In a BIP problem, 1 corresponds to a yes decision and 0 to a no decision. If there are two projects under consideration, A and B, and either both projects will be undertaken or no project will be undertaken, then the following constraint needs to be added to the formulation:
A) A ≤ B.
B) A + B ≤ 2.
C) A ≥ B.
D) A = B.
E) None of the choices is correct.
Correct Answer:
Verified
Q24: Binary variables can have the following values:
A)
Q25: A firm has prepared the following
Q26: If a firm wishes to choose at
Q27: Which of the following techniques or tools
Q28: Note: This problem requires the use
Q30: When binary variables are used in a
Q31: If a firm wishes to choose at
Q32: A firm has prepared the following
Q33: A firm has prepared the following
Q34: In a BIP problem with 2 mutually