The primary purpose of the requirements analysis phase is to ________.

A)eliminate obviously nonsensible projects before forming a project development team
B)identify the requisite skills needed in the IT personnel assigned to the project
C)determine and document the specific features and functions of the new system
D)investigate how much similar projects have cost in the past
Use Space or
up arrow
down arrow
to flip the card.
Question
The initial step in the first phase of the SDLC is to ________.

A)assess the feasibility of the project
B)define the goals and scope of the new system
C)determine the schedule and budget for the project
D)form the project team
Question
As development teams become larger,the average contribution per worker ________.

A)increases
B)decreases
C)stabilizes
D)increases,but only marginally
Question
According to Brooks' Law,adding more people to a late project ________.

A)makes the project later
B)decreases the overall cost
C)improves the quality of work
D)enhances the team's productivity
Question
The process of creating and maintaining information systems is called ________.

A)systems development
B)program development
C)systems definition
D)computer design
Question
As staff size increases,________.

A)the average contribution per worker also increases
B)diseconomies of scale tend to level off and eventually decrease
C)economies of scale consistently increase almost proportionately
D)more meetings and coordination activities are required to keep everyone in sync
Question
Adding more people to a late systems development project will make the project later because ________.

A)allocating tasks becomes easier
B)training new people slows down team members
C)analyzing the system requirements becomes complex
D)budgeting project costs becomes complicated
Question
________ feasibility concerns whether the new information system fits within a company's customs,culture,charter,or legal requirements.

A)Technical
B)Functional
C)Administrative
D)Organizational
Question
Developers in the ________ phase of the SDLC use management's statement of the system needs in order to begin to define a new information system.

A)system definition
B)requirements analysis
C)component design
D)implementation
Question
The bigger the system and the longer the project,________.

A)the lesser are the diseconomies of scale
B)the more the requirements change
C)the greater is the average contribution per worker
D)the easier the task of scheduling
Question
________ are IT professionals who understand both business and technology.

A)Systems analysts
B)Programmers
C)Business analysts
D)Beta testers
Question
Which of the following statements is true regarding the composition of the development team over the life of the SDLC?

A)User involvement is limited to the integrated testing and conversion phase of the SDLC.
B)During requirements definition,the team will be heavy with systems analysts.
C)During integrated testing and conversion,the team is made up of only programmers and designers.
D)During design and implementation,the team will be heavy with business users.
Question
Which of the following is true of systems development?

A)It has little need for human relations skills as tasks are performed by individuals,not groups.
B)It is exclusively a technical task undertaken by programmers and hardware specialists.
C)It is limited to the four domains of hardware,software,data,and procedures.
D)It requires coordinated teamwork of both specialists and nonspecialists with business knowledge.
Question
Compared to program development,systems development is ________.

A)narrower in focus
B)less comprehensive
C)broader in scope
D)usually technical in nature
Question
Which of the following statements is true with regard to the definition of requirements?

A)Requirements determination is a simple,inexpensive process as it is limited to interviewing system users.
B)Requirements should avoid specifying the volume of data to be stored and processed.
C)Requirements determination should ideally focus on software and data components.
D)Requirements include what is to be produced,as well as how frequently and how fast it is to be produced.
Question
The ________ approach is the classical process used to develop information systems.

A)rapid application development (RAD)
B)object-oriented design (OOD)
C)systems development life cycle (SDLC)
D)extreme programming (XP)
Question
During the requirements analysis phase of the SDLC,the development team will create a(n)________ in case the new system involves a new database or substantial changes to an existing database.

A)data model
B)prototype
C)archetype
D)illustration
Question
Information systems are never ________.

A)off-the-shelf
B)tailor-made
C)off-the-shelf with adaptation
D)made-to-order
Question
Which step in the SDLC process aims to eliminate obviously nonsensible projects?

A)Define system goals and scope.
B)Form the project team.
C)Assess project feasibility.
D)Plan the project.
Question
Which is the most important phase in the systems development process?

A)defining the goals and scope of the new information system
B)implementing the information system
C)determining the system's requirements
D)adapting systems to changes in requirements
Question
Software vendors usually bundle fixes of low-priority problems into ________.

A)patches
B)service packs
C)debuggers
D)system fixes
Question
Projects that spend so much time ________ are sometimes said to be in analysis paralysis.

A)in the system definition phase of the SDLC
B)on project scheduling
C)documenting requirements
D)designing system components
Question
Products in the beta test phase ________.

A)are generally fully functioning
B)are incomplete
C)are in the first phase of testing
D)are completely error-free
Question
During the ________ phase of the SDLC process,developers construct,install,and test the components of the information system.

A)requirements analysis
B)database design
C)feasibility assessment
D)implementation
Question
________ refers to the process of moving the business activity from an old information system to a new system.

A)System definition
B)Test plan
C)Parallel installation
D)System conversion
Question
In terms of software design,for ________,the team must determine candidate products and evaluate them against the requirements while for ________,the team produces design documentation for writing program code.

A)off-the-shelf-with-alteration software; custom-developed programs
B)off-the-shelf software; custom-developed programs
C)off-the-shelf-with-alteration software; off-the-shelf software
D)tailor-made software; off-the-shelf software
Question
The advantage of ________ installation is that if the system fails,the failure is contained within a limited boundary.

A)phased
B)parallel
C)pilot
D)plunge
Question
Normal processing procedures for system users are ________.

A)procedures to continue operations when the system fails
B)procedures for backing up data and other resources
C)procedures for using the system to accomplish business tasks
D)procedures to convert back to the system after recovery
Question
________ have the final say on whether a system is ready.

A)Managers
B)Systems analysts
C)Users
D)PQA personnel
Question
Which of the following statements is true with regard to system maintenance?

A)Software developers usually group enhancement requests and failures together.
B)IS personnel prioritize system problems on a first-come-first-served basis.
C)All commercial software products are shipped with known failures.
D)All organizations track system failures and enhancements using word-processing documents.
Question
Parallel installation is the ________ style of installation.

A)most preferred
B)riskiest
C)slowest
D)least expensive
Question
________ is the process of allowing future system users to try out the new system on their own.

A)PQA testing
B)Acceptance testing
C)Pretesting
D)Beta testing
Question
Systems development has a broader scope than computer program development.
Question
A test plan ________.

A)should not include the incorrect actions that users will take
B)should cause every line of program code to be executed
C)should cause only critical error messages to be displayed
D)should be constructed by PQA personnel alone
Question
Software developers group fixes for high priority failures into a ________ that can be applied to all copies of a given product.

A)service pack
B)debugger
C)patch
D)system fix
Question
Normal processing procedures for operations personnel are ________.

A)procedures to continue operations when the system fails
B)procedures for backing up data and other resources
C)procedures for using the system to accomplish business tasks
D)procedures for starting,stopping,and operating the system
Question
Because of the significant risks involved,organizations should avoid this conversion style if possible.

A)plunge
B)parallel
C)pilot
D)phased
Question
The easiest and cheapest time to alter the information system is in the ________ phase of the SDLC.

A)requirements analysis
B)system definition
C)component design
D)implementation
Question
In a ________ installation,the new system runs alongside the old one until it has been tested and is fully operational.

A)pilot
B)parallel
C)phased
D)plunge
Question
One of the reasons for SDLC problems is due to the ________ nature of the SDLC.This implies that the systems development process is supposed to operate in a sequence of nonrepetitive phases.

A)network
B)clustered
C)parallel
D)waterfall
Question
Systems development is easy and risk-free.
Question
The goals and scope of a new information system are determined during the requirements analysis phase of the systems development life cycle.
Question
One of the major challenges in systems development is changing technology.
Question
Organizational feasibility concerns how long it will take to complete the project.
Question
In a pilot installation,a new system is installed in phases across the organization.
Question
Beyond a workgroup of four or five people,diseconomies of scale begin to take over.
Question
Interviews are conducted with system users in the requirements analysis phase of the systems development life cycle.
Question
The third phase of the systems development life cycle is the component design phase.
Question
User involvement is redundant throughout the systems development process.
Question
The cost feasibility of a systems development project is usually expressed in exact figures or terms.
Question
The security needs of an information system are determined during the component design phase of the systems development life cycle.
Question
Brooks' Law points out that whenever you add more people to a project,it will always delay the completion of the project.
Question
In terms of software design for custom-developed programs,the development team identifies off-the-shelf products and then determines the alterations required.
Question
The easiest and cheapest time to alter the information system is in the requirements analysis phase of the systems development life cycle.
Question
The bigger the system and the longer the project,the more the requirements change.
Question
Test plans usually include not only the normal actions that users will take,but also incorrect actions.
Question
Testing is often called product quality assurance (PQA).
Question
Systems analysts are IT professionals who understand both business and technology.
Question
Information systems involve people and procedures,so they can never be off-the-shelf.
Question
The description of fixes and new requirements is input into a system maintenance phase.
Question
Typically,who are part of a systems project team? What are the roles of business analysts and systems analysts?
Question
What are the main tasks that are performed during the system definition phase of the SDLC?
Question
Why is systems development difficult and risky?
Question
Projects that spend little time documenting requirements are sometimes said to be in analysis paralysis.
Question
What is systems development? How is it different from program development?
Question
What is meant by technical feasibility and organizational feasibility?
Question
What are the four ways in which organizations can implement a system conversion?
Question
Explain how diseconomies of scale can affect systems development.
Question
What is a test plan?
Question
What are patches and service packs?
Question
In a plunge installation,the organization shuts off the old system and starts the new system.
Question
What are the tasks of system maintenance?
Question
All commercial software products are shipped with known failures.
Question
The software community has done much work to improve software development forecasting; therefore,scheduling and budgeting for new,large-scale systems is no longer problematic.
Question
What is beta testing?
Question
Actual systems development generally works in accordance with the waterfall nature of the systems development life cycle.
Question
What are the problems associated with the SDLC waterfall? Explain with an example.
Question
How is software designed?
Question
What are the phases of the systems development life cycle (SDLC)?
Question
What is the importance of the requirements analysis phase of the SDLC?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/80
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 10: Information Systems Development
1
The primary purpose of the requirements analysis phase is to ________.

A)eliminate obviously nonsensible projects before forming a project development team
B)identify the requisite skills needed in the IT personnel assigned to the project
C)determine and document the specific features and functions of the new system
D)investigate how much similar projects have cost in the past
C
2
The initial step in the first phase of the SDLC is to ________.

A)assess the feasibility of the project
B)define the goals and scope of the new system
C)determine the schedule and budget for the project
D)form the project team
B
3
As development teams become larger,the average contribution per worker ________.

A)increases
B)decreases
C)stabilizes
D)increases,but only marginally
B
4
According to Brooks' Law,adding more people to a late project ________.

A)makes the project later
B)decreases the overall cost
C)improves the quality of work
D)enhances the team's productivity
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
5
The process of creating and maintaining information systems is called ________.

A)systems development
B)program development
C)systems definition
D)computer design
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
6
As staff size increases,________.

A)the average contribution per worker also increases
B)diseconomies of scale tend to level off and eventually decrease
C)economies of scale consistently increase almost proportionately
D)more meetings and coordination activities are required to keep everyone in sync
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
7
Adding more people to a late systems development project will make the project later because ________.

A)allocating tasks becomes easier
B)training new people slows down team members
C)analyzing the system requirements becomes complex
D)budgeting project costs becomes complicated
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
8
________ feasibility concerns whether the new information system fits within a company's customs,culture,charter,or legal requirements.

A)Technical
B)Functional
C)Administrative
D)Organizational
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
9
Developers in the ________ phase of the SDLC use management's statement of the system needs in order to begin to define a new information system.

A)system definition
B)requirements analysis
C)component design
D)implementation
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
10
The bigger the system and the longer the project,________.

A)the lesser are the diseconomies of scale
B)the more the requirements change
C)the greater is the average contribution per worker
D)the easier the task of scheduling
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
11
________ are IT professionals who understand both business and technology.

A)Systems analysts
B)Programmers
C)Business analysts
D)Beta testers
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
12
Which of the following statements is true regarding the composition of the development team over the life of the SDLC?

A)User involvement is limited to the integrated testing and conversion phase of the SDLC.
B)During requirements definition,the team will be heavy with systems analysts.
C)During integrated testing and conversion,the team is made up of only programmers and designers.
D)During design and implementation,the team will be heavy with business users.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
13
Which of the following is true of systems development?

A)It has little need for human relations skills as tasks are performed by individuals,not groups.
B)It is exclusively a technical task undertaken by programmers and hardware specialists.
C)It is limited to the four domains of hardware,software,data,and procedures.
D)It requires coordinated teamwork of both specialists and nonspecialists with business knowledge.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
14
Compared to program development,systems development is ________.

A)narrower in focus
B)less comprehensive
C)broader in scope
D)usually technical in nature
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
15
Which of the following statements is true with regard to the definition of requirements?

A)Requirements determination is a simple,inexpensive process as it is limited to interviewing system users.
B)Requirements should avoid specifying the volume of data to be stored and processed.
C)Requirements determination should ideally focus on software and data components.
D)Requirements include what is to be produced,as well as how frequently and how fast it is to be produced.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
16
The ________ approach is the classical process used to develop information systems.

A)rapid application development (RAD)
B)object-oriented design (OOD)
C)systems development life cycle (SDLC)
D)extreme programming (XP)
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
17
During the requirements analysis phase of the SDLC,the development team will create a(n)________ in case the new system involves a new database or substantial changes to an existing database.

A)data model
B)prototype
C)archetype
D)illustration
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
18
Information systems are never ________.

A)off-the-shelf
B)tailor-made
C)off-the-shelf with adaptation
D)made-to-order
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
19
Which step in the SDLC process aims to eliminate obviously nonsensible projects?

A)Define system goals and scope.
B)Form the project team.
C)Assess project feasibility.
D)Plan the project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
20
Which is the most important phase in the systems development process?

A)defining the goals and scope of the new information system
B)implementing the information system
C)determining the system's requirements
D)adapting systems to changes in requirements
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
21
Software vendors usually bundle fixes of low-priority problems into ________.

A)patches
B)service packs
C)debuggers
D)system fixes
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
22
Projects that spend so much time ________ are sometimes said to be in analysis paralysis.

A)in the system definition phase of the SDLC
B)on project scheduling
C)documenting requirements
D)designing system components
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
23
Products in the beta test phase ________.

A)are generally fully functioning
B)are incomplete
C)are in the first phase of testing
D)are completely error-free
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
24
During the ________ phase of the SDLC process,developers construct,install,and test the components of the information system.

A)requirements analysis
B)database design
C)feasibility assessment
D)implementation
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
25
________ refers to the process of moving the business activity from an old information system to a new system.

A)System definition
B)Test plan
C)Parallel installation
D)System conversion
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
26
In terms of software design,for ________,the team must determine candidate products and evaluate them against the requirements while for ________,the team produces design documentation for writing program code.

A)off-the-shelf-with-alteration software; custom-developed programs
B)off-the-shelf software; custom-developed programs
C)off-the-shelf-with-alteration software; off-the-shelf software
D)tailor-made software; off-the-shelf software
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
27
The advantage of ________ installation is that if the system fails,the failure is contained within a limited boundary.

A)phased
B)parallel
C)pilot
D)plunge
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
28
Normal processing procedures for system users are ________.

A)procedures to continue operations when the system fails
B)procedures for backing up data and other resources
C)procedures for using the system to accomplish business tasks
D)procedures to convert back to the system after recovery
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
29
________ have the final say on whether a system is ready.

A)Managers
B)Systems analysts
C)Users
D)PQA personnel
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
30
Which of the following statements is true with regard to system maintenance?

A)Software developers usually group enhancement requests and failures together.
B)IS personnel prioritize system problems on a first-come-first-served basis.
C)All commercial software products are shipped with known failures.
D)All organizations track system failures and enhancements using word-processing documents.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
31
Parallel installation is the ________ style of installation.

A)most preferred
B)riskiest
C)slowest
D)least expensive
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
32
________ is the process of allowing future system users to try out the new system on their own.

A)PQA testing
B)Acceptance testing
C)Pretesting
D)Beta testing
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
33
Systems development has a broader scope than computer program development.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
34
A test plan ________.

A)should not include the incorrect actions that users will take
B)should cause every line of program code to be executed
C)should cause only critical error messages to be displayed
D)should be constructed by PQA personnel alone
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
35
Software developers group fixes for high priority failures into a ________ that can be applied to all copies of a given product.

A)service pack
B)debugger
C)patch
D)system fix
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
36
Normal processing procedures for operations personnel are ________.

A)procedures to continue operations when the system fails
B)procedures for backing up data and other resources
C)procedures for using the system to accomplish business tasks
D)procedures for starting,stopping,and operating the system
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
37
Because of the significant risks involved,organizations should avoid this conversion style if possible.

A)plunge
B)parallel
C)pilot
D)phased
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
38
The easiest and cheapest time to alter the information system is in the ________ phase of the SDLC.

A)requirements analysis
B)system definition
C)component design
D)implementation
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
39
In a ________ installation,the new system runs alongside the old one until it has been tested and is fully operational.

A)pilot
B)parallel
C)phased
D)plunge
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
40
One of the reasons for SDLC problems is due to the ________ nature of the SDLC.This implies that the systems development process is supposed to operate in a sequence of nonrepetitive phases.

A)network
B)clustered
C)parallel
D)waterfall
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
41
Systems development is easy and risk-free.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
42
The goals and scope of a new information system are determined during the requirements analysis phase of the systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
43
One of the major challenges in systems development is changing technology.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
44
Organizational feasibility concerns how long it will take to complete the project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
45
In a pilot installation,a new system is installed in phases across the organization.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
46
Beyond a workgroup of four or five people,diseconomies of scale begin to take over.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
47
Interviews are conducted with system users in the requirements analysis phase of the systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
48
The third phase of the systems development life cycle is the component design phase.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
49
User involvement is redundant throughout the systems development process.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
50
The cost feasibility of a systems development project is usually expressed in exact figures or terms.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
51
The security needs of an information system are determined during the component design phase of the systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
52
Brooks' Law points out that whenever you add more people to a project,it will always delay the completion of the project.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
53
In terms of software design for custom-developed programs,the development team identifies off-the-shelf products and then determines the alterations required.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
54
The easiest and cheapest time to alter the information system is in the requirements analysis phase of the systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
55
The bigger the system and the longer the project,the more the requirements change.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
56
Test plans usually include not only the normal actions that users will take,but also incorrect actions.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
57
Testing is often called product quality assurance (PQA).
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
58
Systems analysts are IT professionals who understand both business and technology.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
59
Information systems involve people and procedures,so they can never be off-the-shelf.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
60
The description of fixes and new requirements is input into a system maintenance phase.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
61
Typically,who are part of a systems project team? What are the roles of business analysts and systems analysts?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
62
What are the main tasks that are performed during the system definition phase of the SDLC?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
63
Why is systems development difficult and risky?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
64
Projects that spend little time documenting requirements are sometimes said to be in analysis paralysis.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
65
What is systems development? How is it different from program development?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
66
What is meant by technical feasibility and organizational feasibility?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
67
What are the four ways in which organizations can implement a system conversion?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
68
Explain how diseconomies of scale can affect systems development.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
69
What is a test plan?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
70
What are patches and service packs?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
71
In a plunge installation,the organization shuts off the old system and starts the new system.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
72
What are the tasks of system maintenance?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
73
All commercial software products are shipped with known failures.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
74
The software community has done much work to improve software development forecasting; therefore,scheduling and budgeting for new,large-scale systems is no longer problematic.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
75
What is beta testing?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
76
Actual systems development generally works in accordance with the waterfall nature of the systems development life cycle.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
77
What are the problems associated with the SDLC waterfall? Explain with an example.
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
78
How is software designed?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
79
What are the phases of the systems development life cycle (SDLC)?
Unlock Deck
Unlock for access to all 80 flashcards in this deck.
Unlock Deck
k this deck
80
What is the importance of the requirements analysis phase of the SDLC?
Unlock Deck