For an attributes sampling plan,the tolerable deviation rate is 4.5%,the computed upper deviation rate is 7%,the sample deviation rate is 3%,and the desired confidence level is 95%.What is the allowance for sampling risk included in the computed upper deviation rate?
A) 1.5%.
B) 3%.
C) 4%.
D) 5%.
The computed upper deviation rate includes the sample deviation rate and the allowance for sampling risk. Therefore, if we subtract the sample deviation rate from the computed upper deviation rate, the difference is the achieved allowance for sampling risk, or 4% (7% - 3%) .
Correct Answer:
Verified
Q22: In determining the sample size for a
Q24: In which of the following cases would
Q28: Auditors who prefer statistical sampling to nonstatistical
Q29: Which of the following statements is correct
Q29: If auditors conducting attributes sampling found that
Q31: As a result of tests of controls,
Q31: When testing automated IT controls,the auditor is
Q34: An auditor is testing internal control procedures
Q36: A control is deemed to be more
Q39: Which of the following factors does an
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents