Which of the following occurs when one activity in a project has led to another that was not originally planned; thus, the scope of the project has grown?

A) scope creep
B) dynamic change
C) project growth
D) task slippage
Use Space or
up arrow
down arrow
to flip the card.
Question
With which of the following does the vendor select the product(s) that meets specified requirements and then quotes the prices?

A) request for quotation (RFQ)
B) request for system services (RFSS)
C) request for information (RFI)
D) request for proposal (RFP)
Question
In large companies, users write a formal request for a new or modified information system, which is called which of the following?

A) system demand
B) IS need
C) project request
D) corporate requirement
Question
Which of the following measures how well a proposed system will work?

A) Operational feasibility
B) Technical feasibility
C) Schedule feasibility
D) Economic feasibility
Question
Which of the following identifies the product(s) a systems analyst wants from a vendor?

A) request for quotation (RFQ)
B) request for system services (RFSS)
C) request for information (RFI)
D) request for proposal (RFP)
Question
In sequence, traditional system development contains five phases. What are they?

A) planning, analysis, design, implementation, support and security
B) analysis, implementation, support and security, design, planning
C) support and security, design, planning, analysis, implementation
D) implementation, analysis, support and security, planning, design
Question
Which of the following is an advantage of custom software?

A) It matches an organization's requirements exactly.
B) It is less expensive and takes less time to design and implement than packaged software.
C) It is mass produced, copyrighted, prewritten, and available for purchase.
D) All of the above.
Question
<strong>  As shown in the accompanying figure, a Gantt chart, developed by Henry Gantt, is which of the following?</strong> A) diagram that graphically shows how actors interact with an information system B) tool that graphically shows the flow of data in a system C) bar chart that uses horizontal bars to show project phases or activities D) table that lists a variety of conditions and the actions that correspond to them <div style=padding-top: 35px> As shown in the accompanying figure, a Gantt chart, developed by Henry Gantt, is which of the following?

A) diagram that graphically shows how actors interact with an information system
B) tool that graphically shows the flow of data in a system
C) bar chart that uses horizontal bars to show project phases or activities
D) table that lists a variety of conditions and the actions that correspond to them
Question
Which of the following is a set of phases that developers use to build an information system?

A) information system production process
B) information systems synthesis
C) system development life cycle
D) system development production process
Question
Which of the following phases consists of two major activities: (1) if necessary, acquire hardware and software and (2) develop all of the details of the new or modified information system?

A) analytical
B) planning
C) design
D) operational
Question
Which of the following is any tangible item such as a chart, diagram, report, or program file?

A) object
B) entity
C) deliverable
D) source
Question
One member of the project team manages and controls the budget and schedule of the project. What is the name for this role?

A) leader
B) comptroller
C) assistant
D) analyst
Question
Which of the following roles is responsible for designing and developing an information system?

A) manager
B) coordinator
C) analyst
D) developer
Question
Many VARs (value-added resellers) provide complete systems. These also are known as which of the following?

A) final solutions
B) turnkey solutions
C) solid solutions
D) ultimate solutions
Question
Which of the following general guidelines should system development NOT follow?

A) group tasks into phases
B) repeat tasks intermittently
C) involve the users
D) define standards
Question
Which of the following has as its purpose the assessment of the feasibility of each alternative solution and then recommend the most feasible solution for a project?

A) software
B) proposal
C) sourcing
D) map
Question
Companies can develop software in-house using their own IT personnel or they can have an outside source develop it for them. What is the term for the latter option?

A) fast-tracking
B) development sharing
C) externalization
D) outsourcing
Question
Which of the following is a less formal method that uses a standard form to request information about a product or service?

A) request for quotation (RFQ)
B) request for system services (RFSS)
C) request for proposal (RFP)
D) request for information (RFI)
Question
Which of the following is a measure of how suitable the development of a system will be to an organization?

A) Documentation
B) Resolution
C) Presentation
D) Feasibility
Question
System development life cycles often group many activities into larger categories called which of the following?

A) clusters
B) feature sets
C) units
D) phases
Question
The purpose of this phase is to construct, or build, a new or modified system and then deliver it to the users. What is this phase?

A) planning phase
B) analysis phase
C) implementation phase
D) support phase
Question
During which of the following phases does a systems analyst identify the required programs and the relationship among each program, as well as input, output, and database specifications?

A) storage design
B) database design
C) program design
D) input and output design
Question
In this phase, system developers perform four major activities: (1) develop programs and apps, (2) install and test the new system, (3) train users, and (4) convert to the new system. What is this phase?

A) implementation
B) planning
C) operational
D) analysis
Question
Which of the following involves showing users exactly how they will use the new hardware and software in a system?

A) supervised usage
B) direct conversion
C) phased conversion
D) training
Question
Which of the following is true of an integration test?

A) verifies that each individual program works by itself
B) verifies that all programs in an application work together properly
C) verifies that an application works with other applications
D) is performed by end-users and verifies that the new system works with actual data
Question
Which of the following is true of a unit test?

A) It verifies that each individual program or object works by itself.
B) It verifies that all programs in an application work together properly.
C) It verifies that an application works with other applications.
D) It is performed by end-users and verifies that the new system works with actual data.
Question
Which of the following consists of running the old system alongside the new system for a specified time?

A) phased conversion
B) direct conversion
C) parallel conversion
D) pilot conversion
Question
With this kind of conversion, only one location in the company uses a new system - so it can be tested. What is this kind of conversion?

A) phased conversion
B) direct conversion
C) parallel conversion
D) pilot conversion
Question
During which of the following phases does a systems analyst carefully design every menu, screen, and report specified in the requirement?

A) storage design
B) algorithmic design
C) program design
D) detailed design
Question
The purpose of this phase is to provide ongoing assistance for an information system and its users after the system is implemented. What is this phase?

A) planning phase
B) analysis phase
C) support and security phase
D) implementation phase
Question
Which of the following is true of an acceptance tests?

A) verifies that each individual program works by itself
B) verifies that all programs in an application work together properly
C) verifies that an application works with other applications
D) is performed by end users and verifies that the new system works with actual data
Question
Which of the following is true of a systems test?

A) verifies that each individual program works by itself
B) verifies that all programs in an application work together properly
C) verifies that an application works with other applications
D) is performed by end-users and verifies that the new system works with actual data
Question
The disadvantage of this kind of conversion is that it is extremely risky and can disrupt operations seriously if the new system does not work correctly the first time. Which kind of conversion is this?

A) parallel conversion
B) direct conversion
C) pilot conversion
D) phased conversion
Question
With this kind of conversion, each location converts to a new system at a separate time. What is this kind of conversion?

A) phased conversion
B) direct conversion
C) parallel conversion
D) pilot conversion
Question
Companies today often have a person who is responsible for the physical security of an organization's property and people and also is in charge of the digital security of computing resources. What is the title of this person?

A) CIT
B) CSO
C) CTO
D) CRO
Question
Which of the following is a professional who is hired based on expertise in a specialized area of computers, including service and advice?

A) technology analyst
B) computer logician
C) IT consultant
D) outsourcer
Question
For each input and output, a systems analyst typically develops a sample of the input or output that contains actual data. What is this sample called?

A) adaptation
B) prototype
C) mock-up
D) feasibility scheme
Question
With this kind of conversion, a user stops using the old system and begins using the new system on a certain date. What is this kind of conversion?

A) phased conversion
B) direct conversion
C) parallel conversion
D) pilot conversion
Question
The purpose of which of the following is to determine whether a system is inefficient at any point?

A) performance monitoring
B) post-implementation system review
C) expectation review subphase
D) security phase
Question
Which of the following kinds of products are software tools designed to support one or more activities of the system development cycle?

A) feasibility
B) prototyping
C) mock-up
D) CASE
Question
COGNITIVE ASSESSMENT Which of the following is a chart type, also called a network diagram, that is best suited for scheduling large, complex projects?

A) PERT
B) 3-D
C) Gantt
D) horizontal
Question
COGNITIVE ASSESSMENT Which of the following describes an information system?

A) a network of computers that enables the transfer of information from one computer to another, such as the Internet
B) a collection of hardware, software, data, people, and procedures that work together to produce quality information
C) a group of data professionals who work together to enhance communications systems
D) a series of activities such as analysis and design in the process of distributing information on a large scale
Question
Which of the following is a set of technologies from Microsoft that allows almost any type of program to run on the Internet or an internal business network?

A) )JIT
B) )RPG
C) )NET
D) )VPE
Question
COGNITIVE ASSESSMENT Your project manager realizes the team will not be able to meet the original project deadline, so she extends the deadline. What process is she using?

A) reactive planning
B) change management
C) revised delivery
D) difference scheduling
Question
Which of the following is an advantage of an interpreter?

A) When it finds errors, it displays feedback immediately.
B) Interpreted programs run faster than compiled programs.
C) An interpreter produces an object program.
D) It can double as a compiler.
Question
COGNITIVE ASSESSMENT Which of the following is not a phase in system development?

A) regeneration
B) planning
C) implementation
D) support and security
Question
Which of the following is an interpreted language that allows a programmer to add dynamic content and interactive elements to a webpage?

A) Unix
B) HTML
C) COBOL
D) JavaScript
Question
<strong>  To convert an assembly language source program as shown in the accompanying figure into machine language, programmers use which of the following?</strong> A) manager B) converter C) assembler D) compiler <div style=padding-top: 35px> To convert an assembly language source program as shown in the accompanying figure into machine language, programmers use which of the following?

A) manager
B) converter
C) assembler
D) compiler
Question
HTML uses codes that specify links to other documents and indicate how a webpage is displayed when viewed on the web. What is the term for these codes?

A) links
B) icons
C) keys
D) tags
Question
Which of the following summarizes in writing all the safeguards that are in place to protect an organization's information assets?

A) information protection process
B) asset lockdown system
C) computer security plan
D) assets safeguard map
Question
COGNITIVE ASSESSMENT Which of the following general terms is used to describe charts, diagrams, reports, and program files?

A) deliverables
B) tangibles
C) scopes
D) data pieces
Question
COGNITIVE ASSESSMENT What term is used to measure how suitable the development of a system will be to the organization?

A) perfectibility
B) reasonability
C) capability
D) feasibility
Question
Wireless devices use a subset of XML that allows webpage developers to design pages specifically for microbrowsers. What is the name of this subset?

A) WXL
B) WML
C) MXL
D) MML
Question
Which of the following originally was developed at NASA's Jet Propulsion Laboratory as a procedural scripting language similar to C and C++?

A) XML
B) Rexx
C) Tcl
D) Perl
Question
Which of the following is a special formatting language that programmers use to format documents for display on the web?

A) Java
B) JavaScript
C) HTML
D) all of the above
Question
COGNITIVE ASSESSMENT What occurs during scope creep?

A) one bad programming decision leads to another and work must be undone
B) the project manager decides to remove certain planned activities in order to save time
C) one activity leads to another that was not originally planned
D) feasibility of the project is reevaluated
Question
COGNITIVE ASSESSMENT One of the guidelines of system development is to define standards. What is meant by standards?

A) the required capacity, quality, and reliability of the information system
B) contributions of the users of the system during the design process
C) activities and tasks that are grouped together into phases
D) sets of rules and procedures an organization expects employees to accept and follow
Question
Which of the following is an object-oriented programming language that is an extension of the C programming language?

A) C+
B) C-
C) C++
D) C=
Question
COGNITIVE ASSESSMENT You are applying for a job as a system analyst. What will your job entail?

A) reviewing existing systems and selecting one to use for your organization
B) converting the system design into a programming language
C) providing technical support to users and system programmers
D) designing and developing an information system
Question
COGNITIVE ASSESSMENT Which of the following terms best describes a decision-making body in an organization?

A) a project team
B) information managers
C) a steering committee
D) team leaders
Question
COGNITIVE ASSESSMENT What purpose do CASE tools serve?

A) evaluate vendor proposals
B) determine system requirements
C) support one or more activities of system development
D) calculate how the system will be evaluated
Question
COGNITIVE ASSESSMENT Which two activities make up the design phase of an SDLC?

A) use data modeling to determine necessary procedures; acquire hardware and software
B) get approval of the system proposal; use data modeling to determine necessary procedures
C) develop the details of the new or modified information system; get approval of the system proposal
D) acquire hardware and software; develop the details of the new or modified information system
Question
COGNITIVE ASSESSMENT What is the theory behind user buy-in?

A) rolling out a completed system with incentives for users gets them excited about a new system
B) the users who have contributed to the process of system development get to be the first to implement it
C) systems analysts should do web research and read technical reports in order to understand how a system will be used
D) if users are involved in system development, they are more likely to use and accept the new system
Question
COGNITIVE ASSESSMENT Which of the following activities is NOT considered part of the planning phase?

A) prioritize project requests
B) allocate resources such as money, people, and equipment
C) conduct a preliminary investigation
D) form a project development team
Question
COGNITIVE ASSESSMENT What does a benchmark test evaluate?

A) the costs to modify or replace an information system
B) the efficiency of an information system
C) the performance of hardware or software
D) the flow of data in a proposed information system
Question
COGNITIVE ASSESSMENT Which type of test is used to verify that the new system works with actual data?

A) unit
B) systems
C) acceptance
D) integration
Question
COGNITIVE ASSESSMENT What is a VAR?

A) a tool used to solicit proposals for hardware and software necessary for system development
B) a vendor with an automated response system for customer service requests and tech support
C) a company that purchases products from manufacturers and resells them to the public, also offering additional services with the product
D) an analysis method that compares the value of a current system with additional requirements being requested by users
Question
COGNITIVE ASSESSMENT What is the term for the practice of an organization not using its own IT personnel to develop custom software?

A) outhousing
B) external servicing
C) outsourcing
D) remote programming
Question
COGNITIVE ASSESSMENT Which conversion strategy has as its main disadvantage that it is costly to operate two systems at the same time?

A) phased
B) parallel
C) pilot
D) direct
Question
COGNITIVE ASSESSMENT What is an RFP?

A) a data modeling method that uses realistic flow processes
B) an online catalog published by a vendor that includes products, prices, and ordering information
C) another term for a system proposal
D) a document in which a vendor selects products and quotes prices
Question
COGNITIVE ASSESSMENT During which phase in the SDLC is the system installed and tested?

A) design
B) implementation
C) operation
D) analysis
Question
COGNITIVE ASSESSMENT What is another term for detailed analysis?

A) theoretical plan
B) logical design
C) virtual proposal
D) research documentation
Question
COGNITIVE ASSESSMENT A systems analyst develops a technical design that contains programming-like notations. What is this design called?

A) layout chart
B) mock-up
C) data model
D) project flowchart
Question
COGNITIVE ASSESSMENT You purchase a spreadsheet program for your computer from a vendor who mass-produces software. What is the term for this type of software?

A) popular
B) platform
C) retail
D) prepared
Question
COGNITIVE ASSESSMENT What is a JAD session?

A) a journaling activity that details the progress of system development, including any issues that have occurred and how they were resolved
B) a series of lengthy, structured, group meetings in with users and IT professionals work together to design or develop an application
C) research using sources such as the web or reference books is presented to team leaders to come up with creative solutions
D) a one-on-one interview between a user and a system analyst to determine how well the system works for that user
Question
COGNITIVE ASSESSMENT Which of the following terms is used to describe a working model of a proposed system?

A) prototype
B) mock-up
C) flowchart
D) data model
Question
COGNITIVE ASSESSMENT Which conversion strategy converts each location to the new system at a separate time?

A) phased
B) parallel
C) pilot
D) direct
Question
COGNITIVE ASSESSMENT What phase of system development starts after the system proposal is approved?

A) design
B) analysis
C) implementation
D) operation, support, and security
Question
COGNITIVE ASSESSMENT Which type of test is used to verify that all programs in an application work together properly?

A) unit
B) systems
C) acceptance
D) integration
Question
COGNITIVE ASSESSMENT Which of the following is NOT true about project requests?

A) A project request falls under the analysis phase of an SDLC.
B) In a large organization, these often must be formal, written statements.
C) They are sometimes called requests for system services.
D) Some changes are outside the control or an organization, such as response to competition.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/181
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 12: Information Systems and Program Development: Designing and Building Solutions
1
Which of the following occurs when one activity in a project has led to another that was not originally planned; thus, the scope of the project has grown?

A) scope creep
B) dynamic change
C) project growth
D) task slippage
A
2
With which of the following does the vendor select the product(s) that meets specified requirements and then quotes the prices?

A) request for quotation (RFQ)
B) request for system services (RFSS)
C) request for information (RFI)
D) request for proposal (RFP)
D
3
In large companies, users write a formal request for a new or modified information system, which is called which of the following?

A) system demand
B) IS need
C) project request
D) corporate requirement
C
4
Which of the following measures how well a proposed system will work?

A) Operational feasibility
B) Technical feasibility
C) Schedule feasibility
D) Economic feasibility
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
5
Which of the following identifies the product(s) a systems analyst wants from a vendor?

A) request for quotation (RFQ)
B) request for system services (RFSS)
C) request for information (RFI)
D) request for proposal (RFP)
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
6
In sequence, traditional system development contains five phases. What are they?

A) planning, analysis, design, implementation, support and security
B) analysis, implementation, support and security, design, planning
C) support and security, design, planning, analysis, implementation
D) implementation, analysis, support and security, planning, design
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
7
Which of the following is an advantage of custom software?

A) It matches an organization's requirements exactly.
B) It is less expensive and takes less time to design and implement than packaged software.
C) It is mass produced, copyrighted, prewritten, and available for purchase.
D) All of the above.
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
8
<strong>  As shown in the accompanying figure, a Gantt chart, developed by Henry Gantt, is which of the following?</strong> A) diagram that graphically shows how actors interact with an information system B) tool that graphically shows the flow of data in a system C) bar chart that uses horizontal bars to show project phases or activities D) table that lists a variety of conditions and the actions that correspond to them As shown in the accompanying figure, a Gantt chart, developed by Henry Gantt, is which of the following?

A) diagram that graphically shows how actors interact with an information system
B) tool that graphically shows the flow of data in a system
C) bar chart that uses horizontal bars to show project phases or activities
D) table that lists a variety of conditions and the actions that correspond to them
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
9
Which of the following is a set of phases that developers use to build an information system?

A) information system production process
B) information systems synthesis
C) system development life cycle
D) system development production process
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
10
Which of the following phases consists of two major activities: (1) if necessary, acquire hardware and software and (2) develop all of the details of the new or modified information system?

A) analytical
B) planning
C) design
D) operational
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
11
Which of the following is any tangible item such as a chart, diagram, report, or program file?

A) object
B) entity
C) deliverable
D) source
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
12
One member of the project team manages and controls the budget and schedule of the project. What is the name for this role?

A) leader
B) comptroller
C) assistant
D) analyst
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
13
Which of the following roles is responsible for designing and developing an information system?

A) manager
B) coordinator
C) analyst
D) developer
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
14
Many VARs (value-added resellers) provide complete systems. These also are known as which of the following?

A) final solutions
B) turnkey solutions
C) solid solutions
D) ultimate solutions
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
15
Which of the following general guidelines should system development NOT follow?

A) group tasks into phases
B) repeat tasks intermittently
C) involve the users
D) define standards
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
16
Which of the following has as its purpose the assessment of the feasibility of each alternative solution and then recommend the most feasible solution for a project?

A) software
B) proposal
C) sourcing
D) map
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
17
Companies can develop software in-house using their own IT personnel or they can have an outside source develop it for them. What is the term for the latter option?

A) fast-tracking
B) development sharing
C) externalization
D) outsourcing
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
18
Which of the following is a less formal method that uses a standard form to request information about a product or service?

A) request for quotation (RFQ)
B) request for system services (RFSS)
C) request for proposal (RFP)
D) request for information (RFI)
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
19
Which of the following is a measure of how suitable the development of a system will be to an organization?

A) Documentation
B) Resolution
C) Presentation
D) Feasibility
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
20
System development life cycles often group many activities into larger categories called which of the following?

A) clusters
B) feature sets
C) units
D) phases
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
21
The purpose of this phase is to construct, or build, a new or modified system and then deliver it to the users. What is this phase?

A) planning phase
B) analysis phase
C) implementation phase
D) support phase
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
22
During which of the following phases does a systems analyst identify the required programs and the relationship among each program, as well as input, output, and database specifications?

A) storage design
B) database design
C) program design
D) input and output design
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
23
In this phase, system developers perform four major activities: (1) develop programs and apps, (2) install and test the new system, (3) train users, and (4) convert to the new system. What is this phase?

A) implementation
B) planning
C) operational
D) analysis
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
24
Which of the following involves showing users exactly how they will use the new hardware and software in a system?

A) supervised usage
B) direct conversion
C) phased conversion
D) training
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following is true of an integration test?

A) verifies that each individual program works by itself
B) verifies that all programs in an application work together properly
C) verifies that an application works with other applications
D) is performed by end-users and verifies that the new system works with actual data
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
26
Which of the following is true of a unit test?

A) It verifies that each individual program or object works by itself.
B) It verifies that all programs in an application work together properly.
C) It verifies that an application works with other applications.
D) It is performed by end-users and verifies that the new system works with actual data.
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
27
Which of the following consists of running the old system alongside the new system for a specified time?

A) phased conversion
B) direct conversion
C) parallel conversion
D) pilot conversion
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
28
With this kind of conversion, only one location in the company uses a new system - so it can be tested. What is this kind of conversion?

A) phased conversion
B) direct conversion
C) parallel conversion
D) pilot conversion
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
29
During which of the following phases does a systems analyst carefully design every menu, screen, and report specified in the requirement?

A) storage design
B) algorithmic design
C) program design
D) detailed design
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
30
The purpose of this phase is to provide ongoing assistance for an information system and its users after the system is implemented. What is this phase?

A) planning phase
B) analysis phase
C) support and security phase
D) implementation phase
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
31
Which of the following is true of an acceptance tests?

A) verifies that each individual program works by itself
B) verifies that all programs in an application work together properly
C) verifies that an application works with other applications
D) is performed by end users and verifies that the new system works with actual data
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
32
Which of the following is true of a systems test?

A) verifies that each individual program works by itself
B) verifies that all programs in an application work together properly
C) verifies that an application works with other applications
D) is performed by end-users and verifies that the new system works with actual data
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
33
The disadvantage of this kind of conversion is that it is extremely risky and can disrupt operations seriously if the new system does not work correctly the first time. Which kind of conversion is this?

A) parallel conversion
B) direct conversion
C) pilot conversion
D) phased conversion
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
34
With this kind of conversion, each location converts to a new system at a separate time. What is this kind of conversion?

A) phased conversion
B) direct conversion
C) parallel conversion
D) pilot conversion
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
35
Companies today often have a person who is responsible for the physical security of an organization's property and people and also is in charge of the digital security of computing resources. What is the title of this person?

A) CIT
B) CSO
C) CTO
D) CRO
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
36
Which of the following is a professional who is hired based on expertise in a specialized area of computers, including service and advice?

A) technology analyst
B) computer logician
C) IT consultant
D) outsourcer
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
37
For each input and output, a systems analyst typically develops a sample of the input or output that contains actual data. What is this sample called?

A) adaptation
B) prototype
C) mock-up
D) feasibility scheme
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
38
With this kind of conversion, a user stops using the old system and begins using the new system on a certain date. What is this kind of conversion?

A) phased conversion
B) direct conversion
C) parallel conversion
D) pilot conversion
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
39
The purpose of which of the following is to determine whether a system is inefficient at any point?

A) performance monitoring
B) post-implementation system review
C) expectation review subphase
D) security phase
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
40
Which of the following kinds of products are software tools designed to support one or more activities of the system development cycle?

A) feasibility
B) prototyping
C) mock-up
D) CASE
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
41
COGNITIVE ASSESSMENT Which of the following is a chart type, also called a network diagram, that is best suited for scheduling large, complex projects?

A) PERT
B) 3-D
C) Gantt
D) horizontal
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
42
COGNITIVE ASSESSMENT Which of the following describes an information system?

A) a network of computers that enables the transfer of information from one computer to another, such as the Internet
B) a collection of hardware, software, data, people, and procedures that work together to produce quality information
C) a group of data professionals who work together to enhance communications systems
D) a series of activities such as analysis and design in the process of distributing information on a large scale
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
43
Which of the following is a set of technologies from Microsoft that allows almost any type of program to run on the Internet or an internal business network?

A) )JIT
B) )RPG
C) )NET
D) )VPE
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
44
COGNITIVE ASSESSMENT Your project manager realizes the team will not be able to meet the original project deadline, so she extends the deadline. What process is she using?

A) reactive planning
B) change management
C) revised delivery
D) difference scheduling
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
45
Which of the following is an advantage of an interpreter?

A) When it finds errors, it displays feedback immediately.
B) Interpreted programs run faster than compiled programs.
C) An interpreter produces an object program.
D) It can double as a compiler.
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
46
COGNITIVE ASSESSMENT Which of the following is not a phase in system development?

A) regeneration
B) planning
C) implementation
D) support and security
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
47
Which of the following is an interpreted language that allows a programmer to add dynamic content and interactive elements to a webpage?

A) Unix
B) HTML
C) COBOL
D) JavaScript
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
48
<strong>  To convert an assembly language source program as shown in the accompanying figure into machine language, programmers use which of the following?</strong> A) manager B) converter C) assembler D) compiler To convert an assembly language source program as shown in the accompanying figure into machine language, programmers use which of the following?

A) manager
B) converter
C) assembler
D) compiler
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
49
HTML uses codes that specify links to other documents and indicate how a webpage is displayed when viewed on the web. What is the term for these codes?

A) links
B) icons
C) keys
D) tags
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
50
Which of the following summarizes in writing all the safeguards that are in place to protect an organization's information assets?

A) information protection process
B) asset lockdown system
C) computer security plan
D) assets safeguard map
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
51
COGNITIVE ASSESSMENT Which of the following general terms is used to describe charts, diagrams, reports, and program files?

A) deliverables
B) tangibles
C) scopes
D) data pieces
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
52
COGNITIVE ASSESSMENT What term is used to measure how suitable the development of a system will be to the organization?

A) perfectibility
B) reasonability
C) capability
D) feasibility
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
53
Wireless devices use a subset of XML that allows webpage developers to design pages specifically for microbrowsers. What is the name of this subset?

A) WXL
B) WML
C) MXL
D) MML
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
54
Which of the following originally was developed at NASA's Jet Propulsion Laboratory as a procedural scripting language similar to C and C++?

A) XML
B) Rexx
C) Tcl
D) Perl
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
55
Which of the following is a special formatting language that programmers use to format documents for display on the web?

A) Java
B) JavaScript
C) HTML
D) all of the above
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
56
COGNITIVE ASSESSMENT What occurs during scope creep?

A) one bad programming decision leads to another and work must be undone
B) the project manager decides to remove certain planned activities in order to save time
C) one activity leads to another that was not originally planned
D) feasibility of the project is reevaluated
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
57
COGNITIVE ASSESSMENT One of the guidelines of system development is to define standards. What is meant by standards?

A) the required capacity, quality, and reliability of the information system
B) contributions of the users of the system during the design process
C) activities and tasks that are grouped together into phases
D) sets of rules and procedures an organization expects employees to accept and follow
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
58
Which of the following is an object-oriented programming language that is an extension of the C programming language?

A) C+
B) C-
C) C++
D) C=
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
59
COGNITIVE ASSESSMENT You are applying for a job as a system analyst. What will your job entail?

A) reviewing existing systems and selecting one to use for your organization
B) converting the system design into a programming language
C) providing technical support to users and system programmers
D) designing and developing an information system
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
60
COGNITIVE ASSESSMENT Which of the following terms best describes a decision-making body in an organization?

A) a project team
B) information managers
C) a steering committee
D) team leaders
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
61
COGNITIVE ASSESSMENT What purpose do CASE tools serve?

A) evaluate vendor proposals
B) determine system requirements
C) support one or more activities of system development
D) calculate how the system will be evaluated
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
62
COGNITIVE ASSESSMENT Which two activities make up the design phase of an SDLC?

A) use data modeling to determine necessary procedures; acquire hardware and software
B) get approval of the system proposal; use data modeling to determine necessary procedures
C) develop the details of the new or modified information system; get approval of the system proposal
D) acquire hardware and software; develop the details of the new or modified information system
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
63
COGNITIVE ASSESSMENT What is the theory behind user buy-in?

A) rolling out a completed system with incentives for users gets them excited about a new system
B) the users who have contributed to the process of system development get to be the first to implement it
C) systems analysts should do web research and read technical reports in order to understand how a system will be used
D) if users are involved in system development, they are more likely to use and accept the new system
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
64
COGNITIVE ASSESSMENT Which of the following activities is NOT considered part of the planning phase?

A) prioritize project requests
B) allocate resources such as money, people, and equipment
C) conduct a preliminary investigation
D) form a project development team
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
65
COGNITIVE ASSESSMENT What does a benchmark test evaluate?

A) the costs to modify or replace an information system
B) the efficiency of an information system
C) the performance of hardware or software
D) the flow of data in a proposed information system
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
66
COGNITIVE ASSESSMENT Which type of test is used to verify that the new system works with actual data?

A) unit
B) systems
C) acceptance
D) integration
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
67
COGNITIVE ASSESSMENT What is a VAR?

A) a tool used to solicit proposals for hardware and software necessary for system development
B) a vendor with an automated response system for customer service requests and tech support
C) a company that purchases products from manufacturers and resells them to the public, also offering additional services with the product
D) an analysis method that compares the value of a current system with additional requirements being requested by users
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
68
COGNITIVE ASSESSMENT What is the term for the practice of an organization not using its own IT personnel to develop custom software?

A) outhousing
B) external servicing
C) outsourcing
D) remote programming
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
69
COGNITIVE ASSESSMENT Which conversion strategy has as its main disadvantage that it is costly to operate two systems at the same time?

A) phased
B) parallel
C) pilot
D) direct
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
70
COGNITIVE ASSESSMENT What is an RFP?

A) a data modeling method that uses realistic flow processes
B) an online catalog published by a vendor that includes products, prices, and ordering information
C) another term for a system proposal
D) a document in which a vendor selects products and quotes prices
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
71
COGNITIVE ASSESSMENT During which phase in the SDLC is the system installed and tested?

A) design
B) implementation
C) operation
D) analysis
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
72
COGNITIVE ASSESSMENT What is another term for detailed analysis?

A) theoretical plan
B) logical design
C) virtual proposal
D) research documentation
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
73
COGNITIVE ASSESSMENT A systems analyst develops a technical design that contains programming-like notations. What is this design called?

A) layout chart
B) mock-up
C) data model
D) project flowchart
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
74
COGNITIVE ASSESSMENT You purchase a spreadsheet program for your computer from a vendor who mass-produces software. What is the term for this type of software?

A) popular
B) platform
C) retail
D) prepared
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
75
COGNITIVE ASSESSMENT What is a JAD session?

A) a journaling activity that details the progress of system development, including any issues that have occurred and how they were resolved
B) a series of lengthy, structured, group meetings in with users and IT professionals work together to design or develop an application
C) research using sources such as the web or reference books is presented to team leaders to come up with creative solutions
D) a one-on-one interview between a user and a system analyst to determine how well the system works for that user
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
76
COGNITIVE ASSESSMENT Which of the following terms is used to describe a working model of a proposed system?

A) prototype
B) mock-up
C) flowchart
D) data model
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
77
COGNITIVE ASSESSMENT Which conversion strategy converts each location to the new system at a separate time?

A) phased
B) parallel
C) pilot
D) direct
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
78
COGNITIVE ASSESSMENT What phase of system development starts after the system proposal is approved?

A) design
B) analysis
C) implementation
D) operation, support, and security
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
79
COGNITIVE ASSESSMENT Which type of test is used to verify that all programs in an application work together properly?

A) unit
B) systems
C) acceptance
D) integration
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
80
COGNITIVE ASSESSMENT Which of the following is NOT true about project requests?

A) A project request falls under the analysis phase of an SDLC.
B) In a large organization, these often must be formal, written statements.
C) They are sometimes called requests for system services.
D) Some changes are outside the control or an organization, such as response to competition.
Unlock Deck
Unlock for access to all 181 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 181 flashcards in this deck.