Deck 8: Program and Project Management

Full screen (f)
exit full mode
Question
ERP project team members don't need to have functional or technical expertise in a specific area.
Use Space or
up arrow
down arrow
to flip the card.
Question
A program manager should be focused on tactical areas of the ERP implementation.
Question
It is best to have a single work location for an ERP project team.
Question
The PMO will regularly address the critical success factors and how they relate to the decision processes.
Question
Most ERP project teams are made up of a variety of staff and consultants.
Question
As long as a project leader is an important technical or functional contributor for the project, good communication skills are not necessary.
Question
Project management is focused on strategic goals.
Question
The skill set of an ERP project manager must be varied and robust.
Question
The Steering Committee is responsible for ensuring that project teams are working well together.
Question
Hiring skilled ERP staff is not a problem for most ERP implementations.
Question
SMEs usually have a good understanding of the main components involved in an ERP implementation.
Question
Program management is the responsibility of the Project Director.
Question
The PMO needs to make certain that team activities stay synchronized and that progress is being made.
Question
The primary goal of an ERP system should be to upgrade existing legacy systems to a more robust ERP system.
Question
Project management and program management basically refer to the same thing.
Question
Module experts convert business requirements into solutions within the ERP system.
Question
It is the role of the program manager to keep all the projects moving in the same direction to achieve the overall goals of the business.
Question
Most module experts are project driven.
Question
ERP implementations often consist of several projects simultaneously.
Question
Leading ERP projects is a very risky but rewarding activity.
Question
Scope creep can quickly lead to missed deadlines and project budget savings.
Question
Staff turnover is usually not a problem for ERP projects.
Question
It is very important that the executive sponsor speak at the project completion meeting about how important the project is for the organization as a whole.
Question
The ERP project deliverables are part of the project scope.
Question
Outside consultants must be integrated with internal IT personnel on project teams in order to realize the benefits of software transfer.
Question
Never changing the parameters in the original project goals can lead to scope creep.
Question
Staff who are not on the project may not want the new system and actively work to undermine its success.
Question
It is important that the PMO manage the expectations of senior management and communicate the progress of the project.
Question
The hiring and selecting of competent staff will ensure the go live is smooth and the system is sustainable.
Question
The technical leader should be well-versed in the technology but not necessarily in how to manage projects.
Question
The goal of the technical staff is to ensure that the ERP system works as defined.
Question
Senior management must remain committed to the project through every phase and must show their commitment.
Question
If the project scope changes then this means that the resources or time will also need to change.
Question
ERP implementations require teamwork and a low level of trust also.
Question
If decisions about the ERP system are communicated properly it may be difficult to get buy-in on the new system from the users.
Question
Relying solely on internal IT personnel is likely to slow down the ERP project.
Question
If some ERP functionality does not work well, there may need to be a change to the original project scope.
Question
Change control is how changes are managed through a change process and governance.
Question
It is normal in an ERP project that there are always agreements about how to use the system and other issues.
Question
Outside ERP hardware are often used because they don't work for the software vendor or work for the organization implementing the ERP system.
Question
Program management and project management are often used ________ but actually refer to two different things.

A) casually
B) interchangeably
C) progressively
D) interactively
Question
The PMO must balance the project ________, resources and time.

A) functions
B) growth
C) technical requirements
D) scope
Question
The PMO must be constantly evaluating ________, managing resources and the project schedule.

A) software
B) risks
C) vendors
D) hardware
Question
If a(n) ________ is in a leadership position, this will increase project risks and create problems within the team.

A) team player
B) manager
C) SME
D) individual contributor
Question
The ________ understand the ERP functionality and will make the new system do what it is supposed to do.

A) SMEs
B) project team members
C) module experts
D) functional experts
Question
Increased market share is an example of a possible ________ that might justify implementing an ERP system.

A) business goal
B) project
C) CSF
D) process driver
Question
Because SMEs usually only understand a small component of the ERP implementation, they will need to be trained on project process and:

A) functions.
B) changes.
C) modules.
D) methodology.
Question
The ________ needs to make certain that the project team activities stay synchronized and that progress is being made.

A) partners
B) users
C) PMO
D) change management team
Question
Not only should a project manager be able to address issues related to how the system works, but he must be ________ savvy.

A) marketing
B) design
C) politically
D) financially
Question
ERP projects typically have high risks but also:

A) high rewards.
B) high ROI.
C) long payback periods.
D) easy go-live phases.
Question
When a company decides to implement an ERP system, a(n) ________ must be created that outlines the business goals to be achieved.

A) awareness
B) position paper
C) business case
D) white paper
E) committee
Question
Project management is ________ focused while program management is strategically focused.

A) functionally
B) operationally
C) historically
D) tactically
Question
The program manager must ________ all the different projects and make sure the overall business goals are being met.

A) outsource
B) link
C) use
D) offshore
Question
The ________ are responsible for analyzing business requirements and converting them into solutions with the ERP system.

A) design experts
B) SMEs
C) module experts
D) consultants
Question
SMEs will have a hard time understanding how the new system is going to work until they see ________ flow through the system.

A) process management scenarios
B) their own data
C) the system upgrades
D) data migration
Question
The PMO will probably report to the Project Executive and the:

A) vendor team.
B) change management office.
C) owners.
D) Steering Committee.
Question
In order to increase teamwork and productivity, it may be necessary to have ________ in how to conduct effective meetings.

A) examples
B) training
C) books
D) lectures
Question
In the program management model, the ________ manager manages across multiple functional projects.

A) development
B) PMO
C) program
D) project
Question
The ________ have specific knowledge about one or more of the business processes and help to coordinate and prioritize the different functional requirements of the new system.

A) SMEs
B) project team members
C) module experts
D) functional experts
Question
The PMO will also have to make sure that ________ are in key positions.

A) salespeople
B) individual contributors
C) team players
D) executives
Question
There will always be second guessing of ________ made by project members. This can be very harmful to the success of the ERP project.

A) attorneys
B) executives
C) consultants
D) decisions
E) none of the above
Question
Why do ERP projects often take longer to get started than anticipated?
Question
When a key project member leaves in the middle of the project, it is important that there is a process in place to transfer their ________ to their replacement.

A) files
B) scope document
C) knowledge
D) functional requirements document
Question
The ________ must manage the project scope, resources and schedule.

A) attorneys
B) PMO
C) consultants
D) IT staff
E) none of the above
Question
Because of the integrated nature of ERP systems, having good ________ is one of the most important factors in successful projects.

A) attorneys
B) executives
C) teamwork
D) consultants
E) all of the above
Question
Too many changes to the system can slow down the project and bring it ________.

A) under budget
B) to a quick completion
C) to the vendors
D) to a standstill
E) none of the above
Question
ERP projects often take a few ________ to implement so top management may forget some of the key benefits of the system.

A) days
B) months
C) years
D) decades
E) none of the above
Question
Many projects fail because of a lack of ________ throughout the project.

A) communication
B) hardware
C) consultants
D) data
E) all of the above
Question
Changes in project scope or new functionality are often addressed through the research and development of a ________.

A) new system
B) white paper
C) consulting company
D) new organizational structure
E) none of the above
Question
The goal of the ________ is to make sure the new system works as it was defined.

A) functional staff
B) PMO
C) technical staff
D) Steering Committee
Question
In order to minimize the destructive effects of poor communication and backbiting behavior, a PMO must ensure that project teams are ________ for decisions and directions they take.

A) dissolved
B) changed
C) accountable
D) compensated
Question
Because they may have to look outside the company for skilled ERP consultants, the project ________ may depend on when the key staff are in place.

A) training
B) go live date
C) start date
D) stabilization
Question
One important way of calming users' fears is with an aggressive ________ program.

A) training
B) replacement
C) layoff
D) vacation
E) none of the above
Question
In addition to having functional and technical skills, each team member must understand the importance of ________.

A) teamwork
B) the hardware
C) the software
D) the data
E) none of the above
Question
What is the role of the PMO in an ERP project?
Question
What skills should a good project manager have?
Question
What is "program management" and how is it different from the idea of project management?
Question
Because people often have a fear of the unknown, it is normal for them to ________ the changes brought by a new ERP system.

A) embrace
B) encourage
C) accept
D) resist
E) all of the above
Question
What does an SME do? Why are they so crucial for the success of an ERP project?
Question
It is important that the project team has a ________ to work together.

A) team wiki
B) single location
C) project leader
D) project web site
E) central data repository
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/84
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 8: Program and Project Management
1
ERP project team members don't need to have functional or technical expertise in a specific area.
False
2
A program manager should be focused on tactical areas of the ERP implementation.
False
3
It is best to have a single work location for an ERP project team.
True
4
The PMO will regularly address the critical success factors and how they relate to the decision processes.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
5
Most ERP project teams are made up of a variety of staff and consultants.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
6
As long as a project leader is an important technical or functional contributor for the project, good communication skills are not necessary.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
7
Project management is focused on strategic goals.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
8
The skill set of an ERP project manager must be varied and robust.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
9
The Steering Committee is responsible for ensuring that project teams are working well together.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
10
Hiring skilled ERP staff is not a problem for most ERP implementations.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
11
SMEs usually have a good understanding of the main components involved in an ERP implementation.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
12
Program management is the responsibility of the Project Director.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
13
The PMO needs to make certain that team activities stay synchronized and that progress is being made.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
14
The primary goal of an ERP system should be to upgrade existing legacy systems to a more robust ERP system.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
15
Project management and program management basically refer to the same thing.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
16
Module experts convert business requirements into solutions within the ERP system.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
17
It is the role of the program manager to keep all the projects moving in the same direction to achieve the overall goals of the business.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
18
Most module experts are project driven.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
19
ERP implementations often consist of several projects simultaneously.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
20
Leading ERP projects is a very risky but rewarding activity.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
21
Scope creep can quickly lead to missed deadlines and project budget savings.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
22
Staff turnover is usually not a problem for ERP projects.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
23
It is very important that the executive sponsor speak at the project completion meeting about how important the project is for the organization as a whole.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
24
The ERP project deliverables are part of the project scope.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
25
Outside consultants must be integrated with internal IT personnel on project teams in order to realize the benefits of software transfer.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
26
Never changing the parameters in the original project goals can lead to scope creep.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
27
Staff who are not on the project may not want the new system and actively work to undermine its success.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
28
It is important that the PMO manage the expectations of senior management and communicate the progress of the project.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
29
The hiring and selecting of competent staff will ensure the go live is smooth and the system is sustainable.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
30
The technical leader should be well-versed in the technology but not necessarily in how to manage projects.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
31
The goal of the technical staff is to ensure that the ERP system works as defined.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
32
Senior management must remain committed to the project through every phase and must show their commitment.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
33
If the project scope changes then this means that the resources or time will also need to change.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
34
ERP implementations require teamwork and a low level of trust also.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
35
If decisions about the ERP system are communicated properly it may be difficult to get buy-in on the new system from the users.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
36
Relying solely on internal IT personnel is likely to slow down the ERP project.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
37
If some ERP functionality does not work well, there may need to be a change to the original project scope.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
38
Change control is how changes are managed through a change process and governance.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
39
It is normal in an ERP project that there are always agreements about how to use the system and other issues.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
40
Outside ERP hardware are often used because they don't work for the software vendor or work for the organization implementing the ERP system.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
41
Program management and project management are often used ________ but actually refer to two different things.

A) casually
B) interchangeably
C) progressively
D) interactively
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
42
The PMO must balance the project ________, resources and time.

A) functions
B) growth
C) technical requirements
D) scope
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
43
The PMO must be constantly evaluating ________, managing resources and the project schedule.

A) software
B) risks
C) vendors
D) hardware
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
44
If a(n) ________ is in a leadership position, this will increase project risks and create problems within the team.

A) team player
B) manager
C) SME
D) individual contributor
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
45
The ________ understand the ERP functionality and will make the new system do what it is supposed to do.

A) SMEs
B) project team members
C) module experts
D) functional experts
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
46
Increased market share is an example of a possible ________ that might justify implementing an ERP system.

A) business goal
B) project
C) CSF
D) process driver
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
47
Because SMEs usually only understand a small component of the ERP implementation, they will need to be trained on project process and:

A) functions.
B) changes.
C) modules.
D) methodology.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
48
The ________ needs to make certain that the project team activities stay synchronized and that progress is being made.

A) partners
B) users
C) PMO
D) change management team
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
49
Not only should a project manager be able to address issues related to how the system works, but he must be ________ savvy.

A) marketing
B) design
C) politically
D) financially
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
50
ERP projects typically have high risks but also:

A) high rewards.
B) high ROI.
C) long payback periods.
D) easy go-live phases.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
51
When a company decides to implement an ERP system, a(n) ________ must be created that outlines the business goals to be achieved.

A) awareness
B) position paper
C) business case
D) white paper
E) committee
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
52
Project management is ________ focused while program management is strategically focused.

A) functionally
B) operationally
C) historically
D) tactically
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
53
The program manager must ________ all the different projects and make sure the overall business goals are being met.

A) outsource
B) link
C) use
D) offshore
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
54
The ________ are responsible for analyzing business requirements and converting them into solutions with the ERP system.

A) design experts
B) SMEs
C) module experts
D) consultants
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
55
SMEs will have a hard time understanding how the new system is going to work until they see ________ flow through the system.

A) process management scenarios
B) their own data
C) the system upgrades
D) data migration
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
56
The PMO will probably report to the Project Executive and the:

A) vendor team.
B) change management office.
C) owners.
D) Steering Committee.
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
57
In order to increase teamwork and productivity, it may be necessary to have ________ in how to conduct effective meetings.

A) examples
B) training
C) books
D) lectures
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
58
In the program management model, the ________ manager manages across multiple functional projects.

A) development
B) PMO
C) program
D) project
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
59
The ________ have specific knowledge about one or more of the business processes and help to coordinate and prioritize the different functional requirements of the new system.

A) SMEs
B) project team members
C) module experts
D) functional experts
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
60
The PMO will also have to make sure that ________ are in key positions.

A) salespeople
B) individual contributors
C) team players
D) executives
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
61
There will always be second guessing of ________ made by project members. This can be very harmful to the success of the ERP project.

A) attorneys
B) executives
C) consultants
D) decisions
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
62
Why do ERP projects often take longer to get started than anticipated?
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
63
When a key project member leaves in the middle of the project, it is important that there is a process in place to transfer their ________ to their replacement.

A) files
B) scope document
C) knowledge
D) functional requirements document
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
64
The ________ must manage the project scope, resources and schedule.

A) attorneys
B) PMO
C) consultants
D) IT staff
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
65
Because of the integrated nature of ERP systems, having good ________ is one of the most important factors in successful projects.

A) attorneys
B) executives
C) teamwork
D) consultants
E) all of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
66
Too many changes to the system can slow down the project and bring it ________.

A) under budget
B) to a quick completion
C) to the vendors
D) to a standstill
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
67
ERP projects often take a few ________ to implement so top management may forget some of the key benefits of the system.

A) days
B) months
C) years
D) decades
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
68
Many projects fail because of a lack of ________ throughout the project.

A) communication
B) hardware
C) consultants
D) data
E) all of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
69
Changes in project scope or new functionality are often addressed through the research and development of a ________.

A) new system
B) white paper
C) consulting company
D) new organizational structure
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
70
The goal of the ________ is to make sure the new system works as it was defined.

A) functional staff
B) PMO
C) technical staff
D) Steering Committee
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
71
In order to minimize the destructive effects of poor communication and backbiting behavior, a PMO must ensure that project teams are ________ for decisions and directions they take.

A) dissolved
B) changed
C) accountable
D) compensated
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
72
Because they may have to look outside the company for skilled ERP consultants, the project ________ may depend on when the key staff are in place.

A) training
B) go live date
C) start date
D) stabilization
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
73
One important way of calming users' fears is with an aggressive ________ program.

A) training
B) replacement
C) layoff
D) vacation
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
74
In addition to having functional and technical skills, each team member must understand the importance of ________.

A) teamwork
B) the hardware
C) the software
D) the data
E) none of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
75
What is the role of the PMO in an ERP project?
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
76
What skills should a good project manager have?
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
77
What is "program management" and how is it different from the idea of project management?
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
78
Because people often have a fear of the unknown, it is normal for them to ________ the changes brought by a new ERP system.

A) embrace
B) encourage
C) accept
D) resist
E) all of the above
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
79
What does an SME do? Why are they so crucial for the success of an ERP project?
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
80
It is important that the project team has a ________ to work together.

A) team wiki
B) single location
C) project leader
D) project web site
E) central data repository
Unlock Deck
Unlock for access to all 84 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 84 flashcards in this deck.