Two troubleshooters handle service calls for 10 machines.The average time between service requirements is 18 days, and service time averages 2 days.Assume exponential distributions.While running, each machine can produce 1,500 pieces per day.Determine:
(A) the percentage of time troubleshooters are idle
(B) each machine's net productivity
(C) If troubleshooters represent a cost of $150 per day, and machine downtime cost is $600 per day, would another troubleshooter be justified? Explain.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q43: What is system utilization?
Q44: A department has 5 machines that each
Q45: When the waiting cost incurred by customers
Q45: A _ is one way of reducing
Q47: A multiple channel queuing system with a
Q48: A single-channel queuing system has an average
Q49: A department has 5 semiautomatic pieces of
Q50: What is average time in line for
Q52: A single bay car wash with a
Q53: A multiple channel system has customers arriving
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents