A production line is to be designed for a job with three tasks. The task times are .3 minutes, 1.4 minutes, and .7 minutes. The minimum cycle time in minutes is:
A) .3.
B) .7.
C) 1.4.
D) 2.4.
E) .8.
Correct Answer:
Verified
Q43: Process choice is _ driven.
A)demand
B)operations
C)marketing
D)process
E)capacity
Q49: An operations strategy for process selection should
Q50: The substitution of machinery that has sensing
Q54: A group of machines including supervisory computer
Q59: Which of the following is not a
Q61: In which type of processing system would
Q63: Layout design has many objectives, one of
Q64: A service organization (for example, a hospital)
Q70: An example of automated services is
A)online banking.
B)build
Q76: Daily capacity of a product layout is
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents