Deck 7: Bidding and Procurement

Full screen (f)
exit full mode
Question
What is the term used to describe the process of investigating the capability of contractors prior to being selected to bid on an upcoming project?

A) Bonding
B) Prequalification
C) Request for proposal (RFP)
D) Licensing
E) Certification
Use Space or
up arrow
down arrow
to flip the card.
Question
In a "pure" construction management delivery method, the selected subcontractor will sign a contract with the ????

A) Owner
B) Construction manager
C) General contractor
D) Designer
E) None of the above
Question
An addendum is a change issued to a bidder after contract award. The accepted addendum may lead to a change in price, time, and/or work required to be accomplished.
Question
A ????bond requires that the contractor will accomplish acceptably the work contracted.

A) Bid
B) Performance
C) Payment
D) Lien
E) None of the above
Question
One of the current trends in risk management is towards centralized control of all project insurance.
Question
Identify in which listed part of a typical bid package the following requested information would be found.

-Would include a change in technical requirements issued prior to bid opening

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions
Question
Identify in which listed part of a typical bid package the following requested information would be found.

-Would address issues such as parking on the job site, traffic control needs, and prevailing wage provisions

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions
Question
Identify in which listed part of a typical bid package the following requested information would be found.

-Would indicate the date and location for submission of bids

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions
Question
Identify in which listed part of a typical bid package the following requested information would be found.

-Owner request for pricing of a substitute material

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions
Question
Identify in which listed part of a typical bid package the following requested information would be found.

-A liquidated damage clause

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 7: Bidding and Procurement
1
What is the term used to describe the process of investigating the capability of contractors prior to being selected to bid on an upcoming project?

A) Bonding
B) Prequalification
C) Request for proposal (RFP)
D) Licensing
E) Certification
Prequalification
2
In a "pure" construction management delivery method, the selected subcontractor will sign a contract with the ????

A) Owner
B) Construction manager
C) General contractor
D) Designer
E) None of the above
Owner
3
An addendum is a change issued to a bidder after contract award. The accepted addendum may lead to a change in price, time, and/or work required to be accomplished.
False
4
A ????bond requires that the contractor will accomplish acceptably the work contracted.

A) Bid
B) Performance
C) Payment
D) Lien
E) None of the above
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
5
One of the current trends in risk management is towards centralized control of all project insurance.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
6
Identify in which listed part of a typical bid package the following requested information would be found.

-Would include a change in technical requirements issued prior to bid opening

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
7
Identify in which listed part of a typical bid package the following requested information would be found.

-Would address issues such as parking on the job site, traffic control needs, and prevailing wage provisions

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
8
Identify in which listed part of a typical bid package the following requested information would be found.

-Would indicate the date and location for submission of bids

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
9
Identify in which listed part of a typical bid package the following requested information would be found.

-Owner request for pricing of a substitute material

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
10
Identify in which listed part of a typical bid package the following requested information would be found.

-A liquidated damage clause

A) Agreement
B) Instructions to bidders
C) Alternates
D) Drawings, specifications, and addenda
E) General and special conditions