Deck 5: Systems Development and Program Change Activities

Full screen (f)
exit full mode
Question
One-time costs include operating and maintenance costs.
Use Space or
up arrow
down arrow
to flip the card.
Question
Intangible benefits are not physical,but can be measured and expressed in financial terms.
Question
The objective of systems planning is to link systems projects to the strategic objectives of the firm.
Question
When determining the operational feasibility of a new system,the expected ease of transition from the old system to the new system should be considered.
Question
The Systems Development Life Cycle (SDLC)concept applies to specific applications and not to strategic systems planning.
Question
Recurring costs include: hardware maintenance,software acquisition,software maintenance,insurance,supplies,personnel costs.
Question
System maintenance is often viewed as the first phase of a new development cycle.
Question
An accountant's responsibility in the SDLC is to ensure that the system applies proper accounting conventions and rules and possesses adequate control.
Question
All of the steps in the Systems Development Life Cycle apply to software that is developed in-house and to commercial software.
Question
When preparing a cost-benefit analysis,design costs incurred in the systems planning,systems analysis and conceptual design phases of the Systems Development Life Cycle are relevant costs.
Question
When the nature of the project and the needs of the user permit,most organizations will seek a pre-coded commercial software package rather than develop a system in-house.
Question
Instead of implementing an application in a single big-bang release,modern systems are delivered in parts continuously and quickly
Question
A tangible benefit can be measured and expressed in financial terms.
Question
Mixing technologies from many vendors improves technical feasibility.
Question
In the conceptual design phase of the Systems Development Life Cycle (SDLC),task force members are focused on selecting the new system design.
Question
Programs in their compiled state are very susceptible to the threat of unauthorized modification.
Question
The first step in the SDLC is to develop a systems strategy
Question
Legal feasibility identifies conflicts between the proposed system and the company's ability to discharge its legal responsibilities
Question
During the detailed feasibility study of the project,the systems professional who proposed the project should be involved in performing the study.
Question
The payback method is often more useful than the net present value method for evaluating systems projects because the effective lives of information system tend to be short and shorter payback projects are often desirable.
Question
Which control is not associated with new systems development activities?

A) reconciling program version numbers
B) program testing
C) user involvement
D) internal audit participation
Question
When the auditor reconciles the program version numbers,which audit objective is being tested?

A) protect applications from unauthorized changes
B) ensure applications are free from error
C) protect production libraries from unauthorized access
D) ensure incompatible functions have been identified and segregated
Question
Which level of a data flow diagram is used to produce program code and database tables?

A) context level
B) elementary level
C) intermediate level
D) prototype level
Question
Firms with an independent internal audit staff may conduct tests of the system development life cycle on an ongoing basis.
Question
Which control is not a part of the source program library management system?

A) using passwords to limit access to application programs
B) assigning a test name to all programs undergoing maintenance
C) combining access to the development and maintenance test libraries
D) assigning version numbers to programs to record program modifications
Question
Which statement is correct?

A) compiled programs are very susceptible to unauthorized modification
B) the source program library stores application programs in source code form
C) modifications are made to programs in machine code language
D) the source program library management system increases operating efficiency
Question
Program testing

A) involves individual modules only, not the full system
B) requires creation of meaningful test data
C) need not be repeated once the system is implemented
D) is primarily concerned with usability
Question
Which is not a level of a data flow diagram?

A) conceptual level
B) context level
C) intermediate level
D) elementary level
Question
Which statement is not true?

A) An audit objective for systems maintenance is to detect unauthorized access to application databases.
B) An audit objective for systems maintenance is to ensure that applications are free from errors.
C) An audit objective for systems maintenance is to verify that user requests for maintenance reconcile to program version numbers.
D) An audit objective for systems maintenance is to ensure that the production libraries are protected from unauthorized access.
Question
Which test of controls will provide evidence that the system as originally implemented was free from material errors and free from fraud? Review of the documentation indicates that

A) a cost-benefit analysis was conducted
B) the detailed design was an appropriate solution to the user's problem
C) tests were conducted at the individual module and total system levels prior to implementation
D) problems detected during the conversion period were corrected in the maintenance phase
Question
Source program library controls should prevent and detect unauthorized access to application programs.
Question
Maintenance access to systems increases the risk that logic will be corrupted either by the accident or intent to defraud.
Question
A cost-benefit analysis is a part of the detailed

A) operational feasibility study
B) schedule feasibility study
C) legal feasibility study
D) economic feasibility study
Question
Which statement is not correct? The structured design approach

A) is a top-down approach
B) is documented by data flow diagrams and structure diagrams
C) assembles reusable modules rather than creating systems from scratch
D) starts with an abstract description of the system and redefines it to produce a more detailed description of the system
Question
Which control ensures that production files cannot be accessed without specific permission?

A) Database Management System
B) Recovery Operations Function
C) Source Program Library Management System
D) Computer Services Function
Question
The presence of a SPLMS effectively guarantees program integrity.
Question
Routine maintenance activities require all of the following controls except

A) documentation updates
B) testing
C) formal authorization
D) internal audit approval
Question
The benefits of the object-oriented approach to systems design include all of the following except

A) this approach does not require input from accountants and auditors
B) development time is reduced
C) a standard module once tested does not have to be retested until changes are made
D) system maintenance activities are simplified
Question
The user test and acceptance procedure is the last point at which the user can determine the system's acceptability prior to it going into service.
Question
Evaluators of the detailed feasibility study should not include

A) the internal auditor
B) the project manager
C) a user representative
D) the system designer
Question
Which type of documentation shows the detailed relationship of input files,programs,and output files?

A) structure diagrams
B) overview diagram
C) system flowchart
D) program flowchart
Question
Examples of one-time costs include all of the following except

A) hardware acquisition
B) insurance
C) site preparation
D) programming
Question
When converting to a new system,which cutover method is the most conservative?

A) cold turkey cutover
B) phased cutover
C) parallel operation cutover
D) data coupling cutover
Question
Which of the following is not an advantage of commercial software? Commercial software

A) can be installed faster than a custom system
B) can be easily modified to the user's exact specifications
C) is significantly less expensive than a system developed in-house
D) is less likely to have errors than an equivalent system developed in-house
Question
Computer operators should have access to all of the following types of documentation except

A) a list of users who receive output
B) a program code listing
C) a list of all master files used in the system
D) a list of required hardware devices
Question
A tangible benefit

A) can be measured and expressed in financial terms
B) might increase revenues
C) might decrease costs
D) all of the above
Question
System documentation is designed for all of the following groups except

A) systems designers and programmers
B) end users
C) accountants
D) all of the above require systems documentation
Question
Which step is least likely to occur when choosing a commercial software package?

A) a detailed review of the source code
B) contact with user groups
C) preparation of a request for proposal
D) comparison of the results of a benchmark problem
Question
Which task is not essential during a data conversion procedure?

A) decomposing the system
B) validating the database
C) reconciliation of new and old databases
D) backing up the original files
Question
A commercial software system that is completely finished,tested,and ready for implementation is called a

A) backbone system
B) vendor-supported system
C) benchmark system
D) turnkey system
Question
An example of an intangible benefit is

A) expansion into other markets
B) reduction in supplies and overhead
C) more efficient operations
D) reduced equipment maintenance
Question
The detailed design report contains all of the following except

A) input screen formats
B) alternative conceptual designs
C) report layouts
D) process logic
Question
An example of a tangible benefit is

A) increased customer satisfaction
B) more current information
C) reduced inventories
D) faster response to competitor actions
Question
Typical contents of a run manual include all of the following except

A) run schedule
B) logic flowchart
C) file requirements
D) explanation of error messages
Question
Examples of recurring costs include

A) software acquisition
B) data conversion
C) personnel costs
D) systems design
Question
Intangible benefits

A) are easily measured
B) are of relatively little importance in making information system decisions
C) are sometimes estimated using customer satisfaction surveys
D) when measured, do not lend themselves to manipulation
Question
The output of the detailed design phase of the Systems Development Life Cycle (SDLC)is a

A) fully documented system report
B) systems selection report
C) detailed system design report
D) systems analysis report
Question
When implementing a new system,the costs associated with transferring data from one storage medium to another is an example of

A) a recurring cost
B) a data conversion cost
C) a systems design cost
D) a programming cost
Question
The testing of individual program modules is a part of

A) software acquisition costs
B) systems design costs
C) data conversion costs
D) programming costs
Question
Site preparation costs include all of the following except

A) crane used to install equipment
B) freight charges
C) supplies
D) reinforcement of the building floor
Question
Project planning includes all of the following except

A) specifying system objectives
B) preparing a formal project proposal
C) selecting hardware vendors
D) producing a project schedule
Question
The role of the steering committee includes

A) designing the system outputs
B) resolving conflicts that arise from a new system
C) selecting the programming techniques to be used
D) approving the accounting procedures to be implemented
Question
Typically a systems analysis

A) results in a formal project schedule
B) does not include a review of the current system
C) identifies user needs and specifies system requirements
D) is performed by the internal auditor
Question
One time costs include all of the following except

A) site preparation
B) insurance
C) programming and testing
D) data conversion
Question
The accountant's role in systems analysis includes all of the following except

A) specify audit trail requirements
B) prepare data gathering questionnaires
C) suggest inclusion of advanced audit features
D) ensure mandated procedures are part of the design
Question
The formal product of the systems evaluation and selection phase of the Systems Development Life Cycle is

A) the report of systems analysis
B) the systems selection report
C) the detailed system design
D) the systems plan
Question
Which technique is least likely to be used to quantify intangible benefits?

A) opinion surveys
B) simulation models
C) professional judgment
D) review of accounting transaction data
Question
When developing the conceptual design of a system,

A) all similarities and differences between competing systems are highlighted
B) structure diagrams are commonly used
C) the format for input screens and source documents is decided
D) inputs, processes, and outputs that distinguish one alternative from another are identified
Question
Which of the following is not a tool of systems analysts?

A) observation
B) task participation
C) audit reports
D) personal interviews
Question
A disadvantage of surveying the current system is

A) it constrains the generation of ideas about the new system
B) it highlights elements of the current system that are worth preserving
C) it pinpoints the causes of the current problems
D) all of the above are advantages of surveying the current system
Question
The systems analysis report does not

A) identify user needs
B) specify requirements for the new system
C) formally state the goals and objectives of the system
D) specify the system processing methods
Question
The role of the accountant/internal auditor in the conceptual design phase of the Systems Development Life Cycle includes all of the following except

A) the accountant is responsible for designing the physical system
B) the accountant is responsible to ensure that audit trails are preserved
C) the internal auditor is responsible to confirm that embedded audit modules are included in the conceptual design
D) the accountant is responsible to make sure that the accounting conventions that apply to the module are considered by the system designers
Question
After the systems analysis phase of the System Development Life Cycle (SDLC)is complete,the company will have a formal systems analysis report on

A) the conceptual design of the new system
B) an evaluation of the new system
C) users' needs and requirements for the new system
D) a comparison of alternative implementation procedures for the new system
Question
Systems analysis involves all of the following except

A) gathering facts
B) surveying the current system
C) redesigning bottleneck activities
D) reviewing key documents
Question
Contrast the source program library (SPL)management system to the database management system (DBMS).
Question
Recurring costs include all of the following except

A) data conversion
B) software maintenance
C) insurance
D) supplies
Question
Aspects of project feasibility include all of the following except

A) technical feasibility
B) economic feasibility
C) logistic feasibility
D) schedule feasibility
Question
Project feasibility includes all of the following except

A) technical feasibility
B) conceptual feasibility
C) operational feasibility
D) schedule feasibility
Question
Strategic systems planning is important because the plan

A) provides authorization control for the Systems Development Life Cycle
B) will eliminate any crisis component in systems development
C) provides a static goal to be attained within a five-year period
D) all of the above
Question
Describe two methods used to control the source program library.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/108
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 5: Systems Development and Program Change Activities
1
One-time costs include operating and maintenance costs.
False
2
Intangible benefits are not physical,but can be measured and expressed in financial terms.
False
3
The objective of systems planning is to link systems projects to the strategic objectives of the firm.
True
4
When determining the operational feasibility of a new system,the expected ease of transition from the old system to the new system should be considered.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
5
The Systems Development Life Cycle (SDLC)concept applies to specific applications and not to strategic systems planning.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
6
Recurring costs include: hardware maintenance,software acquisition,software maintenance,insurance,supplies,personnel costs.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
7
System maintenance is often viewed as the first phase of a new development cycle.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
8
An accountant's responsibility in the SDLC is to ensure that the system applies proper accounting conventions and rules and possesses adequate control.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
9
All of the steps in the Systems Development Life Cycle apply to software that is developed in-house and to commercial software.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
10
When preparing a cost-benefit analysis,design costs incurred in the systems planning,systems analysis and conceptual design phases of the Systems Development Life Cycle are relevant costs.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
11
When the nature of the project and the needs of the user permit,most organizations will seek a pre-coded commercial software package rather than develop a system in-house.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
12
Instead of implementing an application in a single big-bang release,modern systems are delivered in parts continuously and quickly
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
13
A tangible benefit can be measured and expressed in financial terms.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
14
Mixing technologies from many vendors improves technical feasibility.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
15
In the conceptual design phase of the Systems Development Life Cycle (SDLC),task force members are focused on selecting the new system design.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
16
Programs in their compiled state are very susceptible to the threat of unauthorized modification.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
17
The first step in the SDLC is to develop a systems strategy
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
18
Legal feasibility identifies conflicts between the proposed system and the company's ability to discharge its legal responsibilities
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
19
During the detailed feasibility study of the project,the systems professional who proposed the project should be involved in performing the study.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
20
The payback method is often more useful than the net present value method for evaluating systems projects because the effective lives of information system tend to be short and shorter payback projects are often desirable.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
21
Which control is not associated with new systems development activities?

A) reconciling program version numbers
B) program testing
C) user involvement
D) internal audit participation
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
22
When the auditor reconciles the program version numbers,which audit objective is being tested?

A) protect applications from unauthorized changes
B) ensure applications are free from error
C) protect production libraries from unauthorized access
D) ensure incompatible functions have been identified and segregated
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
23
Which level of a data flow diagram is used to produce program code and database tables?

A) context level
B) elementary level
C) intermediate level
D) prototype level
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
24
Firms with an independent internal audit staff may conduct tests of the system development life cycle on an ongoing basis.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
25
Which control is not a part of the source program library management system?

A) using passwords to limit access to application programs
B) assigning a test name to all programs undergoing maintenance
C) combining access to the development and maintenance test libraries
D) assigning version numbers to programs to record program modifications
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
26
Which statement is correct?

A) compiled programs are very susceptible to unauthorized modification
B) the source program library stores application programs in source code form
C) modifications are made to programs in machine code language
D) the source program library management system increases operating efficiency
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
27
Program testing

A) involves individual modules only, not the full system
B) requires creation of meaningful test data
C) need not be repeated once the system is implemented
D) is primarily concerned with usability
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
28
Which is not a level of a data flow diagram?

A) conceptual level
B) context level
C) intermediate level
D) elementary level
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
29
Which statement is not true?

A) An audit objective for systems maintenance is to detect unauthorized access to application databases.
B) An audit objective for systems maintenance is to ensure that applications are free from errors.
C) An audit objective for systems maintenance is to verify that user requests for maintenance reconcile to program version numbers.
D) An audit objective for systems maintenance is to ensure that the production libraries are protected from unauthorized access.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
30
Which test of controls will provide evidence that the system as originally implemented was free from material errors and free from fraud? Review of the documentation indicates that

A) a cost-benefit analysis was conducted
B) the detailed design was an appropriate solution to the user's problem
C) tests were conducted at the individual module and total system levels prior to implementation
D) problems detected during the conversion period were corrected in the maintenance phase
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
31
Source program library controls should prevent and detect unauthorized access to application programs.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
32
Maintenance access to systems increases the risk that logic will be corrupted either by the accident or intent to defraud.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
33
A cost-benefit analysis is a part of the detailed

A) operational feasibility study
B) schedule feasibility study
C) legal feasibility study
D) economic feasibility study
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
34
Which statement is not correct? The structured design approach

A) is a top-down approach
B) is documented by data flow diagrams and structure diagrams
C) assembles reusable modules rather than creating systems from scratch
D) starts with an abstract description of the system and redefines it to produce a more detailed description of the system
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
35
Which control ensures that production files cannot be accessed without specific permission?

A) Database Management System
B) Recovery Operations Function
C) Source Program Library Management System
D) Computer Services Function
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
36
The presence of a SPLMS effectively guarantees program integrity.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
37
Routine maintenance activities require all of the following controls except

A) documentation updates
B) testing
C) formal authorization
D) internal audit approval
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
38
The benefits of the object-oriented approach to systems design include all of the following except

A) this approach does not require input from accountants and auditors
B) development time is reduced
C) a standard module once tested does not have to be retested until changes are made
D) system maintenance activities are simplified
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
39
The user test and acceptance procedure is the last point at which the user can determine the system's acceptability prior to it going into service.
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
40
Evaluators of the detailed feasibility study should not include

A) the internal auditor
B) the project manager
C) a user representative
D) the system designer
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
41
Which type of documentation shows the detailed relationship of input files,programs,and output files?

A) structure diagrams
B) overview diagram
C) system flowchart
D) program flowchart
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
42
Examples of one-time costs include all of the following except

A) hardware acquisition
B) insurance
C) site preparation
D) programming
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
43
When converting to a new system,which cutover method is the most conservative?

A) cold turkey cutover
B) phased cutover
C) parallel operation cutover
D) data coupling cutover
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
44
Which of the following is not an advantage of commercial software? Commercial software

A) can be installed faster than a custom system
B) can be easily modified to the user's exact specifications
C) is significantly less expensive than a system developed in-house
D) is less likely to have errors than an equivalent system developed in-house
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
45
Computer operators should have access to all of the following types of documentation except

A) a list of users who receive output
B) a program code listing
C) a list of all master files used in the system
D) a list of required hardware devices
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
46
A tangible benefit

A) can be measured and expressed in financial terms
B) might increase revenues
C) might decrease costs
D) all of the above
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
47
System documentation is designed for all of the following groups except

A) systems designers and programmers
B) end users
C) accountants
D) all of the above require systems documentation
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
48
Which step is least likely to occur when choosing a commercial software package?

A) a detailed review of the source code
B) contact with user groups
C) preparation of a request for proposal
D) comparison of the results of a benchmark problem
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
49
Which task is not essential during a data conversion procedure?

A) decomposing the system
B) validating the database
C) reconciliation of new and old databases
D) backing up the original files
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
50
A commercial software system that is completely finished,tested,and ready for implementation is called a

A) backbone system
B) vendor-supported system
C) benchmark system
D) turnkey system
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
51
An example of an intangible benefit is

A) expansion into other markets
B) reduction in supplies and overhead
C) more efficient operations
D) reduced equipment maintenance
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
52
The detailed design report contains all of the following except

A) input screen formats
B) alternative conceptual designs
C) report layouts
D) process logic
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
53
An example of a tangible benefit is

A) increased customer satisfaction
B) more current information
C) reduced inventories
D) faster response to competitor actions
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
54
Typical contents of a run manual include all of the following except

A) run schedule
B) logic flowchart
C) file requirements
D) explanation of error messages
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
55
Examples of recurring costs include

A) software acquisition
B) data conversion
C) personnel costs
D) systems design
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
56
Intangible benefits

A) are easily measured
B) are of relatively little importance in making information system decisions
C) are sometimes estimated using customer satisfaction surveys
D) when measured, do not lend themselves to manipulation
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
57
The output of the detailed design phase of the Systems Development Life Cycle (SDLC)is a

A) fully documented system report
B) systems selection report
C) detailed system design report
D) systems analysis report
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
58
When implementing a new system,the costs associated with transferring data from one storage medium to another is an example of

A) a recurring cost
B) a data conversion cost
C) a systems design cost
D) a programming cost
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
59
The testing of individual program modules is a part of

A) software acquisition costs
B) systems design costs
C) data conversion costs
D) programming costs
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
60
Site preparation costs include all of the following except

A) crane used to install equipment
B) freight charges
C) supplies
D) reinforcement of the building floor
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
61
Project planning includes all of the following except

A) specifying system objectives
B) preparing a formal project proposal
C) selecting hardware vendors
D) producing a project schedule
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
62
The role of the steering committee includes

A) designing the system outputs
B) resolving conflicts that arise from a new system
C) selecting the programming techniques to be used
D) approving the accounting procedures to be implemented
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
63
Typically a systems analysis

A) results in a formal project schedule
B) does not include a review of the current system
C) identifies user needs and specifies system requirements
D) is performed by the internal auditor
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
64
One time costs include all of the following except

A) site preparation
B) insurance
C) programming and testing
D) data conversion
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
65
The accountant's role in systems analysis includes all of the following except

A) specify audit trail requirements
B) prepare data gathering questionnaires
C) suggest inclusion of advanced audit features
D) ensure mandated procedures are part of the design
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
66
The formal product of the systems evaluation and selection phase of the Systems Development Life Cycle is

A) the report of systems analysis
B) the systems selection report
C) the detailed system design
D) the systems plan
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
67
Which technique is least likely to be used to quantify intangible benefits?

A) opinion surveys
B) simulation models
C) professional judgment
D) review of accounting transaction data
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
68
When developing the conceptual design of a system,

A) all similarities and differences between competing systems are highlighted
B) structure diagrams are commonly used
C) the format for input screens and source documents is decided
D) inputs, processes, and outputs that distinguish one alternative from another are identified
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
69
Which of the following is not a tool of systems analysts?

A) observation
B) task participation
C) audit reports
D) personal interviews
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
70
A disadvantage of surveying the current system is

A) it constrains the generation of ideas about the new system
B) it highlights elements of the current system that are worth preserving
C) it pinpoints the causes of the current problems
D) all of the above are advantages of surveying the current system
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
71
The systems analysis report does not

A) identify user needs
B) specify requirements for the new system
C) formally state the goals and objectives of the system
D) specify the system processing methods
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
72
The role of the accountant/internal auditor in the conceptual design phase of the Systems Development Life Cycle includes all of the following except

A) the accountant is responsible for designing the physical system
B) the accountant is responsible to ensure that audit trails are preserved
C) the internal auditor is responsible to confirm that embedded audit modules are included in the conceptual design
D) the accountant is responsible to make sure that the accounting conventions that apply to the module are considered by the system designers
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
73
After the systems analysis phase of the System Development Life Cycle (SDLC)is complete,the company will have a formal systems analysis report on

A) the conceptual design of the new system
B) an evaluation of the new system
C) users' needs and requirements for the new system
D) a comparison of alternative implementation procedures for the new system
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
74
Systems analysis involves all of the following except

A) gathering facts
B) surveying the current system
C) redesigning bottleneck activities
D) reviewing key documents
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
75
Contrast the source program library (SPL)management system to the database management system (DBMS).
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
76
Recurring costs include all of the following except

A) data conversion
B) software maintenance
C) insurance
D) supplies
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
77
Aspects of project feasibility include all of the following except

A) technical feasibility
B) economic feasibility
C) logistic feasibility
D) schedule feasibility
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
78
Project feasibility includes all of the following except

A) technical feasibility
B) conceptual feasibility
C) operational feasibility
D) schedule feasibility
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
79
Strategic systems planning is important because the plan

A) provides authorization control for the Systems Development Life Cycle
B) will eliminate any crisis component in systems development
C) provides a static goal to be attained within a five-year period
D) all of the above
Unlock Deck
Unlock for access to all 108 flashcards in this deck.
Unlock Deck
k this deck
80
Describe two methods used to control the source program library.