The 'Industrial Engineering Method' Estimates Cost Functions

Question 25

Multiple Choice

The 'industrial engineering method' estimates cost functions:


A) using qualitative rather than quantitative analysis.
B) based on analysis and opinions gathered from various departments.
C) by analysing the relationship between inputs and outputs in physical terms.
D) quickly while incurring little cost.

Correct Answer:

verifed

Verified