expand icon
book Service Management: Operations, Strategy, Information Technology 8th Edition by James Fitzsimmons,Mona Fitzsimmons,Sanjeev Bordoloi cover

Service Management: Operations, Strategy, Information Technology 8th Edition by James Fitzsimmons,Mona Fitzsimmons,Sanjeev Bordoloi

النسخة 8الرقم المعياري الدولي: 978-1259010651
book Service Management: Operations, Strategy, Information Technology 8th Edition by James Fitzsimmons,Mona Fitzsimmons,Sanjeev Bordoloi cover

Service Management: Operations, Strategy, Information Technology 8th Edition by James Fitzsimmons,Mona Fitzsimmons,Sanjeev Bordoloi

النسخة 8الرقم المعياري الدولي: 978-1259010651
تمرين 6
The project network for building a garage is shown in Figure 16.11 and includes data on activity times and their deviations.
a. Develop a Monte Carlo simulation model that can be used to generate a distribution of project completion times (longest path from node 1 to 8).
b. Simulate 5 project completion experiences using random numbers from Appendix B. What is the expected project duration time?
The project network for building a garage is shown in Figure 16.11 and includes data on activity times and their deviations. a. Develop a Monte Carlo simulation model that can be used to generate a distribution of project completion times (longest path from node 1 to 8). b. Simulate 5 project completion experiences using random numbers from Appendix B. What is the expected project duration time?
التوضيح
موثّق
like image
like image

a. 
blured image blured image Random numbers are drawn for eac...