantt chart
B)critical path
C)encryption algorithm
D)scatter plot
Question
________ refers to a set of management policies,practices,and tools that developers use to maintain control over a project's resources.

A)Perceptual mapping
B)Coordination control
C)Critical path analysis
D)Configuration control
Question
The biggest challenge in planning large-scale systems development is scheduling.Describe the three approaches that organizations can take to address this challenge.
Question
Each task in a systems development project should culminate in one or more ________.

A)deliverables
B)zones
C)segments
D)designs
Question
A well-managed project will never face problems of diseconomies of scale.
Question
Which of the following tools shows the tasks,dates,and dependencies in a project?

A)Gantt chart
B)exception report
C)push report
D)DPlot
Question
Which of the following activities is the biggest challenge in planning systems development?

A)creating
B)scheduling
C)analyzing
D)testing
Question
A ________ defines the boundaries of a system in a work breakdown structure (WBS).

A)trade-off
B)code
C)scope
D)scale
Question
Prototypes are examples of deliverables in a systems development project.
Question
A function point is a feature or function of a new program.
Question
The challenges of managing large-scale systems development projects arise from ________.

A)economies of scale
B)economies of scope
C)increase in configuration control
D)lack of coordination
Question
Scheduling a large-scale project is more difficult than scheduling individual projects.
Question
A(n)________ is a hierarchy of the tasks required to complete a project.

A)scatter plot
B)work breakdown structure
C)encryption algorithm
D)virtual model
Question
One approach businesses take to address scheduling challenges in large-scale systems is avoiding the development of software in-house.
Question
Baseline work breakdown structures can be used for monitoring a project.
Question
Taking responsibility for requirements is the single most important task a user can perform for a large-scale development project.
Question
Requirements creep is the process by which a project manager reduces his or her responsibilities for requirements through miniscule rollbacks.
Question
________ is the process by which users agree to one set of conditions,then add a bit more,then add a bit more,and so forth.

A)Requirements creep
B)Diseconomies of scale
C)Configuration control
D)Coordination
Question
What are the biggest challenges for managing a large-scale systems development project?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/44
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 28: Systems Development Project Management
1
In the context of a systems development project,which of the following statements is true of the relationships between requirements,cost,and time?

A)Increasing the time for the completion of a project always increases the cost of the project.
B)Increasing the cost of a project will always reduce the time required to finish the project.
C)Reducing the requirements in a project rarely affects the time required to finish the project.
D)Reducing the number of requirements in a project reduces the overall cost of the project.
D
2
The development of large-scale systems can involve the integration of products and services from different companies.
True
3
The Project Management Body of Knowledge (PMBOK®)Guide identifies those practices that are known to be effective for different situations and briefly describes their use.
True
4
What are the trade-offs in a systems development project's requirements,cost,and time?
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
5
________ is a knowledge area that concerns the methods,media,and schedules for exchanging information with the project's sponsors within a team and with others who have an interest in the progress of the project.

A)Procurement management
B)Communications management
C)Quality management
D)Project integration
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
6
Which of the following statements is true of large-scale systems development projects?

A)They use simple computer programs to ensure consistency and speed in development.
B)They use development teams of less than 20 members to reduce complexity.
C)Their development involves the integration of services from several companies.
D)Their development is carried out in a single site to ensure consistency.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
7
Increasing the cost of a project can reduce the time required to complete the project up to a certain point,beyond which,the time required would increase due to ________.

A)economies of scale
B)diseconomies of scale
C)economies of scope
D)diseconomies of scope
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
8
________ is a knowledge area that concerns contracts with outside vendors for services,materials,and outsourcing of functions.

A)Communications management
B)Quality management
C)Project integration
D)Procurement management
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
9
Which of the following is a characteristic of large-scale systems development projects?

A)short development intervals
B)single development site
C)avoidance of system localization
D)50-100 development team members
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
10
Knowledge areas of the Project Management Body of Knowledge (PMBOK®)Guide refer to the factors in a project that need to be managed throughout the life of the project.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
11
________ is the knowledge area that refers to the management of an entire project and the construction of the final product.

A)Project integration
B)Project management
C)Procurement management
D)Quality management
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
12
Large-scale systems development requires extended development intervals as long as 5 or 6 years.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
13
The time involved in a project can always be reduced by increasing cost.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
14
Systems development projects require the balancing of three critical drivers: requirements,cost,and ________.

A)scope
B)time
C)performance
D)value
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
15
What is the Project Management Body of Knowledge (PMBOK®)Guide for project management?
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
16
A plan that stipulates the tasks to be accomplished in a project,the labor and other resources assigned to those tasks,and the schedule for completion of the project is called the ________.

A)baseline
B)data model
C)line of code
D)scatter plot
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
17
In the Project Management Body of Knowledge (PMBOK®)Guide,the different stages in the life of a project are referred to as ________.

A)configuration controls
B)knowledge areas
C)process groups
D)resource zones
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
18
Larger projects with longer development intervals will find it easier to meet baseline requirements.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
19
What are the characteristics of information systems (IS)in large-scale systems development projects?
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
20
Which of the following is a technique that stipulates phases and processes for constructing information systems (IS)but does not address the management of large-scale projects?

A)systems development life cycle
B)rapid application development
C)agile software development
D)structured system analysis
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
21
The smaller and shorter a project,the greater the chance of disruption due to unanticipated events.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
22
The critical path is a hierarchy of the tasks required to complete a project.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
23
In case of task dependencies in a project,all tasks must begin and end at the same time.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
24
A loss of control over a project's configuration is usually negligible and not so expensive to fix.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
25
What is a critical path? How is a critical path analysis done?
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
26
A(n)________ is the sequence of activities that determine the earliest date by which a project can be completed.

A)Gantt chart
B)critical path
C)encryption algorithm
D)scatter plot
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
27
________ refers to a set of management policies,practices,and tools that developers use to maintain control over a project's resources.

A)Perceptual mapping
B)Coordination control
C)Critical path analysis
D)Configuration control
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
28
The biggest challenge in planning large-scale systems development is scheduling.Describe the three approaches that organizations can take to address this challenge.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
29
Each task in a systems development project should culminate in one or more ________.

A)deliverables
B)zones
C)segments
D)designs
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
30
A well-managed project will never face problems of diseconomies of scale.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
31
Which of the following tools shows the tasks,dates,and dependencies in a project?

A)Gantt chart
B)exception report
C)push report
D)DPlot
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
32
Which of the following activities is the biggest challenge in planning systems development?

A)creating
B)scheduling
C)analyzing
D)testing
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
33
A ________ defines the boundaries of a system in a work breakdown structure (WBS).

A)trade-off
B)code
C)scope
D)scale
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
34
Prototypes are examples of deliverables in a systems development project.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
35
A function point is a feature or function of a new program.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
36
The challenges of managing large-scale systems development projects arise from ________.

A)economies of scale
B)economies of scope
C)increase in configuration control
D)lack of coordination
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
37
Scheduling a large-scale project is more difficult than scheduling individual projects.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
38
A(n)________ is a hierarchy of the tasks required to complete a project.

A)scatter plot
B)work breakdown structure
C)encryption algorithm
D)virtual model
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
39
One approach businesses take to address scheduling challenges in large-scale systems is avoiding the development of software in-house.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
40
Baseline work breakdown structures can be used for monitoring a project.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
41
Taking responsibility for requirements is the single most important task a user can perform for a large-scale development project.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
42
Requirements creep is the process by which a project manager reduces his or her responsibilities for requirements through miniscule rollbacks.
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
43
________ is the process by which users agree to one set of conditions,then add a bit more,then add a bit more,and so forth.

A)Requirements creep
B)Diseconomies of scale
C)Configuration control
D)Coordination
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
44
What are the biggest challenges for managing a large-scale systems development project?
Unlock Deck
Unlock for access to all 44 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 44 flashcards in this deck.