In a lean system when a process is running smoothly:
A) workers are underutilized.
B) there is too little inventory in the system.
C) there is too much inventory in the system.
D) workers are overutilized.
Correct Answer:
Verified
Q23: In the water and rocks analogy for
Q24: A typical application of Lean would call
Q25: What is the difference between Lean and
Q26: _ could result in workers from one
Q27: One recent development in Lean thinking is
Q29: Provide a definition by description of the
Q30: A reduction in inventory levels forces a
Q31: In a two-card kanban system:
A)the production card
Q32: A kanban can be:
A)a container.
B)a card.
C)a visual
Q33: Once a system has been "leaned out"
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents