The James MacGregor Mining Company owns three mines: I, II, and III. Three grades of ore, A, B, and C, are mined at these mines. For each grade of ore, the number of tons per week available from each mine and the number of tons per week required to fill orders are given in the following table.
Find the number of days that the company should operate each mine so that orders are filled at minimum cost. Find the minimum cost.
A) Minimum cost is $54,000 obtained by operating mine I for 2 days, mine II for 2 days, and mine III for 2 days.
B) Minimum cost is $93,400 obtained by operating mine I for 3 days, mine II for 3 days, and mine III for 4 days.
C) Minimum cost is $83,600 obtained by operating mine I for 2 days, mine II for 4 days, and mine III for 3 days.
D) Minimum cost is $74,600 obtained by operating mine I for 4 days, mine II for 3 days, and mine III for 2 days.
E) Minimum cost is $78,400 obtained by operating mine I for 4 days, mine II for 2 days, and mine III for 3 days.
Correct Answer:
Verified
Q87: A minimization problem is given. Solve its
Q88: In a laboratory experiment, two separate foods
Q89: Use the simplex method.
Minimize
Q91: State the following problem in a form
Q92: Use technology to solve the problem.
Minimize
Q93: Assume that each nurse works 8 consecutive
Q94: Use the simplex method.
Minimize
Q95: CDF Appliances has assembly plants in Atlanta
Q95: Use Excel or another technology to solve
Q100: Nekita Corporation assembles cell phones and camera
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents