Of the following,which is the best reason for using activity-based costing?
A) to keep better track of overhead costs
B) to more accurately assign overhead costs to cost pools so that these costs are better controlled
C) to better assign overhead costs to products
D) to assign indirect service overhead costs to direct overhead cost pools
Correct Answer:
Verified
Q88: Setup time is Q89: Relative to traditional product costing,activity-based costing differs Q90: Traditional overhead allocations result in which of Q91: Activity-based costing and activity-based management are effective Q92: Under activity-based costing,benchmarks for product cost should Q94: In allocating fixed costs to products in Q95: Which of the following is not a Q96: Traditionally,managers have focused cost reduction efforts on Q97: Which of the following have an Q98: In activity-based costing,final cost allocations assign costs
A)activities.
B)processes.
C)departments.
D)costs.
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents