Deck 13: Installation and Operations

Full screen (f)
exit full mode
Question
The conversion style that recommends operating the new system along side the old system for a trial period is known as _____.

A) direct
B) parallel
C) phased
D) pilot
E) simultaneous
Use Space or
up arrow
down arrow
to flip the card.
Question
The three-stage process for managing organizational change that was developed by Lewin is _____.

A) As-Is system, transition, and To-Be system
B) hold, shuffle, and fold
C) SDLC, RAD, and BPR
D) support, maintain, and assess
E) unfreeze, move, and refreeze
Question
The installation of SAP to replace all of your legacy systems is an example of what type of conversion?

A) modular
B) phased
C) pilot
D) simultaneous
E) whole system
Question
The person charged with actually planning and implementing the change necessary to support the implementation of a new system is known as a _____.

A) change agent
B) potential adopter
C) project manager
D) project sponsor
E) systems analyst
Question
A migration plan contains two major elements. They are _____.

A) challenging and motivation
B) change and assessment
C) conversion and testing
D) supportive and maintenance
E) technical and organizational
Question
The most important factor associated with successful change is a(n) _____.

A) clear plan for change
B) compelling personal reason to change
C) committed business sponsor
D) demonstrated support by top management
E) management directive
Question
Training for a business system should focus on _____.

A) all the capabilities of the new system
B) complex computerized modules and code
C) helping the users to accomplish their jobs
D) how to use the system
E) not using the system
Question
Postimplementation activities include _____.

A) project assessment
B) system maintenance
C) system support
D) system support and system maintenance
E) system support, system maintenance, and project assessment
Question
Which of the following is included as a basic step in a change management plan?

A) convert data
B) install hardware
C) install software
D) motivate adoption
E) write plan
Question
Which of the following is the most costly aspect of the installation process?

A) change management
B) conversion
C) maintenance
D) training
E) analysis
Question
The Deliver-Fast Internet system must be implemented quickly if this new company is to survive. Which conversion style and modules would you recommend?

A) direct and modular
B) direct and whole system
C) parallel and whole system
D) simultaneous and direct
E) simultaneous and whole system
Question
A system review is typically conducted _____.

A) right after the system is implemented
B) just before the system is implemented
C) during the project initiation phase
D) several months after the system is installed
E) during the project team review
Question
The conversion strategy that will require the least amount of time is _____.

A) direct conversion of the entire system at all locations simultaneously
B) direct conversion of the system by modules throughout locations in phases
C) parallel conversion of the entire system at all locations simultaneously
D) parallel conversion of the system by modules at all locations simultaneous
E) All are about the same in terms of time
Question
During a change management process the potential adopters that would readily accept a new system are normally _____%.

A) 5-10
B) 20-30
C) 40-50
D) 50-60
E) 60-70
Question
Cold turkey, big bang, and abrupt cut-over are alternative names for _____ conversion.

A) direct
B) parallel
C) phased
D) pilot
E) simultaneous
Question
Install hardware, install software, and convert data are the three steps found in the _____.

A) change management process
B) conversion plan
C) direct conversion activity
D) file and database conversion
E) purchase or rent process
Question
Tim and Sara need to provide conversion advice to the IAM-POOR company when it converts the concrete manufacturing and mixing computer system. IAM-POOR is looking for a low cost conversion strategy. What conversion modules and style should they recommend?

A) modular and phased
B) pilot and direct
C) pilot and parallel
D) whole system and direct
E) whole system and parallel
Question
The process of refining the system to make sure that it continues to meet business and organizational needs is called _____.

A) change management
B) project assessment
C) system maintenance
D) system review
E) system support
Question
When an organization has one or more locations or units within a location converted first, this is called _____ conversion.

A) direct
B) parallel
C) phased
D) pilot
E) simultaneous
Question
Phil and Maryanne would like to provide conversion advice to the TRI-COL company when it converts the manufacturing and chemical mixing computer system. TRI-COL produces a very dangerous chemical (limit the risk) used to defoliate the rainforest. What conversion location and style should they recommend?

A) direct and parallel
B) modular and pilot
C) parallel and modular
D) phased and pilot
E) pilot and parallel
Question
Online support, the most common form of on-demand training, includes the documentation and help screens built into the system, as well as separate Web sites that provide answers to frequently asked questions.
Question
Postimplementation activities attempt to _____ the organization after the successful transition to the new system.

A) streamline
B) refreeze
C) down size
D) right size
E) improve
Question
One of the earliest models for managing organizational change was developed by Kurt Lewin. Lewin argued that change is a three-step process: unfreeze, _________, refreeze.

A) migrate
B) change
C) develop
D) move
E) program
Question
Change management is the process of helping people to adopt and adapt to the to-be system and its accompanying work processes without undue stress.
Question
Project team review is usually conducted _____.

A) right after the system is implemented
B) just before the system is implemented
C) during the project initiation phase
D) several months after the system is installed
E) during the project team review
Question
When training users from a collectivistic culture it makes sense to use _____.

A) online support (OLS)
B) frequently asked questions (FAQ)
C) on-demand training (ODT)
D) group-based training
E) computer-based training (CBT)
Question
If you decide to upgrade, allow yourself at least _____ to test the upgrade on a separate system before you install it.

A) a day
B) a week
C) two weeks
D) a month
E) two months
Question
Systems analysts examine four important factors when selecting a conversion strategy: risk, cost, communication, and time required.
Question
Direct conversion is the conversion style where both systems (as-is and to-be) are used simultaneously.
Question
APS Systems would like to convert to the new system quickly. The ideal conversion strategy for APS Systems would be a conversion style of parallel and a modular conversion.
Question
Whole system conversion is the conversion location where the separate and distinct modules of the entire system are installed at one time in three or more phases.
Question
Project assessment is not usually performed, yet it can be an important component of organizational learning.
Question
When one or more locations or units within a organization are selected to be converted first as part of a pilot test, this is called phased conversion.
Question
Moving users from the as-is business processes and computer programs to the to-be business processes and programs is called conversion.
Question
There are three key roles in any major organizational change, the sponsor of the change, the change agent, and ___________.

A) potential adopters
B) customers
C) users
D) project mangers
E) vendors
Question
The sponsor, the change agent, and the potential adopters are the actors found in the change management process.
Question
There are three important factors to consider in selecting a conversion strategy: risk, cost, and _____________.

A) the time required
B) system features
C) infrastructure
D) planning
E) performance
Question
APS Systems would like to convert to the new system with very little risk. The ideal conversion strategy for APS Systems would be a conversion style of parallel, piloted, and a modular conversion.
Question
If there are many users to train, many organizations turn to _____.

A) online support (OLS)
B) frequently asked questions (FAQ)
C) on-demand training (ODT)
D) classroom training
E) computer-based training (CBT)
Question
The conversion style is the way in which users are switched between the old and new systems. There are two fundamentally different approaches to the style of conversion: direct conversion and ______________________.

A) indirect conversion
B) parallel conversion
C) phased conversion
D) pilot conversion
E) simultaneous conversion
Question
Parallel conversion is less risky than direct conversion because it has a greater chance of detecting bugs that have gone undiscovered in testing; pilot conversion is less risky than either phased or simultaneous conversion because if bugs do occur, they occur in only pilot test locations.
Question
Direct conversion, where the new system is turned on and the old system is immediately turned off, is the simplest and most straightforward method, but it is also the most risky because any problems with the new system may seriously disrupt the organization.
Question
When all of the modules of a system are installed at one time, an organization is using whole system conversion.
Question
A whole-system conversion, in which the entire system is installed at one time, is the least common because it is complex and the hardest to understand.
Question
The three key roles in any major organizational change are the sponsor of the change, the change agent, and the potential adopter or target of the change.
Question
When a system is installed sequentially at different locations and there may be a deliberate delay between the first and second installation, the organization is using a phased conversion process.
Question
The simultaneous direct conversion to SAP to replace all of your legacy systems would result in high risk while requiring an enormous amount of time.
Question
The conversion approach that converts all locations at the same time is simultaneous conversion.
Question
The postimplementation activities performed during the refreeze process are system support, project assessment, and change management.
Question
Simultaneous conversion has a higher cost than pilot and phased conversion because more staff are required to support all of the locations.
Question
The conversion location in which one or more locations are selected to test the conversion to the new system prior to full implementation is known as pilot conversion.
Question
Institutionalization refers to using the new system as the normal, accepted, and routine way of performing the business processes.
Question
Most beginning systems analysts and programmers work first on new development projects; usually only after they have gained some experience are they assigned to maintenance projects.
Question
With phased conversion, one or more locations or units / work groups within a location is selected to be converted first as part of a pilot test, and if the system passes the pilot test, then the system is installed at the remaining locations.
Question
The main problem with the parallel conversion method, where the new system is operated side by side with the old system, is the added expense of operating two systems that perform the same function.
Question
It is critical in change management to understand that the real costs and benefits are far more important than the perceived costs and benefits, because people act on what is true, not on what they believe to be true.
Question
Revisions to the management policies and factors that motivate the adoption of the new system are part of the conversion plan.
Question
The technical process during which the new system replaces the old system is called installation.
Question
When an organization chooses to convert the separate and distinct modules of a system one module at a time, the organization is using pilot conversion approach.
Question
The three major steps to the conversion plan before commencement of operations are to install hardware, install software, and convert data; usually these steps must be done sequentially at any one location.
Question
New programmers and systems analysts are typically assigned to work on complex new development projects.
Question
Enhancements suggested by users to make the system easier to use are given higher priority than bug fixes.
Question
Institutionalization refers to establishing formal post implementation deliverables for all projects.
Question
The operations group takes care of system support.
Question
The training delivery method that is most appropriate for a new Executive Information System would be one-on-one training.
Question
Presentations outlining the costs and benefits of the new system do not motivate potential adopters to use the new system, and should not be used as a motivating factor.
Question
The most commonly used approach to delivering training for a new system is computer-based training.
Question
The project team review focuses on the way in which the project team carried out the project activities.
Question
System review attempts to understand whether the implementation of the system resulted in the costs and benefits identified during project initiation.
Question
People assigned to a help desk have very broad computer skills and are able to respond to a wide range of problems.
Question
The potential adopter is the person for whom the new system is designed and built.
Question
The three key post implementation activities are system support, system maintenance, and project assessment.
Question
Helping the users to use the system after installation is called system maintenance.
Question
Management has several tools for structuring organization work processes. Establishing standard operating procedures (SOPs) involves establishing behavioral norms and how processes are actually performed.
Question
The operations group takes care of system maintenance.
Question
Training should focus on everything the new system can do.
Question
The most common source of a change request is from the operations group that identifies bugs in the system.
Question
The project manager is the person who wants the change that a new system brings in an organization.
Question
The highest proportion of potential adopters of a significant organization change will be reluctant adopters.
Question
When selecting a training method the analyst should consider the cost to develop the training program, the cost to deliver the training program, the reach, and the impact.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/116
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 13: Installation and Operations
1
The conversion style that recommends operating the new system along side the old system for a trial period is known as _____.

A) direct
B) parallel
C) phased
D) pilot
E) simultaneous
B
2
The three-stage process for managing organizational change that was developed by Lewin is _____.

A) As-Is system, transition, and To-Be system
B) hold, shuffle, and fold
C) SDLC, RAD, and BPR
D) support, maintain, and assess
E) unfreeze, move, and refreeze
E
3
The installation of SAP to replace all of your legacy systems is an example of what type of conversion?

A) modular
B) phased
C) pilot
D) simultaneous
E) whole system
E
4
The person charged with actually planning and implementing the change necessary to support the implementation of a new system is known as a _____.

A) change agent
B) potential adopter
C) project manager
D) project sponsor
E) systems analyst
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
5
A migration plan contains two major elements. They are _____.

A) challenging and motivation
B) change and assessment
C) conversion and testing
D) supportive and maintenance
E) technical and organizational
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
6
The most important factor associated with successful change is a(n) _____.

A) clear plan for change
B) compelling personal reason to change
C) committed business sponsor
D) demonstrated support by top management
E) management directive
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
7
Training for a business system should focus on _____.

A) all the capabilities of the new system
B) complex computerized modules and code
C) helping the users to accomplish their jobs
D) how to use the system
E) not using the system
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
8
Postimplementation activities include _____.

A) project assessment
B) system maintenance
C) system support
D) system support and system maintenance
E) system support, system maintenance, and project assessment
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
9
Which of the following is included as a basic step in a change management plan?

A) convert data
B) install hardware
C) install software
D) motivate adoption
E) write plan
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
10
Which of the following is the most costly aspect of the installation process?

A) change management
B) conversion
C) maintenance
D) training
E) analysis
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
11
The Deliver-Fast Internet system must be implemented quickly if this new company is to survive. Which conversion style and modules would you recommend?

A) direct and modular
B) direct and whole system
C) parallel and whole system
D) simultaneous and direct
E) simultaneous and whole system
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
12
A system review is typically conducted _____.

A) right after the system is implemented
B) just before the system is implemented
C) during the project initiation phase
D) several months after the system is installed
E) during the project team review
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
13
The conversion strategy that will require the least amount of time is _____.

A) direct conversion of the entire system at all locations simultaneously
B) direct conversion of the system by modules throughout locations in phases
C) parallel conversion of the entire system at all locations simultaneously
D) parallel conversion of the system by modules at all locations simultaneous
E) All are about the same in terms of time
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
14
During a change management process the potential adopters that would readily accept a new system are normally _____%.

A) 5-10
B) 20-30
C) 40-50
D) 50-60
E) 60-70
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
15
Cold turkey, big bang, and abrupt cut-over are alternative names for _____ conversion.

A) direct
B) parallel
C) phased
D) pilot
E) simultaneous
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
16
Install hardware, install software, and convert data are the three steps found in the _____.

A) change management process
B) conversion plan
C) direct conversion activity
D) file and database conversion
E) purchase or rent process
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
17
Tim and Sara need to provide conversion advice to the IAM-POOR company when it converts the concrete manufacturing and mixing computer system. IAM-POOR is looking for a low cost conversion strategy. What conversion modules and style should they recommend?

A) modular and phased
B) pilot and direct
C) pilot and parallel
D) whole system and direct
E) whole system and parallel
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
18
The process of refining the system to make sure that it continues to meet business and organizational needs is called _____.

A) change management
B) project assessment
C) system maintenance
D) system review
E) system support
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
19
When an organization has one or more locations or units within a location converted first, this is called _____ conversion.

A) direct
B) parallel
C) phased
D) pilot
E) simultaneous
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
20
Phil and Maryanne would like to provide conversion advice to the TRI-COL company when it converts the manufacturing and chemical mixing computer system. TRI-COL produces a very dangerous chemical (limit the risk) used to defoliate the rainforest. What conversion location and style should they recommend?

A) direct and parallel
B) modular and pilot
C) parallel and modular
D) phased and pilot
E) pilot and parallel
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
21
Online support, the most common form of on-demand training, includes the documentation and help screens built into the system, as well as separate Web sites that provide answers to frequently asked questions.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
22
Postimplementation activities attempt to _____ the organization after the successful transition to the new system.

A) streamline
B) refreeze
C) down size
D) right size
E) improve
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
23
One of the earliest models for managing organizational change was developed by Kurt Lewin. Lewin argued that change is a three-step process: unfreeze, _________, refreeze.

A) migrate
B) change
C) develop
D) move
E) program
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
24
Change management is the process of helping people to adopt and adapt to the to-be system and its accompanying work processes without undue stress.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
25
Project team review is usually conducted _____.

A) right after the system is implemented
B) just before the system is implemented
C) during the project initiation phase
D) several months after the system is installed
E) during the project team review
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
26
When training users from a collectivistic culture it makes sense to use _____.

A) online support (OLS)
B) frequently asked questions (FAQ)
C) on-demand training (ODT)
D) group-based training
E) computer-based training (CBT)
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
27
If you decide to upgrade, allow yourself at least _____ to test the upgrade on a separate system before you install it.

A) a day
B) a week
C) two weeks
D) a month
E) two months
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
28
Systems analysts examine four important factors when selecting a conversion strategy: risk, cost, communication, and time required.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
29
Direct conversion is the conversion style where both systems (as-is and to-be) are used simultaneously.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
30
APS Systems would like to convert to the new system quickly. The ideal conversion strategy for APS Systems would be a conversion style of parallel and a modular conversion.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
31
Whole system conversion is the conversion location where the separate and distinct modules of the entire system are installed at one time in three or more phases.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
32
Project assessment is not usually performed, yet it can be an important component of organizational learning.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
33
When one or more locations or units within a organization are selected to be converted first as part of a pilot test, this is called phased conversion.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
34
Moving users from the as-is business processes and computer programs to the to-be business processes and programs is called conversion.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
35
There are three key roles in any major organizational change, the sponsor of the change, the change agent, and ___________.

A) potential adopters
B) customers
C) users
D) project mangers
E) vendors
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
36
The sponsor, the change agent, and the potential adopters are the actors found in the change management process.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
37
There are three important factors to consider in selecting a conversion strategy: risk, cost, and _____________.

A) the time required
B) system features
C) infrastructure
D) planning
E) performance
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
38
APS Systems would like to convert to the new system with very little risk. The ideal conversion strategy for APS Systems would be a conversion style of parallel, piloted, and a modular conversion.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
39
If there are many users to train, many organizations turn to _____.

A) online support (OLS)
B) frequently asked questions (FAQ)
C) on-demand training (ODT)
D) classroom training
E) computer-based training (CBT)
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
40
The conversion style is the way in which users are switched between the old and new systems. There are two fundamentally different approaches to the style of conversion: direct conversion and ______________________.

A) indirect conversion
B) parallel conversion
C) phased conversion
D) pilot conversion
E) simultaneous conversion
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
41
Parallel conversion is less risky than direct conversion because it has a greater chance of detecting bugs that have gone undiscovered in testing; pilot conversion is less risky than either phased or simultaneous conversion because if bugs do occur, they occur in only pilot test locations.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
42
Direct conversion, where the new system is turned on and the old system is immediately turned off, is the simplest and most straightforward method, but it is also the most risky because any problems with the new system may seriously disrupt the organization.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
43
When all of the modules of a system are installed at one time, an organization is using whole system conversion.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
44
A whole-system conversion, in which the entire system is installed at one time, is the least common because it is complex and the hardest to understand.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
45
The three key roles in any major organizational change are the sponsor of the change, the change agent, and the potential adopter or target of the change.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
46
When a system is installed sequentially at different locations and there may be a deliberate delay between the first and second installation, the organization is using a phased conversion process.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
47
The simultaneous direct conversion to SAP to replace all of your legacy systems would result in high risk while requiring an enormous amount of time.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
48
The conversion approach that converts all locations at the same time is simultaneous conversion.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
49
The postimplementation activities performed during the refreeze process are system support, project assessment, and change management.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
50
Simultaneous conversion has a higher cost than pilot and phased conversion because more staff are required to support all of the locations.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
51
The conversion location in which one or more locations are selected to test the conversion to the new system prior to full implementation is known as pilot conversion.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
52
Institutionalization refers to using the new system as the normal, accepted, and routine way of performing the business processes.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
53
Most beginning systems analysts and programmers work first on new development projects; usually only after they have gained some experience are they assigned to maintenance projects.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
54
With phased conversion, one or more locations or units / work groups within a location is selected to be converted first as part of a pilot test, and if the system passes the pilot test, then the system is installed at the remaining locations.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
55
The main problem with the parallel conversion method, where the new system is operated side by side with the old system, is the added expense of operating two systems that perform the same function.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
56
It is critical in change management to understand that the real costs and benefits are far more important than the perceived costs and benefits, because people act on what is true, not on what they believe to be true.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
57
Revisions to the management policies and factors that motivate the adoption of the new system are part of the conversion plan.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
58
The technical process during which the new system replaces the old system is called installation.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
59
When an organization chooses to convert the separate and distinct modules of a system one module at a time, the organization is using pilot conversion approach.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
60
The three major steps to the conversion plan before commencement of operations are to install hardware, install software, and convert data; usually these steps must be done sequentially at any one location.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
61
New programmers and systems analysts are typically assigned to work on complex new development projects.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
62
Enhancements suggested by users to make the system easier to use are given higher priority than bug fixes.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
63
Institutionalization refers to establishing formal post implementation deliverables for all projects.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
64
The operations group takes care of system support.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
65
The training delivery method that is most appropriate for a new Executive Information System would be one-on-one training.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
66
Presentations outlining the costs and benefits of the new system do not motivate potential adopters to use the new system, and should not be used as a motivating factor.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
67
The most commonly used approach to delivering training for a new system is computer-based training.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
68
The project team review focuses on the way in which the project team carried out the project activities.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
69
System review attempts to understand whether the implementation of the system resulted in the costs and benefits identified during project initiation.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
70
People assigned to a help desk have very broad computer skills and are able to respond to a wide range of problems.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
71
The potential adopter is the person for whom the new system is designed and built.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
72
The three key post implementation activities are system support, system maintenance, and project assessment.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
73
Helping the users to use the system after installation is called system maintenance.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
74
Management has several tools for structuring organization work processes. Establishing standard operating procedures (SOPs) involves establishing behavioral norms and how processes are actually performed.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
75
The operations group takes care of system maintenance.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
76
Training should focus on everything the new system can do.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
77
The most common source of a change request is from the operations group that identifies bugs in the system.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
78
The project manager is the person who wants the change that a new system brings in an organization.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
79
The highest proportion of potential adopters of a significant organization change will be reluctant adopters.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
80
When selecting a training method the analyst should consider the cost to develop the training program, the cost to deliver the training program, the reach, and the impact.
Unlock Deck
Unlock for access to all 116 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 116 flashcards in this deck.