The amount of overhead applied to jobs using a predetermined (budgeted) rate is rarely equal to the actual cost of overhead incurred for a period. Which of the following is not a valid explanation for this?
A) Actual spending for overhead is not equal to budgeted spending for overhead.
B) Actual use of the overhead allocation base is not equal to the budgeted use of the allocation base.
C) Budget estimates of overhead were unrealistically low.
D) Direct costs were unexpectedly high.
Correct Answer:
Verified
Q48: In calculating its predetermined overhead rate, a
Q49: For a particular period, Petersen's opening and
Q50: Howard Corporation has a job order costing
Q51: Product costs may be used for which
Q52: Which of the following industries are likely
Q54: Which of the following would appear on
Q55: Which of the following costs should be
Q56: Which of the following about using proration
Q57: Which of the following costs should managers
Q58: Select the relevant information from the following,
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents