The specs for the Lake House indicates that the ____ shall keep the excavation and the basement free from water at all times.

A) subcontractor
B) contractor
C) architect
D) engineer
Use Space or
up arrow
down arrow
to flip the card.
Question
____ for concrete shall consist of natural sand having clean, hard, sharp, uncoated grains free from injurious amounts of dust, lumps, soft or flaky particles, shale, alkali, organic matter, loam, or other deleterious substances.

A) Coarse aggregates
B) Portland cement
C) Fine aggregates
D) Reinforcement
Question
Construction drawings provide ample information about how a building is to be constructed.
Question
It is always practical to indicate who is responsible for clean-up after construction is finished.
Question
All reinforcing shall conform to ASTM A-615, Grade 60.
Question
Often for single-family homes all of the necessary technical information is conveyed on the drawings.
Question
The Lake House Specifications printed in Unit 33 of the textbook are necessary to answer these questions The specs for the Lake House indicate that the ____ will have continual supervisory responsibility for this job.

A) contractor
B) subcontractor
C) architect
D) engineer
Question
The specs for the Lake House indicate that the ____ shall maintain all temporary toilet facilities in a sanitary condition.

A) contractor
B) subcontractor
C) architect
D) engineer
Question
____ shall consist of crushed stone or gravel having clean, hard, strong, durable, uncoated particles, free from injurious amounts of soft, friable, thin, elongated or laminated pieces, alkali, organic, or other deleterious matter.

A) Portland cement
B) Coarse aggregates
C) Fine aggregates
D) Reinforcement
Question
The contractor shall notify the ____ when the excavation is complete so that he may inspect all soil before the concrete is placed.

A) engineer
B) owner
C) designer
D) architect
Question
Unless otherwise directed by the architect, no backfill shall be placed before the ____ framing is in place.

A) roof
B) basement
C) second floor
D) first floor
Question
All concrete is to be machine mixed in an approved mixer with a water metering device. Concrete is to reach a compressive strength of 2500 psi after ____ days.

A) 14
B) 21
C) 25
D) 28
Question
To make it easier to find information, specification writers for large commercial construction projects follow the CSI format for organizing their specs.
Question
The format of the specs for the Lake House is an adaptation of the ____ format .

A) ACO
B) CSA
C) ABA
D) CSI
Question
It is always practical to show the grade of lumber to be used for roof framing.
Question
To make it easier to find information specification, writers follow the Construction Specifications Institute's ____ for organizing their specs.

A) MasterFormat
B) Building Code
C) Specs Format
D) Specs Code
Question
All outside walls shall be backfilled to within ____ inches of the finished grade with clean fill.

A) 6
B) 7
C) 8
D) 9
Question
____ drawings provide information about the positions and sizes of the parts and materials to be used.

A) Site
B) Construction
C) Material
D) Perspective
Question
Mortar used for laying brick and concrete block shall consist of (2) parts masonry cement to (3) parts sand.
Question
____ standardizes titles and section numbers for organizing data about construction requirements, products, and activities.

A) Specs Format
B) Building Code
C) MasterFormat
D) Specs Code
Question
Moisture content shall not exceed 19% for framing lumber, ____ for plywood, and 8% for finish millwork.

A) 12%
B) 15%
C) 18%
D) 20%
Question
Wire mesh reinforcing shall have a minimum ultimate tensile strength of ______________ psi and conform to ASTM specifications A-185, latest edition.

A) 40 , 000
B) 50 , 000
C) 60 , 000
D) 70 , 000
Question
Plywood shall conform to U.S. Product Standards ____ and shall be branded or stamped with type and grade.

A) PS-64
B) PS-65
C) PS-66
D) PS-67
Question
____ are emitted as gases from certain solids or liquids.

A) Organic material vapors (OMVs)
B) Volatile organic compounds (VOCs)
C) Natural vapors (NVs)
D) Organic compound odors (OCOs)
Question
Upon completion all brickwork shall be thoroughly cleaned with ____ and stiff fiber brushes and then rinsed with clean water.

A) acids
B) clean water
C) detergent
D) alcohol
Question
In ____________ carpentry all rabbets, splines, ploughs, and other cuts as detailed or required for neat, solid, fitting and joining shall be provided.

A) rough
B) finish
C) both A and B
D) None of these are correct
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/26
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 33: Lake House Specifications
1
The specs for the Lake House indicates that the ____ shall keep the excavation and the basement free from water at all times.

A) subcontractor
B) contractor
C) architect
D) engineer
B
2
____ for concrete shall consist of natural sand having clean, hard, sharp, uncoated grains free from injurious amounts of dust, lumps, soft or flaky particles, shale, alkali, organic matter, loam, or other deleterious substances.

A) Coarse aggregates
B) Portland cement
C) Fine aggregates
D) Reinforcement
C
3
Construction drawings provide ample information about how a building is to be constructed.
True
4
It is always practical to indicate who is responsible for clean-up after construction is finished.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
5
All reinforcing shall conform to ASTM A-615, Grade 60.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
6
Often for single-family homes all of the necessary technical information is conveyed on the drawings.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
7
The Lake House Specifications printed in Unit 33 of the textbook are necessary to answer these questions The specs for the Lake House indicate that the ____ will have continual supervisory responsibility for this job.

A) contractor
B) subcontractor
C) architect
D) engineer
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
8
The specs for the Lake House indicate that the ____ shall maintain all temporary toilet facilities in a sanitary condition.

A) contractor
B) subcontractor
C) architect
D) engineer
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
9
____ shall consist of crushed stone or gravel having clean, hard, strong, durable, uncoated particles, free from injurious amounts of soft, friable, thin, elongated or laminated pieces, alkali, organic, or other deleterious matter.

A) Portland cement
B) Coarse aggregates
C) Fine aggregates
D) Reinforcement
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
10
The contractor shall notify the ____ when the excavation is complete so that he may inspect all soil before the concrete is placed.

A) engineer
B) owner
C) designer
D) architect
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
11
Unless otherwise directed by the architect, no backfill shall be placed before the ____ framing is in place.

A) roof
B) basement
C) second floor
D) first floor
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
12
All concrete is to be machine mixed in an approved mixer with a water metering device. Concrete is to reach a compressive strength of 2500 psi after ____ days.

A) 14
B) 21
C) 25
D) 28
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
13
To make it easier to find information, specification writers for large commercial construction projects follow the CSI format for organizing their specs.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
14
The format of the specs for the Lake House is an adaptation of the ____ format .

A) ACO
B) CSA
C) ABA
D) CSI
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
15
It is always practical to show the grade of lumber to be used for roof framing.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
16
To make it easier to find information specification, writers follow the Construction Specifications Institute's ____ for organizing their specs.

A) MasterFormat
B) Building Code
C) Specs Format
D) Specs Code
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
17
All outside walls shall be backfilled to within ____ inches of the finished grade with clean fill.

A) 6
B) 7
C) 8
D) 9
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
18
____ drawings provide information about the positions and sizes of the parts and materials to be used.

A) Site
B) Construction
C) Material
D) Perspective
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
19
Mortar used for laying brick and concrete block shall consist of (2) parts masonry cement to (3) parts sand.
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
20
____ standardizes titles and section numbers for organizing data about construction requirements, products, and activities.

A) Specs Format
B) Building Code
C) MasterFormat
D) Specs Code
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
21
Moisture content shall not exceed 19% for framing lumber, ____ for plywood, and 8% for finish millwork.

A) 12%
B) 15%
C) 18%
D) 20%
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
22
Wire mesh reinforcing shall have a minimum ultimate tensile strength of ______________ psi and conform to ASTM specifications A-185, latest edition.

A) 40 , 000
B) 50 , 000
C) 60 , 000
D) 70 , 000
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
23
Plywood shall conform to U.S. Product Standards ____ and shall be branded or stamped with type and grade.

A) PS-64
B) PS-65
C) PS-66
D) PS-67
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
24
____ are emitted as gases from certain solids or liquids.

A) Organic material vapors (OMVs)
B) Volatile organic compounds (VOCs)
C) Natural vapors (NVs)
D) Organic compound odors (OCOs)
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
25
Upon completion all brickwork shall be thoroughly cleaned with ____ and stiff fiber brushes and then rinsed with clean water.

A) acids
B) clean water
C) detergent
D) alcohol
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
26
In ____________ carpentry all rabbets, splines, ploughs, and other cuts as detailed or required for neat, solid, fitting and joining shall be provided.

A) rough
B) finish
C) both A and B
D) None of these are correct
Unlock Deck
Unlock for access to all 26 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 26 flashcards in this deck.