Deck 1: Projects in Controlled Environments Foundation

Full screen (f)
exit full mode
Question
Which of the following is a principle of PRINCE2?

A)Manage change
B)Manage by stages
C)Manage by tolerance
D)Manage risk
Use Space or
up arrow
down arrow
to flip the card.
Question
Which of the following two roles sit on the project board?
1)Project manager
2)Executive
3)Senior user
4)Project assurance

A)1, 2
B)2, 3
C)1, 4
D)3, 4
Question
Which of the following documents is NOT produced within a PRINCE2 project?

A)Lessons log
B)Project mandate
C)Project manager role description
D)Stage plan
Question
James Kirk is the project manager for a 5-year project, with a time tolerance of +3 months for the current stage. One of his team leaders, Monty Scott, reports a projected problem with a work package that is expected to take an extra 2 weeks. What action should Kirk take?

A)None
B)Produce an Exception Report.
C)Cancel the project.
D)Add an entry to the Risk Register.
Question
Which document defines the acceptance criteria and roles for the project?

A)Project Initiation Document
B)Project Mandate
C)Project Product Description
D)Quality Management Strategy
Question
Which of the following are valid threat responses?
1)Transfer
2)Reject
3)Share
4)Fallback

A)1, 2
B)1, 3
C)1, 2, 3
D)1, 3, 4
Question
Which of the following is NOT a PRINCE2 theme?

A)Continued business justification
B)Progress
C)Organization
D)Plans
Question
Which role maintains the Quality Register?

A)Project Support
B)Project Manager
C)Project Assurance
D)Senior Supplier
Question
Who is responsible for determining the Change Authority and change budget?

A)Corporate or Programme Management
B)Project Manager
C)Project Board
D)Executive
Question
Which document is used to record issues and risks in the Starting up a Project process if the appropriate registers have not yet been created?

A)Lessons Log
B)Daily Log
C)Outline Business Case
D)Project Brief
Question
Which process allows non-PRINCE2 practices to be integrated into a PRINCE2 project environment when creating products?

A)Managing Product Delivery.
B)Controlling a Stage.
C)Directing a Project.
D)Managing a Stage Boundary.
Question
Which of the following are tolerance areas?
1)Change
2)Issues
3)Quality
4)Benefits

A)1,2
B)2,3
C)2,4
D)3,4
Question
Which of the following products are part of the Project Initiation documentation?
1)Quality Management Strategy
2)Project Plan
3)Outline Business Case
4)Communication Management Strategy

A)1, 2
B)2, 3
C)1, 3, 4
D)1, 2, 4
Question
Which of the following statements is true about a PRINCE2 project?

A)It has no products.
B)It has a finite lifespan.
C)It contains responsibilities assigned to specific people.
D)Its objectives can be redefined at any time.
Question
Who can order the closure of a project?

A)Project Manager
B)Project Board
C)Project Assurance
D)Project Support
Question
Which role(s) has/have ultimate authority on the Project Board?

A)Senior Supplier
B)Senior User
C)Executive
D)Joint authority
Question
Which roles must be independent of each other?
1)Team Manager
2)Project Support
3)Project Manager
4)Project Assurance

A)1, 3
B)2, 3
C)2, 4
D)3, 4
Question
Which process provides information to the Project Board to allow them to assess the continuing viability of the project?

A)Controlling a Stage.
B)Directing a Project.
C)Managing a Stage Boundary.
D)Managing Product Delivery.
Question
Which of the following roles can appoint the Project Manager?

A)Executive
B)Senior User
C)Senior Supplier
D)Project Assurance
Question
Which of the following supports the PRINCE2 principle of Management by Exception?

A)Delegation of authority.
B)Creating the Product Flow Diagram.
C)Maintaining the Business Case.
D)Creating a Request for Change.
Question
Which of the following are actions within the recommended risk management procedure?
1)Identify
2)Plan
3)Solve
4)Communicate

A)1, 2
B)1, 3
C)2, 3, 4
D)1, 2, 4
Question
What are the three options specified within a Business Case?
1)Do nothing
2)Do something
3)Do the minimum
4)Follow Program Management recommendations

A)1, 2, 3
B)1, 2, 4
C)2, 3, 4
D)1, 3, 4
Question
Which of the following is NOT a type of Issue?

A)Request for Change
B)Problem/concern
C)Threat
D)Off-specification
Question
Which Stage does PRINCE2 recommend always be used?

A)Initiating a Project.
B)Closing a Project.
C)Starting up a Project.
D)Implementing a Project.
Question
Which of the following statements are true?
1)A project must always be managed
2)A project does not always require a plan
3)A project must have regular meetings throughout the projectlifespan
4)A project has a limited lifespan.

A)1, 3
B)2, 3
C)1, 4
D)1, 2, 4
Question
Which of the following products is NOT related to the PRINCE2 approach to change?

A)Configuration Management Strategy
B)Quality Register
C)Issue Register
D)Daily Log
Question
Which of the following attributes should the project board have?

A)Experience of Quality control.
B)Sufficient authority to allocate resources.
C)Knowledge of PRINCE2.
D)Knowledge of standards applicable to the project.
Question
During which Process is the Work Package status reviewed?

A)Directing a Project.
B)Managing a Stage Boundary.
C)Managing Product Delivery.
D)Controlling a Stage.
Question
In the Quality Audit Trail, Quality Control includes which of the following?
1)Quality Register
2)Acceptance Records
3)Quality and Approval Records
4)Quality Methods

A)1, 2
B)1, 3, 4
C)1, 2, 3
D)1, 2, 3, 4
Question
Which of the following products is NOT created during the Initiating a Project process?

A)Quality Management Strategy
B)Lessons Log
C)Project Product Description
D)Exception Plan
Question
Which of the following are fields in the Quality Register?
1)Product identifier(s)
2)Roles and responsibilities
3)Reporting
4)Quality records

A)1 and 4
B)1, 3, and 4
C)1, 2, and 4
D)1, 2, 3, and 4
Question
In which of the following reports are risks communicated?
1)Checkpoint Reports
2)Highlight Reports
3)Lessons Reports
4)End Project Reports

A)1, 2
B)1, 3
C)1, 2, 3
D)1, 2, 3, 4
Question
Which of the following activities is one of the responsibilities of a Team Manager?

A)Liaise with any Project Assurance and Project Support roles
B)Maintain the Issues Register
C)Authorize Work Packages
D)Assist the Project Manager in developing the Business Case
Question
When a work package is returned, which of the following actions does PRINCE2 recommend?
1)Notify the Project Board
2)Update the Team Plan
3)Review the Approval Records
4)Update the Stage Plan

A)1 and 2
B)2 and 3
C)1, 2, and 3
D)1, 3, and 4
Question
Which role has the responsibility of setting project tolerances?

A)Corporate or Programme Management
B)Executive
C)Project Manager
D)Project Board
Question
What does it mean to tailor PRINCE2 to the project environment?
1)Some elements of PRINCE2 should be omitted
2)The principles should be adapted depending on the environment
3)The methods should be adapted to suit the circumstances
4)Blind obedience to project processes should be avoided

A)1 and 2
B)2 and 3
C)1 and 4
D)3 and 4
Question
Who is responsible for communicating with stakeholders?

A)Executive
B)Senior User
C)Project Manager
D)Project Board
Question
At what point is the Stage Plan produced?

A)During the Stage Boundary
B)Starting up a Project
C)Near the end of the previous stage
D)Managing Product Delivery
Question
What should a Project Manager do when a stage tolerance is forecast to be exceeded?

A)Create an Exception Report
B)Recommend closing the project
C)Add an entry to the Daily Log
D)Update the Stage Plan
Question
What is the PRINCE2 term for a deliverable?

A)Item
B)Process
C)Product
D)Work Package
Question
Which process can be carried out without using PRINCE2?

A)Directing a Project.
B)Starting up a Project.
C)Managing Product Delivery.
D)Closing a Project.
Question
Which of the following is part of the PRINCE2 product based planning approach?

A)Ensure each product has a Configuration Item record.
B)Create the products.
C)Test the products.
D)Create the Product Breakdown Structure.
Question
During which process is a Checkpoint Report produced?

A)Managing Product Delivery
B)Controlling a Stage
C)Managing a Stage Boundary
D)Directing a Project
Question
Which PRINCE2 theme is one of the few to provide techniques?

A)Planning
B)Risk
C)Organisation
D)Progress
Question
Which of the following are valid responses to a Request for Change?
1)Approve the change
2)Defer decision
3)Increase the tolerances
4)Ask for an exception plan

A)1, 2
B)1, 2, 4
C)2, 3, 4
D)1, 2, 3, 4
Question
Is it possible to change a Product Description once it has been approved?

A)Yes, but only if the Project Manager deems it necessary.
B)Yes, but only if the Project Board approves the change.
C)Yes, but only via change control.
D)No.
Question
To which section of the Quality Management Strategy does the assignment of the Project Manager role belong?

A)Roles and responsibilities
B)Quality planning
C)Quality assurance
D)This is not part of the Quality Management Strategy.
Question
As part of which process are decisions made regarding stage tolerance exceptions?

A)Directing a Project
B)Managing Stage Boundaries
C)Controlling a Stage
D)Managing Product Delivery
Question
Which of the following statements is true?

A)Management stages and technical stages must always be aligned.
B)Technical stages may not overlap.
C)Management stages may overlap.
D)Technical stages may span a management stage boundary.
Question
The Project Brief is assembled in which process?

A)Starting up a Project
B)Initiating a Project
C)Directing a Project
D)Controlling a Stage
Question
Which of the following roles must be mutually exclusive according to PRINCE2?
1)Executive
2)Project Manager
3)Project Assurance
4)Project Support

A)1, 2
B)2, 3
C)2, 4
D)3, 4
Question
Which role is responsible for committing supplier resources to the Stage Plans?

A)Executive
B)Senior Supplier
C)Project Manager
D)Corporate or Programme Management
Question
What are the two types of progress controls provided by PRINCE2?
1)Stage-driven
2)Tolerance-driven
3)Time-driven
4)Event-driven

A)1, 2
B)1, 4
C)2, 3
D)3, 4
Question
Identifying a plan's critical path allows the Project Manager to monitor the activities that:
1)Must be completed on time if the whole plan is to be finished on schedule
2)Can be omitted if time tolerances are exceeded
3)Are not allowed any time tolerance
4)Can be delayed for a while if resources become tight

A)1, 2
B)2, 3
C)1, 4
D)3, 4
Question
Which role is responsible for defining the role descriptions within the project?

A)Corporate or Programme Management
B)Executive
C)Project Manager
D)Project Support
Question
At what point is a Stage Plan updated with actuals?

A)During the Managing a Stage Boundary process.
B)As soon as actuals are received from a Work Package.
C)Once a Work Package has been delivered.
D)Once a Work Package has been approved.
Question
There are at least how many valid business cases within the commercial context of any project?

A)0
B)1
C)2
D)3
Question
Which of the true is following about projects?
1)They are driven by deliverables
2)They have finite timescales
3)They involve changes to the business capability
4)They have benefits that are usually realized after project closure

A)1, 2
B)1, 2, 3
C)2, 3, 4
D)1, 2, 4
Question
Product Descriptions are contained within which other product?

A)Project Brief
B)Project Initiation Documentation
C)Stage Plan
D)Benefits Review Plan
Question
The Product Description includes:
1)Composition
2)Format and Presentation
3)Quality Responsibilities
4)Item Attributes

A)1, 2, 3
B)2, 3, 4
C)1, 2, 4
D)1, 2, 3, 4
Question
It is the responsibility of which role to review risk management practices and ensure that they are performed in line with the project's Risk Management Strategy?

A)Project Assurance
B)Project Manager
C)Project Support
D)Executive
Question
A Risk Cause is which of the following?

A)A threat
B)Description of the source of the risk
C)An objective
D)A risk budget
Question
Which role confirms acceptance of the Project Product?

A)Project Assurance
B)Corporate or Programme Management
C)Project Manager
D)Executive
Question
Follow on action recommendations are made in which process?

A)Starting up a Project
B)Directing a Project
C)Closing a Project
D)Managing a Stage Boundary
Question
Which of the following is NOT included in a plan?

A)Dependencies
B)Budgets
C)Schedule
D)Lessons learned
Question
Which document contains the planned and actual dates for product approval and hand-over?

A)Project Plan
B)Stage Plan
C)Product Checklist
D)Project Brief
Question
A successful project is which of the following?

A)Output-oriented, not activity-oriented.
B)Completed within the original timeframe.
C)One which involves no change.
D)Delivered under budget.
Question
Which role confirms stage and project progress against agreed tolerances?

A)Project Board
B)Project Assurance
C)Project Support
D)Project Manager
Question
Which of the following is NOT a PRINCE2 process?

A)Directing a Project
B)Assessing a Project
C)Controlling a Stage
D)Closing a Project
Question
Which PRINCE2 theme addresses the ongoing viability of the different project plans?

A)Quality
B)Plans
C)Change
D)Progress
Question
Which of the following risk responses involves allowing a third party to take on part of the risk?

A)Reduce
B)Avoid
C)Share
D)Transfer
Question
Which role is responsible for producing a Product Status Account?

A)Project Support
B)Project Manager
C)Project Assurance
D)Team Manager
Question
The PRINCE2 Quality theme ensures that the projects products:
1)Meet business expectations
2)Are delivered on time
3)Are defined correctly
4)Enable the desired benefits to be achieved subsequently

A)1, 3
B)1, 4
C)3, 4
D)1, 2, 4
Question
Which role is responsible for defining and verifying user requirements and expectations?

A)Executive
B)Senior User
C)Project Assurance
D)Team Manager
Question
Which of the following is true about stakeholders?
1)They may support or oppose the project
2)They may gain or lose as a result of the project delivery
3)They may actively support or block the project
4)They have a financial interest in the project

A)1, 2, 3
B)1, 3, 4
C)2, 3, 4
D)1, 2, 3, 4
Question
Which of the following should always be taken into account when defining the number and length of stages?
1)The project budget
2)Where the key decision points need to be
3)The amount of risk
4)The confidence levels of the Project Manager and Project Board

A)1, 2, 3, 4
B)1, 2, 3
C)2, 3, 4
D)1, 2, 4
Question
The principle of Learning from Experience dictates that everybody involved with the project should examine any lessons learned:
1)When starting a project
2)As the project is in progress
3)When closing a project
4)After the project has closed

A)1, 3
B)1, 2, 3
C)1, 3, 4
D)4
Question
Which is longer, the product life span or the project life cycle?

A)The product life span.
B)The project life cycle.
C)They are the same.
D)It varies according the projects place in the corporate strategy.
Question
If there is more than one version of a document in circulation, what action should the Project Manager take?

A)Create a new version of the document and issue it to everybody.
B)Halt work until the correct version can be identified.
C)Recall all versions of the document.
D)Request a Product Status Account.
Question
When a project is closed, all project information is secured and archived. Why?

A)To allow for future audits.
B)Because project information should never be discarded.
C)In case Corporate or Programme Management wants to review the information.
D)In case the project needs to be re-opened.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/99
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 1: Projects in Controlled Environments Foundation
1
Which of the following is a principle of PRINCE2?

A)Manage change
B)Manage by stages
C)Manage by tolerance
D)Manage risk
Manage by stages
2
Which of the following two roles sit on the project board?
1)Project manager
2)Executive
3)Senior user
4)Project assurance

A)1, 2
B)2, 3
C)1, 4
D)3, 4
2, 3
3
Which of the following documents is NOT produced within a PRINCE2 project?

A)Lessons log
B)Project mandate
C)Project manager role description
D)Stage plan
Project mandate
4
James Kirk is the project manager for a 5-year project, with a time tolerance of +3 months for the current stage. One of his team leaders, Monty Scott, reports a projected problem with a work package that is expected to take an extra 2 weeks. What action should Kirk take?

A)None
B)Produce an Exception Report.
C)Cancel the project.
D)Add an entry to the Risk Register.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
5
Which document defines the acceptance criteria and roles for the project?

A)Project Initiation Document
B)Project Mandate
C)Project Product Description
D)Quality Management Strategy
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
6
Which of the following are valid threat responses?
1)Transfer
2)Reject
3)Share
4)Fallback

A)1, 2
B)1, 3
C)1, 2, 3
D)1, 3, 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
7
Which of the following is NOT a PRINCE2 theme?

A)Continued business justification
B)Progress
C)Organization
D)Plans
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
8
Which role maintains the Quality Register?

A)Project Support
B)Project Manager
C)Project Assurance
D)Senior Supplier
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
9
Who is responsible for determining the Change Authority and change budget?

A)Corporate or Programme Management
B)Project Manager
C)Project Board
D)Executive
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
10
Which document is used to record issues and risks in the Starting up a Project process if the appropriate registers have not yet been created?

A)Lessons Log
B)Daily Log
C)Outline Business Case
D)Project Brief
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
11
Which process allows non-PRINCE2 practices to be integrated into a PRINCE2 project environment when creating products?

A)Managing Product Delivery.
B)Controlling a Stage.
C)Directing a Project.
D)Managing a Stage Boundary.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
12
Which of the following are tolerance areas?
1)Change
2)Issues
3)Quality
4)Benefits

A)1,2
B)2,3
C)2,4
D)3,4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
13
Which of the following products are part of the Project Initiation documentation?
1)Quality Management Strategy
2)Project Plan
3)Outline Business Case
4)Communication Management Strategy

A)1, 2
B)2, 3
C)1, 3, 4
D)1, 2, 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
14
Which of the following statements is true about a PRINCE2 project?

A)It has no products.
B)It has a finite lifespan.
C)It contains responsibilities assigned to specific people.
D)Its objectives can be redefined at any time.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
15
Who can order the closure of a project?

A)Project Manager
B)Project Board
C)Project Assurance
D)Project Support
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
16
Which role(s) has/have ultimate authority on the Project Board?

A)Senior Supplier
B)Senior User
C)Executive
D)Joint authority
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
17
Which roles must be independent of each other?
1)Team Manager
2)Project Support
3)Project Manager
4)Project Assurance

A)1, 3
B)2, 3
C)2, 4
D)3, 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
18
Which process provides information to the Project Board to allow them to assess the continuing viability of the project?

A)Controlling a Stage.
B)Directing a Project.
C)Managing a Stage Boundary.
D)Managing Product Delivery.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
19
Which of the following roles can appoint the Project Manager?

A)Executive
B)Senior User
C)Senior Supplier
D)Project Assurance
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
20
Which of the following supports the PRINCE2 principle of Management by Exception?

A)Delegation of authority.
B)Creating the Product Flow Diagram.
C)Maintaining the Business Case.
D)Creating a Request for Change.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
21
Which of the following are actions within the recommended risk management procedure?
1)Identify
2)Plan
3)Solve
4)Communicate

A)1, 2
B)1, 3
C)2, 3, 4
D)1, 2, 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
22
What are the three options specified within a Business Case?
1)Do nothing
2)Do something
3)Do the minimum
4)Follow Program Management recommendations

A)1, 2, 3
B)1, 2, 4
C)2, 3, 4
D)1, 3, 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
23
Which of the following is NOT a type of Issue?

A)Request for Change
B)Problem/concern
C)Threat
D)Off-specification
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
24
Which Stage does PRINCE2 recommend always be used?

A)Initiating a Project.
B)Closing a Project.
C)Starting up a Project.
D)Implementing a Project.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following statements are true?
1)A project must always be managed
2)A project does not always require a plan
3)A project must have regular meetings throughout the projectlifespan
4)A project has a limited lifespan.

A)1, 3
B)2, 3
C)1, 4
D)1, 2, 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
26
Which of the following products is NOT related to the PRINCE2 approach to change?

A)Configuration Management Strategy
B)Quality Register
C)Issue Register
D)Daily Log
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
27
Which of the following attributes should the project board have?

A)Experience of Quality control.
B)Sufficient authority to allocate resources.
C)Knowledge of PRINCE2.
D)Knowledge of standards applicable to the project.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
28
During which Process is the Work Package status reviewed?

A)Directing a Project.
B)Managing a Stage Boundary.
C)Managing Product Delivery.
D)Controlling a Stage.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
29
In the Quality Audit Trail, Quality Control includes which of the following?
1)Quality Register
2)Acceptance Records
3)Quality and Approval Records
4)Quality Methods

A)1, 2
B)1, 3, 4
C)1, 2, 3
D)1, 2, 3, 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
30
Which of the following products is NOT created during the Initiating a Project process?

A)Quality Management Strategy
B)Lessons Log
C)Project Product Description
D)Exception Plan
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
31
Which of the following are fields in the Quality Register?
1)Product identifier(s)
2)Roles and responsibilities
3)Reporting
4)Quality records

A)1 and 4
B)1, 3, and 4
C)1, 2, and 4
D)1, 2, 3, and 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
32
In which of the following reports are risks communicated?
1)Checkpoint Reports
2)Highlight Reports
3)Lessons Reports
4)End Project Reports

A)1, 2
B)1, 3
C)1, 2, 3
D)1, 2, 3, 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
33
Which of the following activities is one of the responsibilities of a Team Manager?

A)Liaise with any Project Assurance and Project Support roles
B)Maintain the Issues Register
C)Authorize Work Packages
D)Assist the Project Manager in developing the Business Case
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
34
When a work package is returned, which of the following actions does PRINCE2 recommend?
1)Notify the Project Board
2)Update the Team Plan
3)Review the Approval Records
4)Update the Stage Plan

A)1 and 2
B)2 and 3
C)1, 2, and 3
D)1, 3, and 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
35
Which role has the responsibility of setting project tolerances?

A)Corporate or Programme Management
B)Executive
C)Project Manager
D)Project Board
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
36
What does it mean to tailor PRINCE2 to the project environment?
1)Some elements of PRINCE2 should be omitted
2)The principles should be adapted depending on the environment
3)The methods should be adapted to suit the circumstances
4)Blind obedience to project processes should be avoided

A)1 and 2
B)2 and 3
C)1 and 4
D)3 and 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
37
Who is responsible for communicating with stakeholders?

A)Executive
B)Senior User
C)Project Manager
D)Project Board
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
38
At what point is the Stage Plan produced?

A)During the Stage Boundary
B)Starting up a Project
C)Near the end of the previous stage
D)Managing Product Delivery
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
39
What should a Project Manager do when a stage tolerance is forecast to be exceeded?

A)Create an Exception Report
B)Recommend closing the project
C)Add an entry to the Daily Log
D)Update the Stage Plan
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
40
What is the PRINCE2 term for a deliverable?

A)Item
B)Process
C)Product
D)Work Package
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
41
Which process can be carried out without using PRINCE2?

A)Directing a Project.
B)Starting up a Project.
C)Managing Product Delivery.
D)Closing a Project.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
42
Which of the following is part of the PRINCE2 product based planning approach?

A)Ensure each product has a Configuration Item record.
B)Create the products.
C)Test the products.
D)Create the Product Breakdown Structure.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
43
During which process is a Checkpoint Report produced?

A)Managing Product Delivery
B)Controlling a Stage
C)Managing a Stage Boundary
D)Directing a Project
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
44
Which PRINCE2 theme is one of the few to provide techniques?

A)Planning
B)Risk
C)Organisation
D)Progress
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
45
Which of the following are valid responses to a Request for Change?
1)Approve the change
2)Defer decision
3)Increase the tolerances
4)Ask for an exception plan

A)1, 2
B)1, 2, 4
C)2, 3, 4
D)1, 2, 3, 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
46
Is it possible to change a Product Description once it has been approved?

A)Yes, but only if the Project Manager deems it necessary.
B)Yes, but only if the Project Board approves the change.
C)Yes, but only via change control.
D)No.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
47
To which section of the Quality Management Strategy does the assignment of the Project Manager role belong?

A)Roles and responsibilities
B)Quality planning
C)Quality assurance
D)This is not part of the Quality Management Strategy.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
48
As part of which process are decisions made regarding stage tolerance exceptions?

A)Directing a Project
B)Managing Stage Boundaries
C)Controlling a Stage
D)Managing Product Delivery
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
49
Which of the following statements is true?

A)Management stages and technical stages must always be aligned.
B)Technical stages may not overlap.
C)Management stages may overlap.
D)Technical stages may span a management stage boundary.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
50
The Project Brief is assembled in which process?

A)Starting up a Project
B)Initiating a Project
C)Directing a Project
D)Controlling a Stage
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
51
Which of the following roles must be mutually exclusive according to PRINCE2?
1)Executive
2)Project Manager
3)Project Assurance
4)Project Support

A)1, 2
B)2, 3
C)2, 4
D)3, 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
52
Which role is responsible for committing supplier resources to the Stage Plans?

A)Executive
B)Senior Supplier
C)Project Manager
D)Corporate or Programme Management
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
53
What are the two types of progress controls provided by PRINCE2?
1)Stage-driven
2)Tolerance-driven
3)Time-driven
4)Event-driven

A)1, 2
B)1, 4
C)2, 3
D)3, 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
54
Identifying a plan's critical path allows the Project Manager to monitor the activities that:
1)Must be completed on time if the whole plan is to be finished on schedule
2)Can be omitted if time tolerances are exceeded
3)Are not allowed any time tolerance
4)Can be delayed for a while if resources become tight

A)1, 2
B)2, 3
C)1, 4
D)3, 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
55
Which role is responsible for defining the role descriptions within the project?

A)Corporate or Programme Management
B)Executive
C)Project Manager
D)Project Support
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
56
At what point is a Stage Plan updated with actuals?

A)During the Managing a Stage Boundary process.
B)As soon as actuals are received from a Work Package.
C)Once a Work Package has been delivered.
D)Once a Work Package has been approved.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
57
There are at least how many valid business cases within the commercial context of any project?

A)0
B)1
C)2
D)3
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
58
Which of the true is following about projects?
1)They are driven by deliverables
2)They have finite timescales
3)They involve changes to the business capability
4)They have benefits that are usually realized after project closure

A)1, 2
B)1, 2, 3
C)2, 3, 4
D)1, 2, 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
59
Product Descriptions are contained within which other product?

A)Project Brief
B)Project Initiation Documentation
C)Stage Plan
D)Benefits Review Plan
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
60
The Product Description includes:
1)Composition
2)Format and Presentation
3)Quality Responsibilities
4)Item Attributes

A)1, 2, 3
B)2, 3, 4
C)1, 2, 4
D)1, 2, 3, 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
61
It is the responsibility of which role to review risk management practices and ensure that they are performed in line with the project's Risk Management Strategy?

A)Project Assurance
B)Project Manager
C)Project Support
D)Executive
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
62
A Risk Cause is which of the following?

A)A threat
B)Description of the source of the risk
C)An objective
D)A risk budget
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
63
Which role confirms acceptance of the Project Product?

A)Project Assurance
B)Corporate or Programme Management
C)Project Manager
D)Executive
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
64
Follow on action recommendations are made in which process?

A)Starting up a Project
B)Directing a Project
C)Closing a Project
D)Managing a Stage Boundary
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
65
Which of the following is NOT included in a plan?

A)Dependencies
B)Budgets
C)Schedule
D)Lessons learned
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
66
Which document contains the planned and actual dates for product approval and hand-over?

A)Project Plan
B)Stage Plan
C)Product Checklist
D)Project Brief
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
67
A successful project is which of the following?

A)Output-oriented, not activity-oriented.
B)Completed within the original timeframe.
C)One which involves no change.
D)Delivered under budget.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
68
Which role confirms stage and project progress against agreed tolerances?

A)Project Board
B)Project Assurance
C)Project Support
D)Project Manager
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
69
Which of the following is NOT a PRINCE2 process?

A)Directing a Project
B)Assessing a Project
C)Controlling a Stage
D)Closing a Project
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
70
Which PRINCE2 theme addresses the ongoing viability of the different project plans?

A)Quality
B)Plans
C)Change
D)Progress
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
71
Which of the following risk responses involves allowing a third party to take on part of the risk?

A)Reduce
B)Avoid
C)Share
D)Transfer
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
72
Which role is responsible for producing a Product Status Account?

A)Project Support
B)Project Manager
C)Project Assurance
D)Team Manager
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
73
The PRINCE2 Quality theme ensures that the projects products:
1)Meet business expectations
2)Are delivered on time
3)Are defined correctly
4)Enable the desired benefits to be achieved subsequently

A)1, 3
B)1, 4
C)3, 4
D)1, 2, 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
74
Which role is responsible for defining and verifying user requirements and expectations?

A)Executive
B)Senior User
C)Project Assurance
D)Team Manager
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
75
Which of the following is true about stakeholders?
1)They may support or oppose the project
2)They may gain or lose as a result of the project delivery
3)They may actively support or block the project
4)They have a financial interest in the project

A)1, 2, 3
B)1, 3, 4
C)2, 3, 4
D)1, 2, 3, 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
76
Which of the following should always be taken into account when defining the number and length of stages?
1)The project budget
2)Where the key decision points need to be
3)The amount of risk
4)The confidence levels of the Project Manager and Project Board

A)1, 2, 3, 4
B)1, 2, 3
C)2, 3, 4
D)1, 2, 4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
77
The principle of Learning from Experience dictates that everybody involved with the project should examine any lessons learned:
1)When starting a project
2)As the project is in progress
3)When closing a project
4)After the project has closed

A)1, 3
B)1, 2, 3
C)1, 3, 4
D)4
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
78
Which is longer, the product life span or the project life cycle?

A)The product life span.
B)The project life cycle.
C)They are the same.
D)It varies according the projects place in the corporate strategy.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
79
If there is more than one version of a document in circulation, what action should the Project Manager take?

A)Create a new version of the document and issue it to everybody.
B)Halt work until the correct version can be identified.
C)Recall all versions of the document.
D)Request a Product Status Account.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
80
When a project is closed, all project information is secured and archived. Why?

A)To allow for future audits.
B)Because project information should never be discarded.
C)In case Corporate or Programme Management wants to review the information.
D)In case the project needs to be re-opened.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 99 flashcards in this deck.