The development group identifies projects based on the ease with which existing hardware and systems will integrate with the proposed project.
Use Space or
up arrow
down arrow
to flip the card.
Question
Projects identified by top management have a cross-functional focus.
Question
The Project Charter reflects the best estimate of the project's scope, benefits, costs, risks, and resource requirements, given the current understanding of the project.
Question
When comparing alternative methods for making information systems identification and selection decisions, top management's selection decisions often involve a small system size and have a cross-functional focus.
Question
Due to the principle of incremental commitment, a selected project will result in a working system.
Question
Project initiation focuses on activities that will help organize a team to conduct project planning.
Question
Increased flexibility is an example of an intangible benefit.
Question
Site preparation is an example of a one-time cost.
Question
The criteria used to evaluate projects will vary by organization.
Question
Requirements structuring is the first activity of the systems planning and selection phase.
Question
The major outcomes and deliverables from project initiation and planning are the Baseline Project Plan and the Project Scope Statement.
Question
Economic feasibility is a process of identifying the financial benefits and costs associated with a development project.
Question
Project planning focuses on defining clear, discrete tasks and the work needed to complete each task.
Question
The objective of project identification and selection is to transform a vague system request document into a tangible project description.
Question
The Baseline Project Plan (BPP) is the primary deliverable from the project identification and selection phase.
Question
A schedule of specific IS development projects is the primary deliverable from the project identification and selection phase.
Question
Proper and insightful project initiation and planning, including determining project scope and identifying project activities, can reduce the time needed to complete later project phases, including systems analysis.
Question
Systems analysis is the first phase of the systems development life cycle.
Question
To maintain consistency, the classification and ranking of projects should only be performed by top management or a steering committee.
Question
Opening new markets and increasing sales opportunities is a tangible benefit.
Question
Referencing the Management Issues section of the Baseline Project Plan, the communication plan provides a description of the team member roles and reporting relationships.
Question
All information collected during project initiation and planning is collected and organized into a document called the Baseline Project Plan.
Question
A walkthrough is a peer group review of any product created during the systems development process.
Question
The construction of an information system can have political ramifications.
Question
Using a discount rate of 14 percent, the present value of a $10,000 benefit received 5 years from now is $5,500.49.
Question
The goal of operational feasibility is to understand the degree to which a proposed system will likely solve the business problems or take advantage of opportunities.
Question
Referencing a walkthrough, the user makes sure that the work product meets the needs of the project's customers.
Question
The time value of money (TVM) compares present cash outlays to future expected returns.
Question
Generally speaking, legal and contractual feasibility is a greater consideration if your organization has historically used an outside organization for specific systems or services that you now are considering handling yourself.
Question
The Explanation of Services is a document prepared for the customer that describes what the project will deliver and outlines generally at a high level all work required to complete the project.
Question
Using a discount rate of 10 percent, the present value of a $2,500 benefit received 5 years from now is $1,552.30.
Question
Fulfillment feasibility is the process of examining the likelihood that the project will attain its desired objectives.
Question
Because many projects may be competing for the same investment dollars and may have different useful life expectancies, all costs and benefits must be viewed in relation to their present rather than future value when comparing investment options.
Question
Using a discount rate of 12 percent, the present value of a $50,500 benefit received 2 years from now is $40,258.29.
Question
The objective of return on investment (ROI) analysis is to discover at what point cumulative benefits equal costs.
Question
If the net present value (NPV) of all costs is $100,000 and the NPV of all benefits is $170,000, then the ROI would be 35 percent.
Question
Variable costs are costs resulting from the ongoing evolution and use of a system.
Question
Referencing a walkthrough, the maintenance oracle ensures that the work product adheres to organizational technical standards.
Question
Referencing a walkthrough, the coordinator reviews the work product in terms of future maintenance activities.
Question
Most techniques for analyzing economic feasibility employ the time value of money concept.
Question
The extent to which the project is viewed as improving profits, customer service, etc., and the duration of these benefits best defines which of the following evaluation criteria?

A) Potential benefits
B) Resource availability
C) Technical difficulty or risks
D) Strategic alignment
E) Value chain analysis
Question
An extranet is Internet-based communication to support business-to-business activities.
Question
Potential development projects can be identified by:

A) a steering committee.
B) top management.
C) a senior IS manager.
D) user departments.
E) all of the above.
Question
The Internet is a global network comprised of thousands of interconnected individual networks that communicate with each other through transmission control protocol/internet protocol (TCP/IP).
Question
Organizations that have intranets dictate what applications will run over the intranet and the speed and quality of the hardware connected to the intranet.
Question
Which of the following is one of the three primary activities associated with identifying and selecting IS development projects?

A) Preliminary investigation of the system problem or opportunity
B) Identification of potential development projects
C) Requirements determination
D) Generate alternative initial designs
E) Requirements structuring
Question
Research has found that projects identified by top management more often:

A) have a narrow, tactical focus.
B) reflect diversity and have a cross-functional focus.
C) have a strategic, organizational focus.
D) will integrate easily with existing hardware and systems.
E) have a very low systems development priority.
Question
A firewall server is an example of a content and service Web-based system cost.
Question
The first phase of the systems development life cycle is:

A) systems planning and selection.
B) systems study.
C) systems analysis.
D) systems design.
E) systems implementation and operation.
Question
Which of the following possible project sources most often reflects the broader needs of the organization?

A) User department
B) Development group
C) IS manager
D) Top management
E) Production manager
Question
Web-based system costs include platform costs, content and service, and marketing.
Question
An intranet refers to the use of the Internet between firms.
Question
Research has found that projects identified by individual departments or business units most often:

A) have a narrow, tactical focus.
B) reflect diversity and have a cross-functional focus.
C) have a strategic, organizational focus.
D) will integrate easily with existing hardware and systems.
E) have a very high systems development priority.
Question
Which of the following alternative methods for making information systems identification and selection decisions has the highest associated cost?

A) Development group
B) User department
C) Steering committee
D) Top management
E) End user
Question
A department head deciding which project requests to submit is an example of:

A) a preliminary investigation of the system problem or opportunity.
B) identifying potential development projects.
C) requirements determination.
D) generating alternative initial designs.
E) requirements structuring.
Question
The systems planning and selection process for an Internet-based electronic commerce application is no different than the process followed for other applications.
Question
Electronic Data Interchange (EDI) is the use of telecommunications technologies to transfer business documents directly between organizations.
Question
Which of the following alternative methods for making information systems identification and selection decisions has as its focus integration with existing systems?

A) Development group
B) User department
C) Steering committee
D) Top management
E) End user
Question
When developing an Internet electronic commerce application, developers must deal with several unknown factors, including the user, connection speed, and access method.
Question
When developing either an intranet or an extranet, developers know who the users are, what applications will be used, the speed of the network connection, and the type of communication devices.
Question
Which of the following is a project planning activity?

A) Establishing management procedures
B) Establishing a relationship with the customer
C) Estimating resources and creating a resource plan
D) Establishing the project management environment and project workbook
E) Establishing the project initiation plan
Question
A major outcome and deliverable from project initiation and planning that reflects the best estimate of the project's scope, benefits, costs, risks, and resource requirements defines the:

A) Baseline Project Plan.
B) Information Systems Plan.
C) Mission Statement.
D) Resource Requirements Statement.
E) Systems Service Request.
Question
If the project team and organizational officials reassess the project after each subsequent SDLC phase to determine if the business conditions have changed or if a more detailed understanding of a system's costs, benefits, and risks suggest that the project is not as worthy as previously thought, they are:

A) adhering to the incremental commitment principle.
B) overly cautious.
C) using a CASE methodology.
D) adhering to a bottom-up commitment principle.
E) using a staged approached to systems development.
Question
Analyzing an organization's activities to determine where value is added to products and/or services and the costs incurred best describes:

A) affinity clustering.
B) business process reengineering.
C) value chain analysis.
D) resource availability.
E) technical difficulty.
Question
The primary deliverable from the project identification and selection phase is:

A) a context data flow diagram.
B) at least three substantively different system design strategies for building the replacement information system.
C) the development of a new version of the software and new versions of all design documents.
D) an entity relationship diagram.
E) a schedule of specific IS development projects.
Question
Tangible benefits would include:

A) improved organizational planning.
B) ability to investigate more alternatives.
C) improved asset control.
D) lower transaction costs.
E) first to market.
Question
Cost reduction and avoidance, error reduction, and increased flexibility are examples of:

A) intangible benefits.
B) qualitative benefits.
C) tangible benefits.
D) legal and contractual benefits.
E) profitable benefits.
Question
As a rule of thumb estimate, what percentage of the entire development effort should be devoted to the project initiation and planning process?

A) Between 10 and 20 percent
B) Less than 5 percent
C) Less than 10 percent
D) Between 20 and 30 percent
E) Over 50 percent
Question
Activities designed to assist in organizing a team to conduct project planning is the focus of:

A) project development.
B) project identification and selection.
C) project initiation.
D) analysis.
E) implementation and operation.
Question
To identify the financial benefits and costs associated with the development project is the purpose of:

A) financial feasibility.
B) technical feasibility.
C) operational feasibility.
D) economic feasibility.
E) schedule feasibility.
Question
The Baseline Project Plan:

A) contains all information collected and analyzed during project initiation and planning.
B) specifies detailed project activities for the next life cycle phase, analysis, and less detail for subsequent project phases.
C) is used by the project selection committee to help decide if the project should be accepted, redirected, or canceled.
D) reflects the best estimate of the project's scope, benefits, costs, risks, and resource requirements given the current understanding of the project.
E) does all of the above.
Question
Which of the following is NOT a project initiation activity?

A) Establishing management procedures
B) Dividing the project into manageable tasks
C) Establishing a relationship with the customer
D) Establishing the project initiation team
E) Establishing the project initiation plan
Question
A major outcome and deliverable from the project initiation and planning phase that contains an estimate of the project's scope, benefits, costs, risks, and resource requirements best defines:

A) Baseline Project Plan.
B) Information Systems Plan.
C) Business Case.
D) Statement of Work.
E) System Service Request.
Question
The extent to which the project is viewed as helping the organization achieve its strategic objectives and long-term goals describes:

A) potential benefits.
B) resource availability.
C) technical difficulty or risks.
D) strategic alignment.
E) value chain analysis.
Question
Which of the following is NOT a project planning activity?

A) Determining project standards and procedures
B) Establishing management procedures
C) Developing a Statement of Work
D) Dividing the project into manageable tasks
E) Developing a communication plan
Question
A benefit derived from the creation of an information system that can be measured in dollars and with certainty is a(n):

A) intangible benefit.
B) qualitative benefit.
C) tangible benefit.
D) operational benefit.
E) profitable benefit.
Question
The reduction of waste creation is an example of a(n):

A) intangible benefit.
B) qualitative benefit.
C) tangible benefit.
D) operational benefit.
E) profitable benefit.
Question
Which of the following is a project initiation activity?

A) Developing a preliminary schedule
B) Setting a baseline project plan
C) Determining project standards and procedures
D) Establishing a relationship with the customer
E) Developing a communication plan
Question
The objective of the project planning process is the development of:

A) a Baseline Project Plan and Project Scope Statement.
B) a Systems Service Request.
C) entity relationship diagrams.
D) corporate strategic plan.
E) an information systems plan.
Question
A savings of $5,000 resulting from data entry error reductions would most likely be classified as a(n):

A) intangible benefit.
B) qualitative benefit.
C) tangible benefit.
D) operational benefit.
E) profitable benefit.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/134
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 4: Systems Planning and Selection
1
The development group identifies projects based on the ease with which existing hardware and systems will integrate with the proposed project.
True
2
Projects identified by top management have a cross-functional focus.
False
3
The Project Charter reflects the best estimate of the project's scope, benefits, costs, risks, and resource requirements, given the current understanding of the project.
False
4
When comparing alternative methods for making information systems identification and selection decisions, top management's selection decisions often involve a small system size and have a cross-functional focus.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
5
Due to the principle of incremental commitment, a selected project will result in a working system.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
6
Project initiation focuses on activities that will help organize a team to conduct project planning.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
7
Increased flexibility is an example of an intangible benefit.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
8
Site preparation is an example of a one-time cost.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
9
The criteria used to evaluate projects will vary by organization.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
10
Requirements structuring is the first activity of the systems planning and selection phase.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
11
The major outcomes and deliverables from project initiation and planning are the Baseline Project Plan and the Project Scope Statement.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
12
Economic feasibility is a process of identifying the financial benefits and costs associated with a development project.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
13
Project planning focuses on defining clear, discrete tasks and the work needed to complete each task.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
14
The objective of project identification and selection is to transform a vague system request document into a tangible project description.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
15
The Baseline Project Plan (BPP) is the primary deliverable from the project identification and selection phase.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
16
A schedule of specific IS development projects is the primary deliverable from the project identification and selection phase.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
17
Proper and insightful project initiation and planning, including determining project scope and identifying project activities, can reduce the time needed to complete later project phases, including systems analysis.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
18
Systems analysis is the first phase of the systems development life cycle.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
19
To maintain consistency, the classification and ranking of projects should only be performed by top management or a steering committee.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
20
Opening new markets and increasing sales opportunities is a tangible benefit.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
21
Referencing the Management Issues section of the Baseline Project Plan, the communication plan provides a description of the team member roles and reporting relationships.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
22
All information collected during project initiation and planning is collected and organized into a document called the Baseline Project Plan.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
23
A walkthrough is a peer group review of any product created during the systems development process.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
24
The construction of an information system can have political ramifications.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
25
Using a discount rate of 14 percent, the present value of a $10,000 benefit received 5 years from now is $5,500.49.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
26
The goal of operational feasibility is to understand the degree to which a proposed system will likely solve the business problems or take advantage of opportunities.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
27
Referencing a walkthrough, the user makes sure that the work product meets the needs of the project's customers.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
28
The time value of money (TVM) compares present cash outlays to future expected returns.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
29
Generally speaking, legal and contractual feasibility is a greater consideration if your organization has historically used an outside organization for specific systems or services that you now are considering handling yourself.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
30
The Explanation of Services is a document prepared for the customer that describes what the project will deliver and outlines generally at a high level all work required to complete the project.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
31
Using a discount rate of 10 percent, the present value of a $2,500 benefit received 5 years from now is $1,552.30.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
32
Fulfillment feasibility is the process of examining the likelihood that the project will attain its desired objectives.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
33
Because many projects may be competing for the same investment dollars and may have different useful life expectancies, all costs and benefits must be viewed in relation to their present rather than future value when comparing investment options.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
34
Using a discount rate of 12 percent, the present value of a $50,500 benefit received 2 years from now is $40,258.29.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
35
The objective of return on investment (ROI) analysis is to discover at what point cumulative benefits equal costs.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
36
If the net present value (NPV) of all costs is $100,000 and the NPV of all benefits is $170,000, then the ROI would be 35 percent.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
37
Variable costs are costs resulting from the ongoing evolution and use of a system.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
38
Referencing a walkthrough, the maintenance oracle ensures that the work product adheres to organizational technical standards.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
39
Referencing a walkthrough, the coordinator reviews the work product in terms of future maintenance activities.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
40
Most techniques for analyzing economic feasibility employ the time value of money concept.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
41
The extent to which the project is viewed as improving profits, customer service, etc., and the duration of these benefits best defines which of the following evaluation criteria?

A) Potential benefits
B) Resource availability
C) Technical difficulty or risks
D) Strategic alignment
E) Value chain analysis
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
42
An extranet is Internet-based communication to support business-to-business activities.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
43
Potential development projects can be identified by:

A) a steering committee.
B) top management.
C) a senior IS manager.
D) user departments.
E) all of the above.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
44
The Internet is a global network comprised of thousands of interconnected individual networks that communicate with each other through transmission control protocol/internet protocol (TCP/IP).
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
45
Organizations that have intranets dictate what applications will run over the intranet and the speed and quality of the hardware connected to the intranet.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
46
Which of the following is one of the three primary activities associated with identifying and selecting IS development projects?

A) Preliminary investigation of the system problem or opportunity
B) Identification of potential development projects
C) Requirements determination
D) Generate alternative initial designs
E) Requirements structuring
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
47
Research has found that projects identified by top management more often:

A) have a narrow, tactical focus.
B) reflect diversity and have a cross-functional focus.
C) have a strategic, organizational focus.
D) will integrate easily with existing hardware and systems.
E) have a very low systems development priority.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
48
A firewall server is an example of a content and service Web-based system cost.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
49
The first phase of the systems development life cycle is:

A) systems planning and selection.
B) systems study.
C) systems analysis.
D) systems design.
E) systems implementation and operation.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
50
Which of the following possible project sources most often reflects the broader needs of the organization?

A) User department
B) Development group
C) IS manager
D) Top management
E) Production manager
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
51
Web-based system costs include platform costs, content and service, and marketing.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
52
An intranet refers to the use of the Internet between firms.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
53
Research has found that projects identified by individual departments or business units most often:

A) have a narrow, tactical focus.
B) reflect diversity and have a cross-functional focus.
C) have a strategic, organizational focus.
D) will integrate easily with existing hardware and systems.
E) have a very high systems development priority.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
54
Which of the following alternative methods for making information systems identification and selection decisions has the highest associated cost?

A) Development group
B) User department
C) Steering committee
D) Top management
E) End user
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
55
A department head deciding which project requests to submit is an example of:

A) a preliminary investigation of the system problem or opportunity.
B) identifying potential development projects.
C) requirements determination.
D) generating alternative initial designs.
E) requirements structuring.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
56
The systems planning and selection process for an Internet-based electronic commerce application is no different than the process followed for other applications.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
57
Electronic Data Interchange (EDI) is the use of telecommunications technologies to transfer business documents directly between organizations.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
58
Which of the following alternative methods for making information systems identification and selection decisions has as its focus integration with existing systems?

A) Development group
B) User department
C) Steering committee
D) Top management
E) End user
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
59
When developing an Internet electronic commerce application, developers must deal with several unknown factors, including the user, connection speed, and access method.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
60
When developing either an intranet or an extranet, developers know who the users are, what applications will be used, the speed of the network connection, and the type of communication devices.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
61
Which of the following is a project planning activity?

A) Establishing management procedures
B) Establishing a relationship with the customer
C) Estimating resources and creating a resource plan
D) Establishing the project management environment and project workbook
E) Establishing the project initiation plan
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
62
A major outcome and deliverable from project initiation and planning that reflects the best estimate of the project's scope, benefits, costs, risks, and resource requirements defines the:

A) Baseline Project Plan.
B) Information Systems Plan.
C) Mission Statement.
D) Resource Requirements Statement.
E) Systems Service Request.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
63
If the project team and organizational officials reassess the project after each subsequent SDLC phase to determine if the business conditions have changed or if a more detailed understanding of a system's costs, benefits, and risks suggest that the project is not as worthy as previously thought, they are:

A) adhering to the incremental commitment principle.
B) overly cautious.
C) using a CASE methodology.
D) adhering to a bottom-up commitment principle.
E) using a staged approached to systems development.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
64
Analyzing an organization's activities to determine where value is added to products and/or services and the costs incurred best describes:

A) affinity clustering.
B) business process reengineering.
C) value chain analysis.
D) resource availability.
E) technical difficulty.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
65
The primary deliverable from the project identification and selection phase is:

A) a context data flow diagram.
B) at least three substantively different system design strategies for building the replacement information system.
C) the development of a new version of the software and new versions of all design documents.
D) an entity relationship diagram.
E) a schedule of specific IS development projects.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
66
Tangible benefits would include:

A) improved organizational planning.
B) ability to investigate more alternatives.
C) improved asset control.
D) lower transaction costs.
E) first to market.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
67
Cost reduction and avoidance, error reduction, and increased flexibility are examples of:

A) intangible benefits.
B) qualitative benefits.
C) tangible benefits.
D) legal and contractual benefits.
E) profitable benefits.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
68
As a rule of thumb estimate, what percentage of the entire development effort should be devoted to the project initiation and planning process?

A) Between 10 and 20 percent
B) Less than 5 percent
C) Less than 10 percent
D) Between 20 and 30 percent
E) Over 50 percent
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
69
Activities designed to assist in organizing a team to conduct project planning is the focus of:

A) project development.
B) project identification and selection.
C) project initiation.
D) analysis.
E) implementation and operation.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
70
To identify the financial benefits and costs associated with the development project is the purpose of:

A) financial feasibility.
B) technical feasibility.
C) operational feasibility.
D) economic feasibility.
E) schedule feasibility.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
71
The Baseline Project Plan:

A) contains all information collected and analyzed during project initiation and planning.
B) specifies detailed project activities for the next life cycle phase, analysis, and less detail for subsequent project phases.
C) is used by the project selection committee to help decide if the project should be accepted, redirected, or canceled.
D) reflects the best estimate of the project's scope, benefits, costs, risks, and resource requirements given the current understanding of the project.
E) does all of the above.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
72
Which of the following is NOT a project initiation activity?

A) Establishing management procedures
B) Dividing the project into manageable tasks
C) Establishing a relationship with the customer
D) Establishing the project initiation team
E) Establishing the project initiation plan
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
73
A major outcome and deliverable from the project initiation and planning phase that contains an estimate of the project's scope, benefits, costs, risks, and resource requirements best defines:

A) Baseline Project Plan.
B) Information Systems Plan.
C) Business Case.
D) Statement of Work.
E) System Service Request.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
74
The extent to which the project is viewed as helping the organization achieve its strategic objectives and long-term goals describes:

A) potential benefits.
B) resource availability.
C) technical difficulty or risks.
D) strategic alignment.
E) value chain analysis.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
75
Which of the following is NOT a project planning activity?

A) Determining project standards and procedures
B) Establishing management procedures
C) Developing a Statement of Work
D) Dividing the project into manageable tasks
E) Developing a communication plan
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
76
A benefit derived from the creation of an information system that can be measured in dollars and with certainty is a(n):

A) intangible benefit.
B) qualitative benefit.
C) tangible benefit.
D) operational benefit.
E) profitable benefit.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
77
The reduction of waste creation is an example of a(n):

A) intangible benefit.
B) qualitative benefit.
C) tangible benefit.
D) operational benefit.
E) profitable benefit.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
78
Which of the following is a project initiation activity?

A) Developing a preliminary schedule
B) Setting a baseline project plan
C) Determining project standards and procedures
D) Establishing a relationship with the customer
E) Developing a communication plan
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
79
The objective of the project planning process is the development of:

A) a Baseline Project Plan and Project Scope Statement.
B) a Systems Service Request.
C) entity relationship diagrams.
D) corporate strategic plan.
E) an information systems plan.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
80
A savings of $5,000 resulting from data entry error reductions would most likely be classified as a(n):

A) intangible benefit.
B) qualitative benefit.
C) tangible benefit.
D) operational benefit.
E) profitable benefit.
Unlock Deck
Unlock for access to all 134 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 134 flashcards in this deck.