The time spent on setting up a machine is considered as waste in a lean production system.
Correct Answer:
Verified
Q4: A pull production system is based on
Q5: The main objective of a lean production
Q6: Production activities that are wasteful and do
Q7: Lean production concepts are only applicable to
Q8: The objective of "quality at the source"
Q10: A pull production process is appropriate to
Q11: Lean production systems use large batch sizes
Q12: Takt time is defined as the minimum
Q13: In a lean production system,anything that does
Q14: Lean producers generally use price as the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents