The bill of material module in the MRP II system is used to communicate the structure of a product,as it is in MRP.The MRP II system extends this module's capability to include
A) maintenance of engineering or product drawings from a CADD system.
B) the sequence of operations required to manufacture a component or assembly.
C) maintaining the assembly schedules for specific configurations.
D) creating a packet that contains order, material list, routing, and drawing information.
Correct Answer:
Verified
Q110: Which of the following is a way
Q111: Which of the following outputs from the
Q112: World Voice is a long-distance telephone service
Q113: The predetermined overhead application rate is computed
Q114: Presented below is a list of terms
Q116: In a production planning system,which of the
Q117: Presented below is a list of terms
Q118: In traditional accounting methods,predetermined overhead rates are
Q119: Totally computerized systems such as a quick
Q120: Presented below is a list of computer
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents