Webster Manufacturing Inc. is implementing a Just-in-Time (JIT) system and wants to know how many Kanbans to use for the initial setup of its JIT system. The daily demand is 400 units and each Kanban (i.e., container) holds 15 units. The combined processing and waiting time per container is 0.7 days. If the initial alpha value for safety stock is 0.6 and the processing and waiting time is reduced by 30 percent due to job and process improvements, by how many units is the maximum authorized inventory reduced from the original Webster problem #23 and #24?
A) Less than 100 units
B) More than 100 but less than or equal to 200 units
C) More than 200 but less than or equal to 300 units
D) More than 300 but less than or equal to 400 units
Correct Answer:
Verified
Q35: Shine Motor Inc. has decided to switch
Q36: The number of Kanban cards is dependent
Q37: A(n) _ is a flag or a
Q38: A hinge manufacturing company employs a Kanban
Q39: A manufacturing company is using a two
Q41: Large batches often reduce teardowns and setups
Q42: The 5Ss focus on improving waste generated
Q43: Lean operating systems seek to apply the
Q44: Six Sigma addresses visible problems in processes;
Q45: Lean principles are always transferrable to front-office
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents