A BOM file is sometimes called which of the following?
A) Product structure tree
B) Stocking plan
C) Inventory usage record
D) Production parts plan
E) Time bucket schedule
Correct Answer:
Verified
Q21: Projected available balance is the amount of
Q24: In a net change MRP program, a
Q25: The lot-for-lot (L4L) lot-sizing technique minimizes carrying
Q27: The three main inputs to an MRP
Q31: The economic order quantity (EOQ) lot-sizing technique
Q37: The philosophy of material requirements planning is
Q37: The least total cost method (LTC) lot-sizing
Q38: The "theme" of MRP is getting the
Q39: Net change MRP reflects the exact status
Q46: A material requirements planning (MRP)system with information