The risk of underreliance is the probability that the evidence in the sample indicates
A) Low control risk when the actual operating effectiveness of the control does not justify a low control risk assessment.
B) Low control risk when the actual operating effectiveness of the control would justify a low control risk assessment.
C) High control risk when the actual operating effectiveness of the control would justify a lower control risk assessment.
D) High control risk when the actual operating effectiveness of the control would justify a higher control risk assessment.
Correct Answer:
Verified
Q4: As part of the assessment of control
Q6: As a result of sampling procedures applied
Q16: In performing tests of controls over authorization
Q18: For which of the following audit tests
Q22: The following are steps in attributes sampling:
Q23: An auditor interested in ensuring that all
Q24: Which of the following statements is correct
Q28: The ultimate purpose of control risk assessment
Q30: Which of the following sampling risks is
Q31: The purpose of tests of controls is
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents