Table 15.3
A large distribution center uses some part-time employees in its workforce.Each part-time employee works a maximum of 80 hours per month.The workforce requirements (expressed as the number of part-time employees working the maximum regular time of 80 hours per month) are given in the following table for the next six periods. The relevant costs are:
Wages = $350/month/worker
Hiring cost = $100/worker
Layoff cost = $ 50/worker
Overtime cost = 150% of regular-time rate
The current workforce level is 60,and overtime cannot exceed 25% of regular-time capacity.
Use the spreadsheet approach to answer the following questions.
-Use the information in Table 15.3.Use a level strategy with overtime and undertime.Minimize undertime by maximizing overtime during the peak period.If the firm does not pay undertime,what is the total cost of the staffing plan including the cost of regular wages,hiring,and layoffs?
A) less than or equal to $158,000
B) greater than $158,000 but less than or equal to $160,000
C) greater than $160,000 but less than or equal to $162,000
D) greater than $162,000
Correct Answer:
Verified
Q94: Table 15.3
A large distribution center uses some
Q95: Table 15.1
Bart Incorporated manufactures rotary air fans
Q96: A specific time and a hotel room
Q100: A service provider assigns a specific time
Q101: Table 15.8
Suppose that the following five jobs
Q102: Table 15.9
Auto Data produces custom engineering testing
Q103: Table 15.9
Auto Data produces custom engineering testing
Q106: Job flow time is defined as the:
A)
Q107: The purpose of a rotating schedule is
Q118: The workforce schedule:
A) determines when employees work.
B)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents