Deck 15: Key Concepts in Construction Management and Delivery Methods

Full screen (f)
exit full mode
Question
One advantage of the design/build approach is that usually a firm project cost is established before construction begins.
Use Space or
up arrow
down arrow
to flip the card.
Question
In the case of design/build, the constructor acts as a general contractor with single-firm control of all subcontractors.
Question
In the construction industry of the future, there will likely be a decreased requirement for permits and regulations.
Question
In the construction management approach, the construction manger usually guarantees the overall price and quality of the work.
Question
In comparison to other industries, the construction industry is high in assets.
Question
In a guaranteed maximum price contract, costs above the guarantee are absorbed by the owner.
Question
Unlike the high-technology industry, the construction industry does not place much emphasis on R & D.
Question
A structural engineer is responsible for locating a building on a site and identifying the correct setbacks and elevations.
Question
If an owner has only a fixed amount to spend and would not build a project if its cost would exceed this amount, construction management would be the preferred delivery method.
Question
One advantage of a Design/Bid/Build delivery method is known project costs before construction begins.
Question
Which category of construction is the largest?

A) Residential
B) Building construction
C) Industrial
D) Heavy construction
Question
Which category of construction is typically financed by the public sector?

A) Residential
B) Building construction
C) Industrial
D) Heavy construction
Question
Which category of construction would typically be contracted out as design/build?

A) Residential
B) Building construction
C) Industrial
D) Heavy construction
Question
Dams, highways, and bridges would be classified as what type of project?

A) Residential
B) Building construction
C) Industrial
D) Heavy construction
Question
Which category of construction is characterized by many small companies and great instability during economic recessions?

A) Residential
B) Building construction
C) Industrial
D) Heavy construction
Question
Which of the following characteristics should an owner investigate when choosing a construction manager?

A) Financial health of the company
B) Makeup of the team assigned to the job
C) Experience with similar projects
D) Fee structure
E) All of the above
Question
Drawings and specifications are the output of what stage of a project?

A) Concept and feasibility
B) Procurement
C) Engineering and design
D) Startup and implementation
E) None of the above
Question
Traditionally, concept and feasibility studies are handled by the????

A) Owner
B) Architect
C) Contractor
D) Subcontractor
Question
Site selection and financing would usually be the responsibility of the????

A) Owner
B) Architect
C) Contractor
D) Subcontractor
Question
Which of the following would not be included in a typical site investigation?

A) Size of the site
B) Availability of local labor
C) Soils classification
D) Ledge outcropping
E) Existing structures
Question
Which of the following are the three parties to a construction management contract?

A) Owner, contractor, subcontractor
B) Owner, manager, designer
C) Owner, engineer, contractor
D) Owner, designer, contractor
Question
Banks, office towers, and schools would be classified as what type of project?

A) Residential
B) Building construction
C) Industrial
D) Heavy construction
Question
In what project phase are the bid packages advertised and the project contracted out so construction can begin?

A) Concept and feasibility
B) Engineering and design
C) Procurement
D) Construction
E) Operation and utilization
Question
Design/build means that????

A) One company is responsible for both design and construction
B) Construction begins before design is complete
C) The project is technically complex
D) Both A\mathrm{A} and B\mathrm{B}
Question
Owner involvement is highest during what project phase?

A) Construction
B) Engineering and design
C) Concept and feasibility
D) None of the above
Question
Which of the project types listed would most frequently use a construction management arrangement?

A) Building construction
B) Heavy construction
C) Industrial
D) Residential
Question
The architect is most heavily involved during which of the following project phases?

A) Construction
B) Engineering and design
C) Concept and feasibility
D) Startup and implementation
Question
In a Design/Bid/Build contractual arrangement, the architect signs a contract with the????

A) Owner
B) Construction manager
C) General contractor
D) Subcontractor
E) None of the above
Question
The term fast track means????

A) Design/build
B) Construction starts before the design is complete
C) Cost plus fixed fee
D) None of the above
Question
The developer of a 40-story high-rise office building desires the shortest possible construction time. What contractual arrangement would be best?

A) Construction management
B) Design/build
C) Design/bid/build
D) Either A or B
E) None of the above
Question
Value engineering can best be described as????

A) Reducing cost by reducing quality
B) Getting the best value for the least cost
C) Reducing scope to achieve budget
D) Reorganizing the project team to achieve the greatest efficiency
E) None of the above
Question
Construction management is superior to Design/Bid/Build approaches at addressing which of the following concerns?

A) Increased government regulations
B) Larger projects
C) Increased organizational size
D) Increased organizational complexity
E) All of the above
Question
The advantage(s) of a Design/Bid/Build contractual arrangement is (are)????

A) Reduced project time
B) Non-adversary relationships among participants
C) Known project cost before construction
D) All of the above
Question
A good construction manager has strong ????skills.

A) Technical
B) Personal
C) Managerial
D) Negotiation
E) All of the above
Question
Career opportunities as a construction professional would not include????

A) Estimator
B) Scheduler
C) Field superintendent
D) Specification writer
E) Purchasing agent
Question
Which of the following is true of a GMP contract?

A) GMP is the same as a lump sum bid
B) The contractor passes all costs to the owner up to a predetermined maximum
C) The owner assumes all project risk
D) The construction manager assumes all project risk
E) None of the above
Question
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Evaluate and finalize mechanical and electrical systems

A) Conceptual planning
B) Schematic design
C) Design development
D) Construction documents
E) Bidding and award
Question
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Review and recommend trade contracts with owner

A) Conceptual planning
B) Schematic design
C) Design development
D) Construction documents
E) Bidding and award
Question
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Describe owner's objectives

A) Conceptual planning
B) Schematic design
C) Design development
D) Construction documents
E) Bidding and award
Question
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Analyze alternative schemes and conduct engineering analysis

A) Conceptual planning
B) Schematic design
C) Design development
D) Construction documents
E) Bidding and award
Question
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Prequalify trade contractors

A) Conceptual planning
B) Schematic design
C) Design development
D) Construction documents
E) Bidding and award
Question
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Submit as-built drawings

A) Design development
B) Construction documents
C) Bidding and award
D) Construction
E) Project closeout
Question
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Approve trade contractor progress payments

A) Design development
B) Construction documents
C) Bidding and award
D) Construction
E) Project closeout
Question
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Identify long-lead items

A) Design development
B) Construction documents
C) Bidding and award
D) Construction
E) Project closeout
Question
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Finalize permit procedural flow

A) Design development
B) Construction documents
C) Bidding and award
D) Construction
E) Project closeout
Question
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Prepare addenda for pricing

A) Design development
B) Construction documents
C) Bidding and award
D) Construction
E) Project closeout
Question
Identify the person responsible for the following aspects of a project.

-Financing

A) Owner
B) Architect
C) Construction manager
D) All involved
Question
Identify the person responsible for the following aspects of a project.

-Value engineering

A) Owner
B) Architect
C) Construction manager
D) All involved
Question
Identify the person responsible for the following aspects of a project.

-Drawings and specifications

A) Owner
B) Architect
C) Construction manager
D) All involved
Question
Identify the person responsible for the following aspects of a project.

-Prequalification of specialty subcontractors

A) Owner
B) Architect
C) Construction manager
D) All involved
Question
Learning curve and work schedule studies would be used in estimating the???? of an estimate.

A) Money component
B) Productivity component
C) Both AA and BB
D) None of the above
Question
In reporting, a variance can best be described as????

A) Correct information in the proper form
B) A method for providing information on time
C) A difference from a planned amount
D) None of the above
Question
In which of the design phases listed would cost savings ideas be most easily implemented and have the greatest potential for project cost savings?

A) Conceptual
B) Detailed design
C) Procurement
D) All phases have equal potential
Question
In preparing an estimate, ???? costs account for vacation time, sick days, and so on.

A) Base wage
B) Fringe benefits
C) Wage premiums
D) None of the above
Question
The ????section of the bid package might include information concerning provisions for water and other utilities, sanitation equipment, or storage areas.

A) Construction contract
B) Owner-furnished items
C) General conditions
D) None of the above
Question
Cost control can be approached as an application of Pareto's law, which states that ????percent of a project's outcome is determined by ????percent of the included elements.

A) 50;5050 ; 50
B) 40;6040 ; 60
C) 70;3070 ; 30
D) 80;2080 ; 20
E) 25;7525 ; 75
Question
Value engineering can best be described as ????

A) An ongoing process in the life of a project
B) A design exercise
C) Only done when bidding trade work
D) Seldom worth the effort
E) Both B\mathrm{B} and C\mathrm{C}
Question
Time sheets and equipment use reports are examples of????

A) Information sent from management to the field
B) Information sent from the field to the home office
C) Information gathered for future use
D) Both B and C
E) None of the above
Question
The process of identifying and evaluating contractors for a bid list is called ????

A) Prequalification
B) Forecasting
C) Fast tracking
D) None of the above
Question
The ????type of schedule is graphically simple, easily understood, and accepted by the construction industry.

A) Progress curve
B) Matrix
C) Bar chart
D) None of the above
Question
Owner involvement is highest during which project phase?

A) Construction
B) Engineering and design
C) Concept and feasibility
D) Procurement
E) None of the above
Question
Which of the estimates listed would occur last in a project time line?

A) Rough order of magnitude
B) Square foot estimate
C) Bid estimate
D) Assemblies estimate
Question
The construction manager prepares a ???? estimate for the purposes of evaluation, subcontractor bids, productivity analysis, and so on.

A) Definitive
B) Bid
C) Fair cost
D) All of the above
Question
Which conclusion is correct based on the following figure?
<strong>Which conclusion is correct based on the following figure?  </strong> A) Get good professional advice early in a project. B) As time passes, implementing a change becomes increasingly expensive. C) The best value engineering opportunities occur early in a project. D) All of the above <div style=padding-top: 35px>

A) Get good professional advice early in a project.
B) As time passes, implementing a change becomes increasingly expensive.
C) The best value engineering opportunities occur early in a project.
D) All of the above
Question
The ????estimate would be prepared during a project's conceptual phase.

A) Rough order of magnitude
B) Fair cost
C) Definitive
D) Bid
Question
What term(s) is (are) used to describe the extra time that might be included in an construction activity?

A) Lag
B) Float
C) Slack
D) Lead
E) Both B and C
Question
What is (are) the benefits of meeting with local contractors prior to developing a project bid package?

A) Determine bidder interest
B) Learn about local trade jurisdictions
C) Learn about local building codes
D) Meet local labor pool
E) All of the above
Question
The ????section of a bid package identifies when and where to present the bid.

A) Bid form
B) Invitation to bid
C) Construction contract
D) Bid breakdown
Question
The ????section of a bid package defines the technical requirements, scope, and quality of the project.

A) Construction contract
B) General conditions
C) Special conditions
D) Specifications, addenda, and drawings
Question
General conditions and home office overhead are examples of what type of costs?

A) Direct
B) Indirect
C) Both AA and BB
D) None of the above
Question
The???? type of organizational structure can be described as a "two-boss" system.

A) Generalist
B) Departmental
C) Matrix
D) None of the above
Question
Which of the following is not typically a support staff responsibility?

A) Accounting
B) Marketing
C) Field supervision
D) None of the above
Question
The CSI Masterformat 2004 includes ????divisions.

A) 50
B) 12
C) 8
D) 6
Question
A (An)????is a systematic classification and categorization of all work or cost items pertaining to a particular project.

A) Network schedule
B) Cost code
C) Distribution code
D) Estimate
E) None of the above
Question
Which of the following would not be classified as a direct cost?

A) Safety and first aid expenses
B) Finishing labor for a concrete slab
C) Materials for a structural steel frame
D) Foundation excavation equipment expenses
E) None of the above
Question
The???? is the maximum amount of time an activity can be delayed without extending the overall project completion time.

A) Duration
B) Float
C) Critical path
D) None of the above
Question
Which of the following would be considered an external factor that might affect a project's success?

A) Weather
B) Economic disturbance
C) Labor dispute
D) All of the above
Question
A construction network schedule shows????

A) The order in which construction tasks must be completed
B) Which construction tasks can be done together
C) Which construction tasks must follow other operations
D) All of the above
Question
Which curve listed would best serve as the basis for a contractor's accounts payable (A/P)?

A) Cost
B) Production
C) Schedule of values
D) Cash requirements
E) Income
Question
A cash flow analysis utilizes information from a (an)????

A) Estimate
B) Construction schedule
C) Value engineering program
D) Both A\mathrm{A} and B\mathrm{B}
E) None of the above
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/135
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 15: Key Concepts in Construction Management and Delivery Methods
1
One advantage of the design/build approach is that usually a firm project cost is established before construction begins.
False
2
In the case of design/build, the constructor acts as a general contractor with single-firm control of all subcontractors.
True
3
In the construction industry of the future, there will likely be a decreased requirement for permits and regulations.
False
4
In the construction management approach, the construction manger usually guarantees the overall price and quality of the work.
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
5
In comparison to other industries, the construction industry is high in assets.
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
6
In a guaranteed maximum price contract, costs above the guarantee are absorbed by the owner.
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
7
Unlike the high-technology industry, the construction industry does not place much emphasis on R & D.
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
8
A structural engineer is responsible for locating a building on a site and identifying the correct setbacks and elevations.
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
9
If an owner has only a fixed amount to spend and would not build a project if its cost would exceed this amount, construction management would be the preferred delivery method.
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
10
One advantage of a Design/Bid/Build delivery method is known project costs before construction begins.
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
11
Which category of construction is the largest?

A) Residential
B) Building construction
C) Industrial
D) Heavy construction
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
12
Which category of construction is typically financed by the public sector?

A) Residential
B) Building construction
C) Industrial
D) Heavy construction
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
13
Which category of construction would typically be contracted out as design/build?

A) Residential
B) Building construction
C) Industrial
D) Heavy construction
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
14
Dams, highways, and bridges would be classified as what type of project?

A) Residential
B) Building construction
C) Industrial
D) Heavy construction
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
15
Which category of construction is characterized by many small companies and great instability during economic recessions?

A) Residential
B) Building construction
C) Industrial
D) Heavy construction
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
16
Which of the following characteristics should an owner investigate when choosing a construction manager?

A) Financial health of the company
B) Makeup of the team assigned to the job
C) Experience with similar projects
D) Fee structure
E) All of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
17
Drawings and specifications are the output of what stage of a project?

A) Concept and feasibility
B) Procurement
C) Engineering and design
D) Startup and implementation
E) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
18
Traditionally, concept and feasibility studies are handled by the????

A) Owner
B) Architect
C) Contractor
D) Subcontractor
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
19
Site selection and financing would usually be the responsibility of the????

A) Owner
B) Architect
C) Contractor
D) Subcontractor
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
20
Which of the following would not be included in a typical site investigation?

A) Size of the site
B) Availability of local labor
C) Soils classification
D) Ledge outcropping
E) Existing structures
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
21
Which of the following are the three parties to a construction management contract?

A) Owner, contractor, subcontractor
B) Owner, manager, designer
C) Owner, engineer, contractor
D) Owner, designer, contractor
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
22
Banks, office towers, and schools would be classified as what type of project?

A) Residential
B) Building construction
C) Industrial
D) Heavy construction
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
23
In what project phase are the bid packages advertised and the project contracted out so construction can begin?

A) Concept and feasibility
B) Engineering and design
C) Procurement
D) Construction
E) Operation and utilization
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
24
Design/build means that????

A) One company is responsible for both design and construction
B) Construction begins before design is complete
C) The project is technically complex
D) Both A\mathrm{A} and B\mathrm{B}
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
25
Owner involvement is highest during what project phase?

A) Construction
B) Engineering and design
C) Concept and feasibility
D) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
26
Which of the project types listed would most frequently use a construction management arrangement?

A) Building construction
B) Heavy construction
C) Industrial
D) Residential
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
27
The architect is most heavily involved during which of the following project phases?

A) Construction
B) Engineering and design
C) Concept and feasibility
D) Startup and implementation
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
28
In a Design/Bid/Build contractual arrangement, the architect signs a contract with the????

A) Owner
B) Construction manager
C) General contractor
D) Subcontractor
E) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
29
The term fast track means????

A) Design/build
B) Construction starts before the design is complete
C) Cost plus fixed fee
D) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
30
The developer of a 40-story high-rise office building desires the shortest possible construction time. What contractual arrangement would be best?

A) Construction management
B) Design/build
C) Design/bid/build
D) Either A or B
E) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
31
Value engineering can best be described as????

A) Reducing cost by reducing quality
B) Getting the best value for the least cost
C) Reducing scope to achieve budget
D) Reorganizing the project team to achieve the greatest efficiency
E) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
32
Construction management is superior to Design/Bid/Build approaches at addressing which of the following concerns?

A) Increased government regulations
B) Larger projects
C) Increased organizational size
D) Increased organizational complexity
E) All of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
33
The advantage(s) of a Design/Bid/Build contractual arrangement is (are)????

A) Reduced project time
B) Non-adversary relationships among participants
C) Known project cost before construction
D) All of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
34
A good construction manager has strong ????skills.

A) Technical
B) Personal
C) Managerial
D) Negotiation
E) All of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
35
Career opportunities as a construction professional would not include????

A) Estimator
B) Scheduler
C) Field superintendent
D) Specification writer
E) Purchasing agent
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
36
Which of the following is true of a GMP contract?

A) GMP is the same as a lump sum bid
B) The contractor passes all costs to the owner up to a predetermined maximum
C) The owner assumes all project risk
D) The construction manager assumes all project risk
E) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
37
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Evaluate and finalize mechanical and electrical systems

A) Conceptual planning
B) Schematic design
C) Design development
D) Construction documents
E) Bidding and award
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
38
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Review and recommend trade contracts with owner

A) Conceptual planning
B) Schematic design
C) Design development
D) Construction documents
E) Bidding and award
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
39
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Describe owner's objectives

A) Conceptual planning
B) Schematic design
C) Design development
D) Construction documents
E) Bidding and award
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
40
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Analyze alternative schemes and conduct engineering analysis

A) Conceptual planning
B) Schematic design
C) Design development
D) Construction documents
E) Bidding and award
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
41
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Prequalify trade contractors

A) Conceptual planning
B) Schematic design
C) Design development
D) Construction documents
E) Bidding and award
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
42
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Submit as-built drawings

A) Design development
B) Construction documents
C) Bidding and award
D) Construction
E) Project closeout
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
43
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Approve trade contractor progress payments

A) Design development
B) Construction documents
C) Bidding and award
D) Construction
E) Project closeout
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
44
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Identify long-lead items

A) Design development
B) Construction documents
C) Bidding and award
D) Construction
E) Project closeout
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
45
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Finalize permit procedural flow

A) Design development
B) Construction documents
C) Bidding and award
D) Construction
E) Project closeout
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
46
Identify in which listed project phase each following project activity would normally occur. Use each phase once only.

-Prepare addenda for pricing

A) Design development
B) Construction documents
C) Bidding and award
D) Construction
E) Project closeout
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
47
Identify the person responsible for the following aspects of a project.

-Financing

A) Owner
B) Architect
C) Construction manager
D) All involved
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
48
Identify the person responsible for the following aspects of a project.

-Value engineering

A) Owner
B) Architect
C) Construction manager
D) All involved
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
49
Identify the person responsible for the following aspects of a project.

-Drawings and specifications

A) Owner
B) Architect
C) Construction manager
D) All involved
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
50
Identify the person responsible for the following aspects of a project.

-Prequalification of specialty subcontractors

A) Owner
B) Architect
C) Construction manager
D) All involved
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
51
Learning curve and work schedule studies would be used in estimating the???? of an estimate.

A) Money component
B) Productivity component
C) Both AA and BB
D) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
52
In reporting, a variance can best be described as????

A) Correct information in the proper form
B) A method for providing information on time
C) A difference from a planned amount
D) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
53
In which of the design phases listed would cost savings ideas be most easily implemented and have the greatest potential for project cost savings?

A) Conceptual
B) Detailed design
C) Procurement
D) All phases have equal potential
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
54
In preparing an estimate, ???? costs account for vacation time, sick days, and so on.

A) Base wage
B) Fringe benefits
C) Wage premiums
D) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
55
The ????section of the bid package might include information concerning provisions for water and other utilities, sanitation equipment, or storage areas.

A) Construction contract
B) Owner-furnished items
C) General conditions
D) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
56
Cost control can be approached as an application of Pareto's law, which states that ????percent of a project's outcome is determined by ????percent of the included elements.

A) 50;5050 ; 50
B) 40;6040 ; 60
C) 70;3070 ; 30
D) 80;2080 ; 20
E) 25;7525 ; 75
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
57
Value engineering can best be described as ????

A) An ongoing process in the life of a project
B) A design exercise
C) Only done when bidding trade work
D) Seldom worth the effort
E) Both B\mathrm{B} and C\mathrm{C}
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
58
Time sheets and equipment use reports are examples of????

A) Information sent from management to the field
B) Information sent from the field to the home office
C) Information gathered for future use
D) Both B and C
E) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
59
The process of identifying and evaluating contractors for a bid list is called ????

A) Prequalification
B) Forecasting
C) Fast tracking
D) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
60
The ????type of schedule is graphically simple, easily understood, and accepted by the construction industry.

A) Progress curve
B) Matrix
C) Bar chart
D) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
61
Owner involvement is highest during which project phase?

A) Construction
B) Engineering and design
C) Concept and feasibility
D) Procurement
E) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
62
Which of the estimates listed would occur last in a project time line?

A) Rough order of magnitude
B) Square foot estimate
C) Bid estimate
D) Assemblies estimate
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
63
The construction manager prepares a ???? estimate for the purposes of evaluation, subcontractor bids, productivity analysis, and so on.

A) Definitive
B) Bid
C) Fair cost
D) All of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
64
Which conclusion is correct based on the following figure?
<strong>Which conclusion is correct based on the following figure?  </strong> A) Get good professional advice early in a project. B) As time passes, implementing a change becomes increasingly expensive. C) The best value engineering opportunities occur early in a project. D) All of the above

A) Get good professional advice early in a project.
B) As time passes, implementing a change becomes increasingly expensive.
C) The best value engineering opportunities occur early in a project.
D) All of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
65
The ????estimate would be prepared during a project's conceptual phase.

A) Rough order of magnitude
B) Fair cost
C) Definitive
D) Bid
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
66
What term(s) is (are) used to describe the extra time that might be included in an construction activity?

A) Lag
B) Float
C) Slack
D) Lead
E) Both B and C
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
67
What is (are) the benefits of meeting with local contractors prior to developing a project bid package?

A) Determine bidder interest
B) Learn about local trade jurisdictions
C) Learn about local building codes
D) Meet local labor pool
E) All of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
68
The ????section of a bid package identifies when and where to present the bid.

A) Bid form
B) Invitation to bid
C) Construction contract
D) Bid breakdown
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
69
The ????section of a bid package defines the technical requirements, scope, and quality of the project.

A) Construction contract
B) General conditions
C) Special conditions
D) Specifications, addenda, and drawings
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
70
General conditions and home office overhead are examples of what type of costs?

A) Direct
B) Indirect
C) Both AA and BB
D) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
71
The???? type of organizational structure can be described as a "two-boss" system.

A) Generalist
B) Departmental
C) Matrix
D) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
72
Which of the following is not typically a support staff responsibility?

A) Accounting
B) Marketing
C) Field supervision
D) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
73
The CSI Masterformat 2004 includes ????divisions.

A) 50
B) 12
C) 8
D) 6
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
74
A (An)????is a systematic classification and categorization of all work or cost items pertaining to a particular project.

A) Network schedule
B) Cost code
C) Distribution code
D) Estimate
E) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
75
Which of the following would not be classified as a direct cost?

A) Safety and first aid expenses
B) Finishing labor for a concrete slab
C) Materials for a structural steel frame
D) Foundation excavation equipment expenses
E) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
76
The???? is the maximum amount of time an activity can be delayed without extending the overall project completion time.

A) Duration
B) Float
C) Critical path
D) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
77
Which of the following would be considered an external factor that might affect a project's success?

A) Weather
B) Economic disturbance
C) Labor dispute
D) All of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
78
A construction network schedule shows????

A) The order in which construction tasks must be completed
B) Which construction tasks can be done together
C) Which construction tasks must follow other operations
D) All of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
79
Which curve listed would best serve as the basis for a contractor's accounts payable (A/P)?

A) Cost
B) Production
C) Schedule of values
D) Cash requirements
E) Income
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
80
A cash flow analysis utilizes information from a (an)????

A) Estimate
B) Construction schedule
C) Value engineering program
D) Both A\mathrm{A} and B\mathrm{B}
E) None of the above
Unlock Deck
Unlock for access to all 135 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 135 flashcards in this deck.