If an auditor calculated an upper limit rate of deviation of 5 percent when the tolerable rate of deviation was 4 percent,the auditor would conclude that
A) The population deviation rate is low enough to rely on internal control as planned.
B) The population deviation rate may be higher than that necessary to rely on internal control as planned.
C) The control risk can be assessed at planned levels.
D) The control risk should be assessed at lower levels.
Correct Answer:
Verified
Q21: In determining the number of documents to
Q24: An auditor is testing control procedures that
Q31: On the basis of attributes sampling,an auditor
Q35: Judgments about the frequency of control deviations
Q38: Which of the following does not have
Q40: In performing attributes sampling,the auditor will conclude
Q41: An auditor who tested 50 transactions and
Q43: In order for the auditor to decide
Q50: The procedures for statistical evaluation of tests
Q51: The sample size for a test of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents