Cox Engineering Performs Cement Core Tests in Its Laboratory During March, the Laboratory Performed 2,000 Core Tests
Cox Engineering performs cement core tests in its laboratory. The following standards have been set for each core test performed:
During March, the laboratory performed 2,000 core tests. On March 1 no direct materials (sand) were on hand. Variable manufacturing overhead is assigned to core tests on the basis of direct labour hours. The following events occurred during March:
8,600 pounds of sand were purchased at a cost of £7,310.
7,200 pounds of sand were used for core tests.
840 actual direct labour hours were worked at a cost of £8,610.
Actual variable manufacturing overhead incurred was £3,200.
-
The materials quantity variance for March is
A) £900 favourable.
B) £1,950 favourable.
C) £1,950 unfavourable.
D) £ 900 unfavourable.
Correct Answer:
Verified
Q6: In general, the purchasing agent is responsible
Q7: The Geurtz Company uses standard costing. The
Q8: The Wright Company has a standard
Q9: The following labour standards have been
Q10: Managers should exercise considerable care in their
Q12: Variable manufacturing overhead is applied to products
Q13: Cox Engineering performs cement core tests
Q14: The Geurtz Company uses standard costing. The
Q15: Standard costs greatly increase the complexity of
Q16: Cox Engineering performs cement core tests
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents