Which desirable action that managers take to relieve bottleneck constraints of the assembly operation do managers note that the cost of poor quality at a nonbottleneck operation is the cost of materials wasted?
A) Eliminate idle time at the bottleneck operation.
B) Shift products that are not made on the bottleneck machine to nonbottleneck machines,or to outside processing facilities.
C) Reduce setup time and processing time at bottleneck operations.
D) Improve the quality of parts,or products,manufactured at the bottleneck operation.
E) Other operating costs will increase,while contribution margin will remain unchanged because bottleneck capacity of the assembly operation will not increase.
Correct Answer:
Verified
Q55: Managers can identify the bottleneck operations:
A)when they
Q56: Optimization techniques,such as linear programming,solve more complex
Q57: How do managers determine the most profitable
Q58: To determine product mix,managers maximize operating income,subject
Q59: In contrast to theory of constraints (TOC),activity-based
Q61: Overhead costs allocated to a sales office
Q62: What steps can managers take to manage
Q63: The manager at the Sports Shop sells
Q64: When managers make decisions about adding or
Q65: What factors must managers consider when they
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents