If an auditor calculated an upper limit rate of deviation of 5% when the tolerable rate of deviation was 4%,the auditor would conclude that
A) the population deviation rate is low enough to rely on internal control as planned.
B) the population deviation rate may be higher than that necessary to rely on internal control as planned.
C) the control risk can be assessed at planned levels.
D) the control risk should be assessed at lower levels.
Correct Answer:
Verified
Q21: In determining the number of documents to
Q22: An auditor is testing control procedures that
Q23: After examining sample items and classifying items
Q24: In planning a statistical sample for a
Q25: If an auditor tested 50 transactions and
Q25: Which of the following is not a
Q28: Which of the following is not true
Q29: In the study of internal control,the auditor
Q30: To statistically evaluate an attributes sampling application,the
Q34: In order for the auditor to decide
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents