Solved

If an Auditor Calculated an Upper Limit Rate of Deviation

Question 26

Multiple Choice

If an auditor calculated an upper limit rate of deviation of 5% when the tolerable rate of deviation was 4%,the auditor would conclude that


A) the population deviation rate is low enough to rely on internal control as planned.
B) the population deviation rate may be higher than that necessary to rely on internal control as planned.
C) the control risk can be assessed at planned levels.
D) the control risk should be assessed at lower levels.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents