Deck 6: Allocating Resources to the Project
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/66
Play
Full screen (f)
Deck 6: Allocating Resources to the Project
1
When crashing a task, the usual assumption is that a task is crashed the full amount or none at all.
False
2
If resources were not scarce, the resource allocation problem would be concerned solely with profit maximization.
True
3
If resources were not scarce, the resource allocation problem would be concerned solely with cost minimization.
False
4
Projects often compete with each other for the same resources.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
5
All projects are carried out under conditions of uncertainty.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
6
Trade-offs must be made in order to optimize the use of limited resources.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
7
Often it is beneficial to crash activities not on the critical path.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
8
When the work is routine, fast-tracking rarely causes serious problems.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
9
The time to complete a task with normal or standard-practice resource usage is referred to as the crash duration.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
10
Good project managers are able to estimate project task times with absolute certainty.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
11
Resource loading refers to the amounts of specific resources that are scheduled for use on specific activities or projects at specific times.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
12
Fast-tracking a project is used primarily in the pharmaceutical industry.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
13
The CPM method cannot be used when task durations are probabilistic.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
14
All tasks can be crashed to some extent.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
15
The amount of resources a project can use depends in part on the timing of the allocation.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
16
Resource loading refers to the amounts of specific resources that are scheduled for use on specific activities or projects at specific times.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
17
The variance of the normal time can be quite different from the variance of the crash time.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
18
It is considered good management to crash the least costly activities before the more costly ones.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
19
A project that must be completed by a fixed time is referred to as resource constrained.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
20
For resources that are consumed when used, the problem is which project gets to use the resource first and which must wait.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
21
Pools of like workers are most useful when labor is subdivided into highly specialized subtasks.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
22
According to research minimum slack rule is the overall best priority rule.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
23
The task duration with standard-practice resource usage is referred to as the…
A) expected task duration
B) nominal task duration
C) crash duration
D) normal task duration
E) planned task duration
A) expected task duration
B) nominal task duration
C) crash duration
D) normal task duration
E) planned task duration
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
24
The primary cause of concern in resource allocation is…
A) labor cost
B) resource scarcity
C) lack of solution methodologies
D) parallel activities
E) equipment downtime
A) labor cost
B) resource scarcity
C) lack of solution methodologies
D) parallel activities
E) equipment downtime
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
25
The process of line balancing is when individual production lines are made to generate the required amount of product with a little excess capacity as possible.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
26
Crashing non-critical activities will influence project duration.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
27
Microsoft Project allows the project manager to create an individual availability calendar for each resource on the project
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
28
A limitation associated with traditional approaches to project management is that the dependency between resources and tasks is often ignored.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
29
One limitation of Microsoft Project is that all resources must share the same availability calendar.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
30
The as late as possible priority rule is considered the standard scheduling rule.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
31
Pools of like resources from which labor can be added temporarily to projects tend to increase costs for the firm as a whole.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
32
. The shortest duration task first rule minimizes the number of tasks that can be completed by s system in a given time period.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
33
A task has a normal duration of 9 days and a crash duration of 7 days. Its normal cost is $40 and its crash cost is $100. What is the crash cost per day?
A) $140
B) $70
C) $50
D) $40
E) $30
A) $140
B) $70
C) $50
D) $40
E) $30
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
34
A resource allocation decision may be intended to avoid a future problem rather than correct a current problem.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
35
Activities that have duration but do not require resources are referred to as pseudoactivities.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
36
A task's duration is a function of both the amount of labor required to complete the task as well as the calendar time required to complete it.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
37
Allocating specific, limited resources to specific activities is called…
A) resource allocation
B) resource leveling
C) resource tracking
D) expediting a project
E) crashing a project
A) resource allocation
B) resource leveling
C) resource tracking
D) expediting a project
E) crashing a project
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
38
A project that must be completed by a specific time is considered…
A) time constrained
B) schedule constrained
C) resource constrained
D) performance constrained
E) critically constrained
A) time constrained
B) schedule constrained
C) resource constrained
D) performance constrained
E) critically constrained
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
39
In general, steady state demand for human resources is highly desirable.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
40
Applying "line balancing" techniques to balance the capacity of a project typically yields significant benefits.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
41
All of the following are criteria available to help choose the priority rule mentioned in the textbook except;
A) Schedule slippage
B) Project cost
C) resource utilization
D) in-process inventory
A) Schedule slippage
B) Project cost
C) resource utilization
D) in-process inventory
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
42
What is fast-tracking a project?
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
43
The practice of assigning project team members to multiple projects is called…
A) concurrent engineering
B) parallel activities
C) fast-tracking
D) project crashing
E) multitasking
A) concurrent engineering
B) parallel activities
C) fast-tracking
D) project crashing
E) multitasking
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
44
Which of the following priority rules makes resources available so that activities start on their LSTs whenever possible without increasing the project's duration?
A) as soon as possible
B) as late as possible
C) shortest task duration first
D) minimum slack first
E) most critical successor
A) as soon as possible
B) as late as possible
C) shortest task duration first
D) minimum slack first
E) most critical successor
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
45
Crashing refers to…
A) expediting the project so as to minimizing the total cost of completing the project.
B) expediting the project so as to minimizing the number of activities in the project
C) expediting the project so as to completing the project by a specified time.
D) all of the above
E) none of the above.
A) expediting the project so as to minimizing the total cost of completing the project.
B) expediting the project so as to minimizing the number of activities in the project
C) expediting the project so as to completing the project by a specified time.
D) all of the above
E) none of the above.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
46
A project that must be completed with in the specified performance requirements is considered…
A) time constrained
B) schedule constrained
C) resource constrained
D) performance constrained
E) critically constrained
A) time constrained
B) schedule constrained
C) resource constrained
D) performance constrained
E) critically constrained
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
47
Which of the following is not commonly used to help select a priority rule?
A) schedule slippage
B) resource utilization
C) in-process inventory
D) cost overruns
E) all of the above are used
A) schedule slippage
B) resource utilization
C) in-process inventory
D) cost overruns
E) all of the above are used
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
48
The safety time added to chains other than the critical chain is called…
A) feeding buffer
B) project buffer
C) path buffer
D) critical buffer
E) team buffer
A) feeding buffer
B) project buffer
C) path buffer
D) critical buffer
E) team buffer
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
49
What is the student syndrome? In what ways can it create problems for a project?
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
50
Which of the following is a measure of the amount by which a project is delayed by application of a leveling rule?
A) schedule inflation
B) schedule progression
C) schedule efficacy
D) schedule efficiency
E) schedule slippage
A) schedule inflation
B) schedule progression
C) schedule efficacy
D) schedule efficiency
E) schedule slippage
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
51
What is resource loading?
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
52
Which of the following is not considered a resource?
A) Money
B) People
C) Equipment
D) Material
E) None of the above
A) Money
B) People
C) Equipment
D) Material
E) None of the above
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
53
According to research, the best overall priority rule is…
A) as soon as possible
B) as late as possible
C) shortest task duration first
D) minimum slack first
E) most critical successor
A) as soon as possible
B) as late as possible
C) shortest task duration first
D) minimum slack first
E) most critical successor
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
54
Explain how the commonly made assumption of known activity times can lead to unrealistic project deadlines.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
55
What is resource leveling? Why is it needed?
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
56
List and briefly explain five priority rules used to assign preference to activities when allocating scarce resources.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
57
Which of the following rules maximizes the number of tasks that can be completed by a system in a given period of time?
A) as soon as possible
B) as late as possible
C) shortest task duration first
D) minimum slack first
E) most critical successor
A) as soon as possible
B) as late as possible
C) shortest task duration first
D) minimum slack first
E) most critical successor
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
58
Starting the building phase before the design and planning phases is called…
A) operations overlapping
B) concurrent engineering
C) fast-tracking
D) concurrent construction
E) construction overlapping
A) operations overlapping
B) concurrent engineering
C) fast-tracking
D) concurrent construction
E) construction overlapping
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
59
To crash a project, which of the following principles apply? 1) Focus on the critical path(s) when trying to shorten the duration of a project, 2) Select the least expensive way to do it 3) Crash non-critical activities
A) All three are correct
B) Only 1 and 3 are correct
C) Only 1 and 2 are correct
D) Only 1 is correct
A) All three are correct
B) Only 1 and 3 are correct
C) Only 1 and 2 are correct
D) Only 1 is correct
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
60
Explain how you would choose a priority rule.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
61
Explain the concept of a safety buffer.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
62
Briefly overview Goldratt's common chain of events.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
63
What is the effect of not reporting the early completion of project activities?
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
64
Explain the concept of a feeding buffer.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
65
Why are scarce resources referred to as "Walts"?
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck
66
Explain the concept of a project buffer.
Unlock Deck
Unlock for access to all 66 flashcards in this deck.
Unlock Deck
k this deck