النسخة 2الرقم المعياري الدولي: 978-0072328882 تمرين 2
Draw a CPM precedence diagram for the project and calculate the project schedule. Provide the schedule in a tabular form, showing early/late starts and finishes as well as the total and free float for each activity. Denote the critical path on the network. below is the CPM precedence diagram and the project schedule.
التوضيح
The CPM diagram and ...