At times, when a firm is considering an alternative such that a set of variables affecting a project are interrelated, then analysis that considers this interrelation could be performed. This is called:


A) a sensitivity analysis.
B) a scenario analysis.
C) a Monte Carlo simulation.
D) a horizontal analysis.