Unused capacity:
A) is a definite sign of wasted resources.
B) provides capacity for potential demand surges.
C) is intended for future use.
D) Both B and C are correct.
Correct Answer:
Verified
Q118: Whether managers adopt theoretical capacity as an
Q120: _ capacity utilisation is an average that
Q121: When actual production is below practical capacity,there
Q122: For benchmarking purposes,it is best to use
Q124: Practical capacity:
A)cannot be altered unless there is
Q125: When there are significant differences between practical
Q126: By highlighting the cost of capacity available
Q128: With which of the following do managers
Q155: Both theoretical and practical capacity measure capacity
Q172: Fixed manufacturing cost per unit will be
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents