The static budget variance for materials is $200 F and the budgeted cost for materials is $52,000.If the budgeted volume is 13,000 and the actual volume is 13,500,what is the flexible budget variance?
A) $1,800 F
B) $2,000 F
C) $2,200 F
D) $3,000 F