When using earned value techniques,Actual Cost (AC)refers to realized cost incurred for the work performed on an activity during a specific time period.
Correct Answer:
Verified
Q1: Monitoring and controlling project work refers to
Q2: Some scope changes start as proposed changes
Q3: Perform Qualitative Risk Analysis is the process
Q4: It is often costly,difficult or even impossible
Q5: The Schedule Performance Index (SPI)is a measure
Q8: A tolerance limit is what the customer
Q9: The Cost Variance (CV)is a measure of
Q11: The control quality process deals with using
Q12: When reporting performance to sponsors and management,it
Q13: In a control chart,a point that occurs