Deck 7: Operational and Post Implementation

Full screen (f)
exit full mode
Question
The assessment of readiness should start just before the go live date.
Use Space or
up arrow
down arrow
to flip the card.
Question
Once the system is in the production phase, there is no further need for training.
Question
Training should gear up during the readiness process.
Question
Training for users should focus on how they will use the new system for daily processing of transactions.
Question
Everything should be completed and ready for testing at the first readiness checkpoint.
Question
There should be at least three readiness reviews before the ultimate decision to go live.
Question
A readiness assessment should be conducted before going live.
Question
The process for determining readiness consists of a series of meetings and discussions on the status of each of the area tasks.
Question
The readiness process will clarify what needs to be done and provide more focus for the project team.
Question
The readiness process should only include key "super" users.
Question
The stabilization period is from the go live date to about 90 days after, or until the number of issues to be fixed is reduced to a manageable number.
Question
Work on the system development should continue during the stabilization period.
Question
The readiness review status and the go live date should only be communicated to the team leads.
Question
Senior management should review each of the readiness assessment reports.
Question
It is only necessary to train the key users of the system in each functional area.
Question
The readiness process will focus on assessing whether the system configuration is ready for go live.
Question
Elaborate readiness checkpoints help insure that the go live process is smooth.
Question
The PMO is the Project Maintenance Office.
Question
If everything isn't ready by the first readiness assessment, the go live date should be pushed back.
Question
The ERP implementation phase is just after the go live phase.
Question
To better understand the effectiveness of the new ERP system, it is important to have key measurement in place after the go-live phase.
Question
Even though it should be conducted just-in-time, training often gets put into the post-implementation schedule because the project schedule gets compressed.
Question
ERP system training should focus on showing users where to point and click in the applications.
Question
To be effective, organizations should choose one training format and stick with it.
Question
The first tier of the support process usually involves a help desk or a Call Center.
Question
Some ERP system problems can be identified in advance but others can only be identified in real-time use of the system.
Question
If the ERP system is turned on for the first time on Monday and sales people cannot login to get their sales report, this would be an example of a stabilization issue that needs to be tracked and debugged.
Question
Training helps users interact with the ERP system while managing helps them understand how their work is related to the processes and people in other departments.
Question
During the stabilization period, the IT staff will be monitoring the phone lines for response times and ensure that appropriate backups are made.
Question
For security reasons, users should only train on the practice instance in the training labs.
Question
During the stabilization process, it is important to initiate all issues and track them to resolution.
Question
System process questions are usually handled by the vendor experts in the second tier of the support process.
Question
Training should be a continuous process even after the system is live.
Question
After the implementation, data migration must be conducted periodically to ensure that the system is being used correctly and that data entry processes are being followed.
Question
Tier three of the support process usually involves a combination of technical staff along with vendor support.
Question
A practice instance should use real data and configurations.
Question
Post production design is concerned with managing the daily operations of the new ERP system.
Question
A web-based ________ can be a good way to add support to users during the post-implementation phase.

A) order entry
B) FAQ
C) module portfolio
D) change management document
Question
In the parallel implementation approach, the new ERP system is operated concurrently with the competition's.
Question
One problem with running the old legacy system in parallel with the new ERP system is that this can lower the effort and cost required to operate the system.
Question
It is important that the ERP system ________ as the company grows and changes.

A) develops
B) evolves
C) decreases in scope
D) remains static
Question
________ should start during the readiness process and continue through stabilization through to the post production support phase.

A) Assessment
B) Training
C) Process mapping
D) Data migration
Question
Because it is likely that key team members will leave during the project, it is important to have a ________ plan in place.

A) functional operation
B) changes management
C) knowledge transfer
D) component mapping
Question
In the go live and stabilization phases, the ________ is likely to change.

A) design
B) contract
C) hardware vendor
D) team composition
Question
Knowledge and skill transfer should be an integral part of the ________ plan from day one.

A) integration
B) migration
C) implementation
D) development
Question
The ability to identify and correct bad data will be part of the ________ process.

A) design
B) stabilization
C) maintenance
D) go live
Question
Data validation is mostly accomplished by developing detail ________ that identify data problems within the new system.

A) scenarios
B) function modules
C) applications
D) reports
Question
The first task of the ________ plan should be monitoring the transition from the one phase to the other, enabling a smooth transfer of knowledge.

A) design
B) functional requirements
C) knowledge management
D) transition
E) cut-over
Question
When an employee leaves the company, it is important to take time to address the ________ problem.

A) awareness
B) training
C) transfer
D) configuration
Question
The time from the go-live date until about 90 days after is known as the ________ period.

A) stabilization
B) readiness
C) maintenance
D) post-support
Question
The readiness process must be planned and organized well in advance of the ________ date.

A) go-live
B) build
C) stabilization
D) system transfer
Question
An elaborate readiness process is considered to a(n):

A) process management scenarios.
B) change management prerequisite.
C) "best practice."
D) key project indicator.
Question
Making sure that users can connect to the production server from their various sites is a measure of ________ readiness.

A) design
B) post implementation
C) functional
D) technical infrastructure
Question
When there are large amounts of data that need to be updated, a(n) ________ should be available for this.

A) mass update process
B) ETL tool
C) data correction protocol
D) data scrubbing partner
Question
As time goes on, existing users and new employees will need continuous ________ on the ERP system.

A) management
B) growth
C) training
D) functional requirements
Question
Tracking and resolving day-to-day issues with the new ERP system is the job of the:

A) technical staff.
B) Steering Committee.
C) Project Management Office.
D) Help Desk.
Question
In the go-live and stabilization phases, the ________ is replaced by the Application COE.

A) legacy system
B) ERP COE
C) database
D) business process
Question
Having a(n) ________ will eliminate confusion, duplication, and losing data.

A) ETL tool
B) ERP system
C) centralized data repository
D) PMO
Question
________ systems help to streamline the process of knowledge and skill transfer.

A) Legacy
B) Knowledge management
C) Data warehouse
D) Skill transfer
Question
From the operational perspective, during the definition and build phases, it is important to document the ________ and how they are mapped to the ERP software.

A) legacy systems
B) functional requirements
C) databases
D) business processes
Question
After the ERP system goes live, the organization will need to shift into a ________ process.

A) initiation
B) implementation
C) stabilization
D) socialization
E) all of the above
Question
Describe some of the typical user issues and activities that may arise during the stabilization period.
Question
Why is training so important for ERP implementations? What are some of the ways it can be delivered?
Question
The help desk will enlist the support of ________ to help users across the organization.

A) consultants
B) key users
C) executives
D) consultants
E) none of the above
Question
The ________ process begins when the ERP system software is in production, initial training is complete and conversion of critical data is done.

A) initiation
B) stabilization
C) implementation
D) socialization
E) none of the above
Question
The stabilization period is characterized by ________ hours, many problems and lots of anxiety.

A) short
B) long
C) less
D) all of the above
Question
Go live readiness reviews involve ________ the current metrics related to what remains to be completed.

A) documenting
B) purchasing
C) outsourcing
D) refining
Question
With the second and subsequent readiness reviews, the ________ should be assessed to see if it is still feasible.

A) statement of intent
B) scope document
C) go-live date
D) functional requirements document
Question
The go live ________ process will clarify the progress towards completing the activities and identify the major issues on which to focus before going live.

A) development
B) readiness
C) outsourcing
D) integration
E) data migration
Question
Most user problems with the new ERP system are due to a lack of understanding of the system and how business ________ interact with the system.

A) processes
B) people
C) data
D) software
E) all of the above
Question
Basic problems, such as password problems or user access, are usually handled by the ________ tier of the support process.

A) top
B) executive
C) attorney
D) first
E) none of the above
Question
What is the difference between ERP training and education? What is the cause of most of the issues in ERP implementations?
Question
________ is usually the first activity to be cut when an ERP project goes over budget.

A) Managing
B) Consulting
C) Designing
D) Training
E) none of the above
Question
What is the post product support phase? Describe some of the activities that must occur here.
Question
Most issues during and after an ERP implementation are related to ________ and culture.

A) software
B) hardware
C) people
D) data
E) none of the above
Question
Users may be frustrated with the new ERP system because activities that were simple to do in the old legacy system now seem much ________ in the new system.

A) easier
B) faster
C) more complex
D) cheaper
E) none of the above
Question
To make sure that it receives adequate funding and room in the project schedule, training should be endorsed by ________ management.

A) senior
B) operational
C) lower level
D) casual
E) none of the above
Question
Training must be provided to the system users using ________ and examples.

A) DVDs
B) real data
C) applications
D) practice systems
Question
What is the stabilization process? Why is it so critical?
Question
During the stabilization period, subject matter experts should be prepared to help ________ from their departments to learn to use the system.

A) consultants
B) users
C) attorneys
D) vendors
E) none of the above
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/83
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 7: Operational and Post Implementation
1
The assessment of readiness should start just before the go live date.
False
2
Once the system is in the production phase, there is no further need for training.
False
3
Training should gear up during the readiness process.
True
4
Training for users should focus on how they will use the new system for daily processing of transactions.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
5
Everything should be completed and ready for testing at the first readiness checkpoint.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
6
There should be at least three readiness reviews before the ultimate decision to go live.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
7
A readiness assessment should be conducted before going live.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
8
The process for determining readiness consists of a series of meetings and discussions on the status of each of the area tasks.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
9
The readiness process will clarify what needs to be done and provide more focus for the project team.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
10
The readiness process should only include key "super" users.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
11
The stabilization period is from the go live date to about 90 days after, or until the number of issues to be fixed is reduced to a manageable number.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
12
Work on the system development should continue during the stabilization period.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
13
The readiness review status and the go live date should only be communicated to the team leads.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
14
Senior management should review each of the readiness assessment reports.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
15
It is only necessary to train the key users of the system in each functional area.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
16
The readiness process will focus on assessing whether the system configuration is ready for go live.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
17
Elaborate readiness checkpoints help insure that the go live process is smooth.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
18
The PMO is the Project Maintenance Office.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
19
If everything isn't ready by the first readiness assessment, the go live date should be pushed back.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
20
The ERP implementation phase is just after the go live phase.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
21
To better understand the effectiveness of the new ERP system, it is important to have key measurement in place after the go-live phase.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
22
Even though it should be conducted just-in-time, training often gets put into the post-implementation schedule because the project schedule gets compressed.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
23
ERP system training should focus on showing users where to point and click in the applications.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
24
To be effective, organizations should choose one training format and stick with it.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
25
The first tier of the support process usually involves a help desk or a Call Center.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
26
Some ERP system problems can be identified in advance but others can only be identified in real-time use of the system.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
27
If the ERP system is turned on for the first time on Monday and sales people cannot login to get their sales report, this would be an example of a stabilization issue that needs to be tracked and debugged.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
28
Training helps users interact with the ERP system while managing helps them understand how their work is related to the processes and people in other departments.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
29
During the stabilization period, the IT staff will be monitoring the phone lines for response times and ensure that appropriate backups are made.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
30
For security reasons, users should only train on the practice instance in the training labs.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
31
During the stabilization process, it is important to initiate all issues and track them to resolution.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
32
System process questions are usually handled by the vendor experts in the second tier of the support process.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
33
Training should be a continuous process even after the system is live.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
34
After the implementation, data migration must be conducted periodically to ensure that the system is being used correctly and that data entry processes are being followed.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
35
Tier three of the support process usually involves a combination of technical staff along with vendor support.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
36
A practice instance should use real data and configurations.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
37
Post production design is concerned with managing the daily operations of the new ERP system.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
38
A web-based ________ can be a good way to add support to users during the post-implementation phase.

A) order entry
B) FAQ
C) module portfolio
D) change management document
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
39
In the parallel implementation approach, the new ERP system is operated concurrently with the competition's.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
40
One problem with running the old legacy system in parallel with the new ERP system is that this can lower the effort and cost required to operate the system.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
41
It is important that the ERP system ________ as the company grows and changes.

A) develops
B) evolves
C) decreases in scope
D) remains static
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
42
________ should start during the readiness process and continue through stabilization through to the post production support phase.

A) Assessment
B) Training
C) Process mapping
D) Data migration
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
43
Because it is likely that key team members will leave during the project, it is important to have a ________ plan in place.

A) functional operation
B) changes management
C) knowledge transfer
D) component mapping
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
44
In the go live and stabilization phases, the ________ is likely to change.

A) design
B) contract
C) hardware vendor
D) team composition
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
45
Knowledge and skill transfer should be an integral part of the ________ plan from day one.

A) integration
B) migration
C) implementation
D) development
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
46
The ability to identify and correct bad data will be part of the ________ process.

A) design
B) stabilization
C) maintenance
D) go live
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
47
Data validation is mostly accomplished by developing detail ________ that identify data problems within the new system.

A) scenarios
B) function modules
C) applications
D) reports
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
48
The first task of the ________ plan should be monitoring the transition from the one phase to the other, enabling a smooth transfer of knowledge.

A) design
B) functional requirements
C) knowledge management
D) transition
E) cut-over
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
49
When an employee leaves the company, it is important to take time to address the ________ problem.

A) awareness
B) training
C) transfer
D) configuration
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
50
The time from the go-live date until about 90 days after is known as the ________ period.

A) stabilization
B) readiness
C) maintenance
D) post-support
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
51
The readiness process must be planned and organized well in advance of the ________ date.

A) go-live
B) build
C) stabilization
D) system transfer
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
52
An elaborate readiness process is considered to a(n):

A) process management scenarios.
B) change management prerequisite.
C) "best practice."
D) key project indicator.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
53
Making sure that users can connect to the production server from their various sites is a measure of ________ readiness.

A) design
B) post implementation
C) functional
D) technical infrastructure
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
54
When there are large amounts of data that need to be updated, a(n) ________ should be available for this.

A) mass update process
B) ETL tool
C) data correction protocol
D) data scrubbing partner
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
55
As time goes on, existing users and new employees will need continuous ________ on the ERP system.

A) management
B) growth
C) training
D) functional requirements
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
56
Tracking and resolving day-to-day issues with the new ERP system is the job of the:

A) technical staff.
B) Steering Committee.
C) Project Management Office.
D) Help Desk.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
57
In the go-live and stabilization phases, the ________ is replaced by the Application COE.

A) legacy system
B) ERP COE
C) database
D) business process
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
58
Having a(n) ________ will eliminate confusion, duplication, and losing data.

A) ETL tool
B) ERP system
C) centralized data repository
D) PMO
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
59
________ systems help to streamline the process of knowledge and skill transfer.

A) Legacy
B) Knowledge management
C) Data warehouse
D) Skill transfer
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
60
From the operational perspective, during the definition and build phases, it is important to document the ________ and how they are mapped to the ERP software.

A) legacy systems
B) functional requirements
C) databases
D) business processes
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
61
After the ERP system goes live, the organization will need to shift into a ________ process.

A) initiation
B) implementation
C) stabilization
D) socialization
E) all of the above
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
62
Describe some of the typical user issues and activities that may arise during the stabilization period.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
63
Why is training so important for ERP implementations? What are some of the ways it can be delivered?
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
64
The help desk will enlist the support of ________ to help users across the organization.

A) consultants
B) key users
C) executives
D) consultants
E) none of the above
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
65
The ________ process begins when the ERP system software is in production, initial training is complete and conversion of critical data is done.

A) initiation
B) stabilization
C) implementation
D) socialization
E) none of the above
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
66
The stabilization period is characterized by ________ hours, many problems and lots of anxiety.

A) short
B) long
C) less
D) all of the above
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
67
Go live readiness reviews involve ________ the current metrics related to what remains to be completed.

A) documenting
B) purchasing
C) outsourcing
D) refining
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
68
With the second and subsequent readiness reviews, the ________ should be assessed to see if it is still feasible.

A) statement of intent
B) scope document
C) go-live date
D) functional requirements document
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
69
The go live ________ process will clarify the progress towards completing the activities and identify the major issues on which to focus before going live.

A) development
B) readiness
C) outsourcing
D) integration
E) data migration
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
70
Most user problems with the new ERP system are due to a lack of understanding of the system and how business ________ interact with the system.

A) processes
B) people
C) data
D) software
E) all of the above
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
71
Basic problems, such as password problems or user access, are usually handled by the ________ tier of the support process.

A) top
B) executive
C) attorney
D) first
E) none of the above
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
72
What is the difference between ERP training and education? What is the cause of most of the issues in ERP implementations?
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
73
________ is usually the first activity to be cut when an ERP project goes over budget.

A) Managing
B) Consulting
C) Designing
D) Training
E) none of the above
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
74
What is the post product support phase? Describe some of the activities that must occur here.
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
75
Most issues during and after an ERP implementation are related to ________ and culture.

A) software
B) hardware
C) people
D) data
E) none of the above
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
76
Users may be frustrated with the new ERP system because activities that were simple to do in the old legacy system now seem much ________ in the new system.

A) easier
B) faster
C) more complex
D) cheaper
E) none of the above
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
77
To make sure that it receives adequate funding and room in the project schedule, training should be endorsed by ________ management.

A) senior
B) operational
C) lower level
D) casual
E) none of the above
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
78
Training must be provided to the system users using ________ and examples.

A) DVDs
B) real data
C) applications
D) practice systems
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
79
What is the stabilization process? Why is it so critical?
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
80
During the stabilization period, subject matter experts should be prepared to help ________ from their departments to learn to use the system.

A) consultants
B) users
C) attorneys
D) vendors
E) none of the above
Unlock Deck
Unlock for access to all 83 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 83 flashcards in this deck.